(1) After the gantry fabrication (assembly) is completed, the inspection and acceptance shall be organized according to the design requirements.
(2) In addition to the static load test, the movable gantry should also run back and forth on the track with equal load to check the deformation, gauge and track flatness of the gantry during the movement.
(3) When lifting heavy objects for horizontal movement, the heavy objects should be lifted to more than 0.5m where there may be obstacles; During operation, the suspended heavy objects shall not swing from side to side.
(4) The traction mobile gantry must be started at the same time and run at the same speed when walking across the pier.
(5) When starting and stopping the motor, the controller should be operated slowly and smoothly; When moving backwards, you must wait for the machine and objects to stop completely before operating.
(6) When the gantry is dismantled, safety technical measures shall be formulated.
For more information about project/service/procurement bidding, and to improve the winning rate, please click on the bottom of official website Customer Service for free consultation:/#/? source=bdzd
First, advertising production.
Public relations is a common skill and plug-in in the field of post-production of film and television. Main