Generally, the decoration drawings will be drawn first in the early stage of decoration to facilitate the smooth progress of the later decoration work. Before drawing, the actual measurement should be carried out at the construction site to determine the distribution and height of kitchen pipes, the placement position of kitchen utensils and ventilation window in the kitchen, and then the plane sketch that conforms to the actual kitchen should be designed according to the actual measured size.
Installation Step 2: Preliminary Preparation
Determine the installation height of the grille ceiling, in which the interlayer in the middle should be more than 30CM, and plan the horizontal lines at the four corners of the ceiling with Mo Dou Line to facilitate the decoration at the back. At the same time, the position of the vent should be determined, and then a round hole with a diameter of 10CM should be made with an electric drill, followed by the embedding treatment of wires, water pipes and gas pipelines. Pay special attention to these important equipment in the process. If they fail to pass the inspection, they may all be reworked.
Installation Step 3: Install the corner line.
Mark the bottom of the horizontal line according to the horizontal line at the four corners of the previous step. The general distance is 10- 15CM. At the same time, drill a 4mm round hole with a depth of about 30 mm According to the angle of the corner, cut both ends of each corner line into half a corner, and the corner is generally at a right angle of 90, so it is generally cut into 45, and fasten the corner line with 4×20 self-tapping screws, thus completing the installation of the ceiling corner line.
Installation Step 4: Install the main keel.
First of all, fix the battens, measure the distance 30MM above the corner line of the grid, and remember it with ink lines. Then play the horizontal line about 40MM above the horizontal line, use an electric drill to make a round hole of 8- 10MM, and drive the batten into the hole. Jiuzheng Home Network reminds that the battens should not be exposed. Then use ordinary steel nails to nail the battens to make them stable, and finally use 4* 15 tapping screws to fix the main keel on the battens.
Installation Step 5: Install the host
Before installing the host, you should try to install it with aluminum gusset plate, so that you can successfully complete the installation of the host. Install the main engine on the triangular keel according to the drawing, drill a hole of 2.5 mm on the actually planned board surface with an electric drill, and install the tapping screw of the main engine firmly on the triangular keel. At the same time, it is necessary to install two main equipment of integrated ceiling, namely lamp heating host and air heating host. After all hosts are installed, the power-on test should be carried out.