Hanging putty during renovation is a long-term job. Many painters will give owners 20 days during construction. Many owners who do not understand often feel that painters are often lazy and do not work. For people, actually, after the putty is hung on the wall, polished, and then the next process is completed, how long after putty can it be polished when the putty has a drying period? 1. How long does it take to polish and polish the cement on the putty wall?
Under normal circumstances, no one can accurately answer how long it will take to solve this problem. You should see the thickness of the putty. If the wall is uneven, you have used too much putty and the drying time will increase accordingly. And the weather, if the weather is warm and hot, the putty will dry faster. If it is a rainy day, the humidity is high and the temperature is low, it is difficult for the clay to dry at this time. Under normal conditions, the thickness of the putty is uniform and the weather is good. Next, the putty takes about 2 days to dry before polishing. 2. The cement on the putty wall needs to be polished with putty
Putty is the main material for decorating the ceiling of a room. Whether it is home decoration or tools, it is definitely the most commonly used. The function of putty is to ensure that the wall surface is smooth and improve the decoration of paint, wallpaper and other decorations. Normal home improvement putty is scraped 3 times and then ground. 3. The cement on the putty wall needs to be polished. How to use putty
1. Putty is usually entered after the masonry work is completed. After the mud has been brushed on several walls, the first rough processing is completed with putty, the second layer is fine and smooth, and the third layer is smooth; construction generally starts with the first layer of glue being the thickest, and the third layer of putty being the thickest. Thin, the first layer is applied to the base, especially the corners of the yin and yang are horizontal and the concave and convex walls correct themselves; the second layer is complete; the third layer is surface treatment. Surface preparation includes treating some holes, stripping and hollow parts to ensure the perfect structure of the paint or other walls.
2. Under normal circumstances, the first building layer of putty is 3 days, the drying time is about a week, the second layer of the structure is about 2 days, the drying time is 3 days, the third layer It takes about 2 days to finesse and the drying period is also 2 days. It can be polished.