Current location - Plastic Surgery and Aesthetics Network - Wedding supplies - Interior design process: from initial contact to scheme confirmation
Interior design process: from initial contact to scheme confirmation
Interior design is a complicated process, which needs careful planning and design through many links. This paper will introduce the process of interior design, from initial contact to scheme confirmation, to help readers better understand the whole picture of interior design.

first contact (of an eclipse)

Contact with Party A for the first time, and deeply understand the basic information of design objectives and Party A's expectations. This is the first and most critical step in interior design.

on-the-spot investigation

On-the-spot investigation, refer to the original architectural drawings, and ensure to master the details of the design objectives and infrastructure. This is the second step of interior design, which requires a comprehensive understanding of the design objectives.

Creative display

Creative display, drawing preliminary graphic design and concept sketch. This is the third step of interior design, which needs to transform the designer's creativity and ideas into visual drawings.

* * * with comments

Review with Party A to confirm the plane layout, design concept and core concept. This is the fourth step of interior design, which requires full communication and consultation with Party A. ..

Formal design scheme

Make a formal design plan and present the renderings vividly. This is the fifth step of interior design, and the preliminary design scheme needs to be further improved and refined.

Scheme confirmation

After the renderings are approved, they will be transferred to the construction drawing stage. Complete the confirmation of the design scheme and get the formal approval of Party A. This is the sixth and seventh step of interior design, which needs to be confirmed repeatedly with Party A. ..

sort out data

Arrange the design scheme data to ensure smooth technical docking with the construction unit. This is the last step of interior design, and the data of design scheme need to be sorted out and improved for subsequent construction acceptance.