Simple greenhouse contract model 1
Party A (Contractor):
ID number:
Detailed address:
Contact information:
Party B (employer):
ID number:
Detailed address:
Contact information:
1, the contract is valid for years.
2. Amount of contract fee: RMB yuan will be paid for each greenhouse every year. After the contract expires, the deposit will be returned to Party A without dispute.
3. Payment method: The contract fee and deposit shall be paid at the same time on the day when the contract is signed, which shall be subject to the receipt issued by Party B and shall not be defaulted.
4. Party B's greenhouse is located in, covering an area of mu.
5. The water, electricity, gas and other related production materials in Party B's production and operation shall be supplied by Party B, and the expenses arising therefrom shall be borne by Party B..
6. During the contract period, if the state levies relevant taxes and fees, it shall be implemented in accordance with national policies and shall be borne by Party B. ..
7. The greenhouse is only used for the production of economic crops such as vegetables and fruits, and Party B shall not change its production purpose, appearance and appearance without authorization. Other buildings shall not be demolished and rebuilt without permission, otherwise Party A has the right to rectify within a time limit. If Party A fails to rectify within the time limit, Party A has the right to forcibly dismantle and terminate the contract. All losses shall be borne by Party B, and the contract fee and deposit shall be refunded.
8. Party B shall protect the contracted greenhouse. If losses or losses are caused, Party B shall bear them by itself and compensate Party A for three times the actual losses.
9. The greenhouse contracted by Party A has the right to subcontract to others for operation.
10. During the contract period, if the state production and enterprise plan to requisition land, both parties shall terminate the contract according to the needs of the state enterprise. If the land acquisition department gives compensation for young crops according to the relevant national policies, it will compensate Party A according to the actual occupied area of young crops and return all the contracting costs to Party A. ..
1 1. Party B must abide by and implement all management regulations of Party A. ..
12. For matters not covered in this contract, both parties shall reach a supplementary agreement through negotiation.
13. This contract is confirmed once a year and signed by Party B after paying the contract fee.
14. This contract is made in triplicate, two for Party A and one for Party B. ..
Party A: Party B:
Year, month, sun, moon, sun.
Simple greenhouse contract model II
Party A:
Party B:
Through negotiation between Party A and Party B, based on the principle of equality and mutual benefit, the following agreement is reached on related matters:
I. Construction standards
1, the wall must be 2.0 m (0.2 m) wide, the bottom 5 m (0.2 m) wide, the planting width 8.5 m, five layers of compaction, and the ratio of inner front wall to 1 m.
2. Flat shed bottom: the horizontal difference between east and west is not more than 20CM.
Second, the contracting and payment methods
1, meet the second article of the construction standard, and calculate the contract fee according to the actual rolling length of the wall, with 80 yuan per meter.
2. After Party B's construction machinery is in place, it will pay 30,000 yuan in advance for diesel oil for five sheds, and settle the payment for five sheds for each completed shed, and so on.
Third, the measurement method
The length of two anchors from the east anchor to the back wall of a single shed, each shed is 9 meters, and the side gables.
Four. Responsibility of both parties
(1) Party A's responsibilities:
1. Party A shall make ground design and construction drawings according to technical requirements, so as not to delay Party B's construction.
2. Party A is responsible for the rainproof coverage of the shed handed over by Party B. ..
3. Party B shall provide accommodation and dining places at its own expense.
4. Raise and pay Party B's contract fee in time according to the provisions of Article 2 of this contract.
5. Party A should pay attention to the roads on the construction site in advance. If the flatbed car can't get in, it needs to be driven into the construction site by machinery. Party A shall coordinate with relevant highway units, and Party B shall not be responsible for rolling the pavement.
6. Party A is responsible for coordinating the handling of unexpected events outside the construction, avoiding the interference of external factors and ensuring the normal construction of Party B. In case of mechanical and personnel injuries caused by Party B's interference, Party A shall bear the losses.
(II) Party B's responsibilities:
1. Carry out the construction in strict accordance with the requirements of buildings and greenhouses, and achieve the construction quality. In case of rework due to quality and other reasons, Party B shall bear all responsibilities.
2. Party B shall organize machinery, carry out construction in time and complete the project as soon as possible.
3. Obey Party A's command and mobilization, and strictly abide by Party A's relevant regulations and construction standards for construction.
4, after the completion of the project is responsible for repairing the roadside fence, the road surface should be simple and flat.
