Project payment application report
Project Payment Application Report (15)

With the continuous improvement of personal quality, reporting is closely related to our lives. When writing a report, we should pay attention to the accuracy and conciseness of the language. Are you still at a loss about writing the report? The following is the project payment application report I compiled. Welcome to reading. I hope you will like it.

Project Payment Application Report 1 Project Payment Application Form

Project name:

To: (supervision unit)

We have finished the work. According to the agreement in the construction contract, the construction unit shall pay * * * (in words) (in figures: RMB) before. Now submit the payment application form, please review and issue the project payment certificate.

note:

Contractor unit

Project manager

date

Project payment application report 2 pc supervision headquarters:

Dabancheng Heat Pump Station for West-East Gas Transmission undertaken by our unit is under construction, with 70% of the total civil works completed and 80% of the total process installation completed. Construction shall be carried out in strict accordance with the overall planning requirements of epc, and the project shall be completed within the node construction period specified by epc on the premise of ensuring safety, quality and construction period.

So far, the civil construction cost of our unit has reached about 5 million yuan, and the installation cost has reached 3 million yuan. The settlement price of the valve room in the line has been basically approved at about 2.9 million yuan, and the epc project department has not allocated the progress payment to our unit (valve room and Dabancheng heat pump station). As our contribution to the project has exceeded its affordability, our finance department has stopped allocating funds to the site. The on-site project funds have all been used up, and the subsidies for construction workers have not been paid, which has seriously affected the construction mood of workers. Application report for project payment. Urgently hope that through the coordination of supervision headquarters, the project progress payment will be allocated to our unit to ensure the smooth progress of the project. If the progress payment cannot be paid as soon as possible, Dabancheng heat pump station will be in danger of shutdown, which will seriously affect the overall construction progress of the entire western pipeline and the consequences will be unimaginable. Our unit also dare not undertake such a great responsibility, so please ask the supervision headquarters to give coordination and help as soon as possible.

xxx

Xx,xx,XX,XX

Project payment application report 3 xx Construction Engineering Bureau:

My unit XX years of construction of XX project schedule for XX million yuan, the cumulative completion of the project schedule of XX million yuan. As of the payment date, our company * * * has received the project payment of XX million yuan, and this time we apply for the project progress payment of XX million yuan as stipulated in the contract.

Attachment: 20xx Monthly Project Progress Report

Construction unit: (official seal)

Time:

4 Huida Real Estate Development Company Project Payment Application Report:

The project of 3-4# building in Xincheng Square has been arranged according to the construction plan of your development company this year, and our unit has exceeded the task. My unit plans to stop the project in winter after the completion of the 22-story main structure on the ground in XX1October 3 165438. After the shutdown, we need to settle a lot of labor and material costs for this project. Our unit has paid a large amount of project funds in advance during the construction process. At present, our company is very short of funds and has been unable to pay the arrears of labor and materials. Here, my unit applies for the construction unit to allocate 5 million yuan before the project is stopped to solve the urgent need.

Please ask the construction unit to consider the current practical difficulties of our unit and give an early reply.

Submitted by: Benxi Zhenhua Construction Engineering Co., Ltd.

Applicant: xxx

Xx,xx,XX,XX

5 _ _ _ _ _ Development and Construction Co., Ltd. Project Payment Application Report:

We have completed the work of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Our contract (agreement) payment application form has also been submitted to you. However, because it takes a long time for your company to review the project payment, in order to ensure the normal operation of the project progress and prevent the project from stopping due to the influence of the project payment, in order to meet the urgent need, our company applies for your company to pay in advance (in words) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Attachment: (Contract (Agreement) Payment Application Form; Contract (agreement) payment record list;

Project management confirmation report; A payment list of contract terms).

Employer: _ _ Construction Co., Ltd.

Project leader: _ _ _ _ _ _ _

Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Project payment application report 6 Our company has completed the second bid section of your xx Garden Project 1-4 building, and the structural parts of 1 main building 1 and 2 buildings have been completed to 18 floor, 19 floor, and1and 2 buildings have been renovated to 9 floor respectively. The basement structure is 2500 m2 water and electricity embedded. Our contract (agreement) payment application form has also been submitted to you. However, because your company needs a process to review the project payment, in order to ensure the normal operation of the project progress and prevent the project from stopping due to the influence of the project payment, for emergency needs, our company applies for your company to advance the project payment of (in words) xx million yuan only and (in figures) xx0000.00 yuan in advance to solve the current labor wages and some materials. The application form for project payment is now submitted, please review and issue the project payment book.

Attachment: (Contract (Agreement) Payment Application Form; Contract (agreement) payment record list;

Project management confirmation report; A payment list of contract terms).

Construction unit: xx Construction Co., Ltd.

Project leader:

Date: xx, xx, xx, XX

Project Payment Application Report Example 2

Xx construction engineering bureau:

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ refers to any one of _ _ _ _ _ _ _ _ _ _

Attachment: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Construction unit: (official seal) _ _ _ _ _ _ _ _ _ _ _ _

Project Payment Application Report Example 3

Xx construction engineering bureau:

The _ _ _ _ _ project built by our company began in _ _ _ _ _ _ _ _ _ _ _.

