2. Prepare to install equipment and materials: The equipment and materials needed to install the salute include radiation tube, gun tube, launcher, ignition device, ignition battery, firecrackers, etc. Sufficient tools and materials, such as screwdrivers, wrenches, brackets, expansion bolts, etc. , also need.
3. Determine the installation position and direction: Before installing the salute, it is necessary to determine the installation position and direction to ensure that the salute can fire shells normally. At the same time, safety factors should also be considered, such as avoiding facing crowds and flammable items.
4. Installation of launch tube and barrel: To install barrel, two barrels need to be fixed with screws. This process requires more force to keep the two barrels parallel and symmetrical, and double inspection is needed after fixation. When installing the launch tube, it needs to be inserted into the port of the barrel and fixed with bolts.
5. Installation of launch base and ignition device: When installing launch base, it needs to be placed at a height of about 40-50 cm from the ground and fixed with expansion bolts to ensure firmness. When installing the ignition device, it needs to be fixed at the rear end of the launch tube, and ensure that the ignition battery and ignition circuit are correct.
6. Testing and debugging: After installation, testing and debugging are needed to ensure that the salute can fire shells normally. During the test, multiple test shots should be carried out to ensure that each shell can reach the predetermined height and position accurately.
7. Use and maintenance: When using salute, you need to pay attention to safety and usage specifications to avoid possible accidents. At the same time, it needs regular maintenance to ensure the performance and quality of salute and prolong its service life.