The steps of installing the bamboo water dispenser base are as follows:
1. First, you need to confirm the installation location. The base of bamboo drinking fountain should be installed on a flat ground, not on an inclined or uneven ground. In addition, it is also necessary to ensure that facilities such as water pipes and power sockets can be easily accessed.
2. Place the base of the drinking machine in the installation position, and then insert the water source pipeline and the power cord plug junction box frame into the corresponding jack.
3. Drill holes in the screw holes of the base, and then install the base with expansion screws. Note: The screw holes should be drilled deep enough to ensure that the screws can firmly fix the base.
4. After installing the base, plug in the power cord and water pipe, turn on the water switch, and check whether the water flow is normal and the power supply is normal.
5. Finally, clean the base and periphery of the drinking fountain to ensure the sanitation of the whole installation process.
It should be noted that the levelness and stability of the bamboo drinking fountain base must be ensured during installation, so as to avoid tilting and shaking during daily use, which will affect the normal operation of water flow. In addition, it is also necessary to ensure the tightness of the water source pipeline to avoid water leakage or damage, which will cause harm to people and the environment.
In a word, the correct installation of the bamboo drinking fountain base is the basis of the normal work of the drinking fountain, and it should be carefully operated according to the specific situation to ensure the safety, stability, hygiene and convenience of the drinking fountain.