5. Party B does not provide tax receipts.
Both parties shall strictly abide by the above contract terms. This contract is made in duplicate, one for each party, and it will take effect immediately after signing.
Party A (signature) and Party B (signature)
Simple greenhouse contract model 3
Party A: Dongying Wuzhoufeng Ecological Agriculture Co., Ltd.
Party B: ID card:
Based on the principles of equality, mutual benefit, voluntary compensation and good faith, Party A and Party B have reached the following agreement on the Greenhouse Contract. 2 1 Through negotiation.
Article 1 Contract Location and Area
Dongying Wuzhou Feng Ecological Agriculture Co., Ltd. is located in Liuhu Town, Dongying District.
Article 2 Term of Contract
From the date of165438+1October 0 1 to the date of1October 30, 20_.
Article 3 Contract Fees and Payment
The annual contract fee is 3,000 yuan, say 3,000 yuan only.
Pay first and then use. Party B shall pay the contract fee for the first year on the date of signing this Agreement; In the future, the contracting fee for the following year will be paid in one lump sum before September 30 every year.
Article 4 Rights and obligations of both parties
1. Party B will only use the above land for planting, and only plant crops harvested in the current year. No new year plants such as saplings shall be planted, and no permanent buildings and facilities shall be built on them. Party B shall not sell, donate or exchange the soil on the land with others, nor transport or allow others to transport the soil. If Party B violates the above agreement, Party A has the right to terminate this agreement, and all losses caused thereby shall be borne by Party B. ..
2. During the contract period, Party B shall not transfer, lease or mortgage the land.
3. During the contract period, Party B shall not damage dams, surrounding channels, houses, greenhouses, pigsty and other buildings, structures and trees.
4. Party B's investment in land leveling, fertilization and channel construction during the contract period will be regarded as short-term behavior. If Party A takes back the land use right according to this agreement, Party A will not compensate Party B for the above investment.
5. If Party B causes property loss or personal injury to others or property or personal injury to Party B or its staff in the process of planting, production and nursing, Party B shall bear the responsibilities.
6. Party B completely obeys the unified management of Party A's company. The crops planted shall not use any chemicals or drugs that will produce pesticide residues.
Article 5 Modification and rescission of the Agreement
(1) Both parties can negotiate to change the agreement.
(II) In any of the following circumstances, Party A has the right to dissolve this Agreement without compensating Party B for the losses incurred:
1. Party A or a third party approved by Party A needs dredging, earthwork traction, water conservancy project, etc.
2. Party B fails to pay the contract fee for more than two months;
3. Due to the adjustment of laws and regulations or national land policy, the land use policy of Dongying City or district government and Shengli Oilfield, or the major land policy adjustment of Shanda Group, the above-mentioned units need to use land for development or construction;
4. The land or part of it is used for oil field exploration, drilling, oil production, pipeline laying, etc. Because the land use mentioned in this item.
5. The overall planning and construction of Dongying Wuzhoufeng Ecological Agriculture Co., Ltd. needs to change the land. ..
(3) If Party B terminates this Agreement, it shall notify Party A two months in advance. If Party A agrees with Party B to terminate this Agreement, it will not refund the land contract fee of the current year.
Article 6 Liability for breach of contract
If Party B violates this Agreement, it shall pay 10% of the annual contract fee to the other party and compensate the other party for its losses.
Article 7 Dispute settlement methods
All disputes arising from the performance of this Agreement shall be settled by both parties through friendly negotiation; If negotiation fails, one party may bring a lawsuit to the people's court where the agreement is signed.
Article 8 Other agreements
This agreement shall come into effect after both parties sign and pay the contract price.
This agreement is made in duplicate, each party holds one copy, which has the same legal effect.
Party A: (signature) Party B: (signature)
Representative signature: Representative signature:
Signing time: year month day
Signing place: Liu Hu Ecological Park of Dongying Wuzhoufeng Agricultural Ecology Co., Ltd.
Copy of ID card pasted on:
Paste location of payment receipt:
Three articles about the standard of simple greenhouse contract mode;
★ Three simple models of greenhouse contract.
★ Simple greenhouse contract model
★ Three demonstration contracts for vegetable greenhouses.
★ 3 Contract Agreement for Vegetable Garden Greenhouse
★ The latest greenhouse contract mode.
★ 3 templates for greenhouse contract
★ Latest greenhouse contract 3.
★ 3 sample contracts for color steel greenhouses.
★ The latest model of vegetable garden greenhouse contract.
★ Model greenhouse contract