Bored embedded steel beam bracket
The support method adopts D400 auger drill to drill holes and extends to the bottom of the groove1~1.5m. I-beams are laid in the holes, I-beams and cross braces are fixed with the excavation, and soil retaining plates are erected, and the square wood is placed between the I-beams to avoid pressing the soil retaining plates.
Scope of application When the groove depth is more than 4m, the straight groove may collapse.