Current location - Plastic Surgery and Aesthetics Network - Plastic surgery and medical aesthetics - Brief introduction to the content of budget quota standard for land development and consolidation projects in Henan Province
Brief introduction to the content of budget quota standard for land development and consolidation projects in Henan Province
1. Budget quota of land development and consolidation project in Henan Province: this quota is divided into earthwork, stonework, masonry, concrete, pipeline installation, agricultural well engineering, equipment installation, road engineering, plant engineering and auxiliary engineering, with a total of 10 chapter, 109 section and 1653 subtitle. Compared with the budget quota of the land development and consolidation project of the Ministry of Land and Resources in 2005 (hereinafter referred to as the quota issued by the Ministry), it has increased by 7 items, 138 subtitle. In order to adapt to the development of social productive forces in Henan province and meet the actual needs of land consolidation, combined with the characteristics of Henan province, it is suitable for both mountainous and hilly areas, plain areas and mechanized developed areas, so that the budgeting of remote mountainous areas and small projects can be well documented.

This quota is applicable to the land development and consolidation project in Henan Province, and it is the consumption standard of labor, materials and construction machinery required to complete the valuation of the sub-projects of the specified units of measurement; It is the basis for compiling the budget of Henan land development and consolidation project, determining the project cost, and compiling the pre-tender estimate and final accounts of the project. At the same time, it can be used as a reference for compiling the tender offer of land development and consolidation projects.

2. The shift fee quota of construction machinery for land development and consolidation projects in Henan Province: this quota includes: earthwork machinery, foundation treatment equipment, concrete machinery, transportation machinery, lifting machinery, auxiliary equipment and other machinery, with a total of 225 subheads; Compared with the quota issued by the Ministry, it is increased or decreased according to the actual situation: for example, it is more practical to increase the hydraulic excavator by 0.25m3, 0.3m3, 1.6m3; Add slotting machine, water gun and sludge discharge steel pipe; A forced concrete mixer is added; A sewage pump with a power of 22kw was added; Add hot-melt welding machine and generator set. Cancel the unused high-power 176kw bulldozer in land consolidation in Henan Province; The flat trailer with load 100t was cancelled; Multi-stage centrifugal water pump with power of 4 10kw, etc.

This quota is based on machine-team.

3. Interim Provisions on Budget Preparation of Land Development and Consolidation Projects in Henan Province: Compared with the quota issued by the Ministry, there are the following changes: adjusting labor wages; Take price control measures for major building materials; Changes in other expense rate forms;

The budget of the land development and consolidation project in Henan Province shall be compiled by the relevant personnel or units organized by the project undertaker, and the budgeting unit shall be responsible for the quality of its compilation. The Henan Provincial Department of Finance and the Department of Land and Resources shall be responsible for the management and interpretation of these Provisions.