The approved total investment is 654.38+0383 billion yuan, and the construction period is 5 years. Among them, Hami has a total length of about 35.44 kilometers and an investment of nearly 26 billion yuan (converted by kilometers, including land acquisition and demolition). ). The construction of Hami section of Lanzhou-Xinjiang High-speed Railway is divided into four sections (LXTJ 1-LXTJ4 of Lanzhou-Xinjiang Second Line), which were won by China Railway 20th Bureau, CCCC No.3, China Railway No.1 and China Railway No.4 respectively. The investment is nearly16.583 billion yuan (the total investment in the contract section of LXTJ 1-LXTJ4 of Lanxin Second Line). Among them, the first bid section of Lanzhou-Xinjiang high-speed railway (LXTJ 1) starts from Hongliuhe (DK11/KLOC-0+679) on the border of Gan Xin Province, and reaches the southwest side of Sitian Station of Lanzhou-Xinjiang Railway in the west (DK1+). 20 10 China Railway 20th Bureau won the bid and entered the site for construction. The second bid section (LXTJ2) of Lanzhou-Xinjiang Second Line starts from the southwest side of Sitian Station of Lanzhou-Xinjiang Railway in the east (DK11+000) and ends at the east side of Yandun Station of Lanzhou-Xinjiang Railway in the west (DK 1245+000).
54.00km, with a total investment of 2105.52 million yuan. On April 20 10, CCCC No.3 Waterway Bureau won the bid and entered the site for construction. The third bid section (LXTJ3) of Lanzhou-Xinjiang Second Line starts from the east of Yandun Station (DK 1245+000) and ends at the east of Hami Station (DKl300+600) of Lanzhou-Xinjiang Railway, with a total length of 55.60Km and a total investment of 3,707.46 million yuan. 20 10 China Railway No.1 Bureau won the bid and entered the site for construction.
Section 4 (LXTJ4) of Lanzhou-Xinjiang High-speed Railway starts from Hami Station (DKl300+000) of Lanzhou-Xinjiang Railway in the east and ends at the junction of Hami and Turpan (DK 1489+000) in the west, with a total length of 179.0 17km and a total investment of 83.347 million yuan. In June 2009, China Railway Fourth Bureau won the bid, and in March 2065, it entered the site at 438+00. On June 24, 2009, the National Development and Reform Commission approved the proposal for the second double-track project of Lanzhou-Xinjiang Railway [3], including: the whole line is designed according to the national railway grade I and double-track electrification, and the speed target value is 200 km/h, of which 250 km/h is reserved for off-line projects from Lanzhou to Xining and Hami to Urumqi [4]. The newly-built railway is a trunk railway that pays equal attention to both passenger and freight recently. As the main railway channel connecting the three northwestern provinces with the mainland, the long-term will be mainly passenger transport, taking into account freight [5]
Moreover, it has been included in the national "Twelfth Five-Year" comprehensive transportation system planning (201March 2).
It can be seen that the project is actually the Lan Xin Express Railway: 1) The original project was the national railway level, which was lower than the high-speed railway level in China, and the highest category in the national railway level was the express railway. 2) The speed of on-line engineering is 200 kilometers per hour, which is also the standard of high-speed railway, which is lower than that of China (many people call high-speed railway). 3) The off-line project is complicated: the speed of Xining-Hami section is 200 kilometers per hour, and the conditions of Lanxi section and Hawu section are reserved for 250 kilometers per hour, which is generally also the condition of fast railway. -There are rumors that the underground foundation is 350 kilometers, which is not in conformity with the project approval document, and no evidence of the revised version is provided. 4) Passenger and cargo use. -People call the project Lan Xin Second Line Lan Xin High-speed Railway, which is a misunderstanding or a good wish before upgrading.