Attachment: Statement (or Audit Report)

Construction unit: (official seal) _ _ _ _ _ _ _ _ _ _ _ _

7 Huian County Urban and Rural Construction Investment Management Co., Ltd. Project Payment Application Report:

The projects of Planning No.4 Road, Planning No.5 Road and Dongfeng Road in the south of Hui 'an New District undertaken by our unit have been completed and put on record, and the final accounts have been audited by the financial department. The financial audit fund is 65,438+0,862,036 yuan, and the progress payment has been paid: 65,438+0,439 yuan, 800 yuan. Now, the application is made to pay the project settlement balance of RMB four hundred and twenty-two thousand two hundred and thirty-six yuan.

I hereby report it.

Fujian yongjian construction co., ltd

September 13, xxx.

Project Payment Application Report 8 Dear Leader of China Storage Xianyang Logistics Center:

Our company has completed all the construction contents of the civil engineering of China Xianyang Decoration Building Materials Market Project, and has completed the acceptance. Now I apply to pay 26 10000.00 yuan, and hope the leader will approve it.

I hereby report it.

Zhongshiye group co., ltd

Zhongchu Xianyang building materials market projects department

Person in charge:

February 2nd, xxx.

9. Zhongshan Aoyuanfang XX Development and Construction Co., Ltd. Project Payment Application Report:

Our company has completed the second bid section 1-4 of Shi Jia Garden Project of Zhongshan Aoyuan Jinyu, and the structural parts of bid sections 10# main building 1 2 have been completed to 18 floor, 19 floor and 1 2 floor respectively. The basement structure is 2500m2;; Embedded water and electricity, etc. Our contract (agreement) payment application form has also been submitted to you. However, because your company needs a process to review the project payment, in order to ensure the normal progress of the project and prevent the project from stopping due to the influence of the project payment, in order to solve the urgent need, we apply for your company to advance the project payment of (in words) four million yuan only (in figures) in order to solve the current labor wages and some materials. The application form for project payment is now submitted, please review and issue the project payment book.

Attachment: (Contract (Agreement) Payment Application Form; Contract (agreement) payment record list; Project management confirmation report; A payment list of contract terms).

Construction unit: Sichuan XX Construction Co., Ltd.

Project leader:

Date: May 26th, 20×× year

To: Hunan Yaogangxian XX Co., Ltd.

The sewage pipe project of the technical transformation comprehensive project of Yuxin polymetallic deposit, which was undertaken by our company, started in June of 20xx. In May, the total project price was 35,565,438+065,438+0765,438+06 yuan. According to the construction contract, your company should pay the project progress payment of 26,382,836 yuan (including advance payment), but actually paid the project progress payment of 65 yuan.

In order to maintain the normal operation of the project, we have paid a large sum of money in advance. We are under great financial pressure because you failed to pay the progress payment in time. In order to avoid the shutdown of the project due to lack of funds and the incalculable losses caused by the delay of the construction period, please pay the progress payment as soon as possible so that we can fully invest in the construction.

I am here to convey

Salute!

Shanxi taishui municipal XX co., ltd.

May 8, 20×× years

Project Payment Application Report 10 South-Central University for Nationalities:

The teaching and experimental building project of South-Central University for Nationalities 16# undertaken by our company was put into construction in July, 20xx, and the procurement of decoration and installation materials was completed on March 3 1 day, 20xx. According to the provisions of the contract, we have the conditions to pay the project payment, and now we apply to pay the project progress payment for this month, with a total amount of RMB (in words) six million nine hundred thousand yuan only, for your approval.

I hereby report it, please reply!

I am here to convey

Salute!

Applicant: xxx

20xx year x month x day

Project payment application report11; Leader of Xinfa Huayu Alumina Co., Ltd.:

Hello, I signed a contract with Huayuan Steel Structure Co., Ltd. to undertake the 2,000,000-ton expansion project of the steel structure wall and roof of the low-pressure air compressor station of Xinfa Huayuan Alumina Co., Ltd., and our company has reached the funding standard according to the contract payment method. It has been installed. Have the acceptance conditions. The total cost of the project is 290,000 yuan, 80% of which has been paid. We hereby apply for this project 10%. 29,000 yuan

Change the increase amount; 65,438+489,900 yuan

This application; 43,899 yuan only

Hope the leadership will give recognition! I hope! thank you

I am here to convey

Salute!

Applicant: xxx

20xx year x month x day

Project payment application report 12xxxxx co., ltd:

The sewage pipe project of the technical transformation comprehensive project of Yuxin polymetallic deposit, which was undertaken by our company, started in June of 20xx. In May, the total project price was 35,565,438+065,438+0765,438+06 yuan. According to the construction contract, your company should pay the project progress payment of 26,382,836 yuan (including advance payment), but actually paid the project progress payment of 65 yuan.

In order to maintain the normal operation of the project, we have paid a large sum of money in advance. We are under great financial pressure because you failed to pay the progress payment in time. In order to avoid the shutdown of the project due to lack of funds and the incalculable losses caused by the delay of the construction period, please pay the progress payment as soon as possible so that we can fully invest in the construction.

I am here to convey

Salute!

Xxxxx liability company

Xx,xx,XX,XX

Project Payment Application Report 13 Huida Real Estate Development Company:

The project of 3-4# building in Xincheng Square has been arranged according to the construction plan of your development company this year, and our unit has exceeded the task. Our company plans to stop the project in winter after the completion of the construction of 22 main structures on the ground on 20xx165438+1October 3. After the shutdown, we need to settle a lot of labor and material costs for this project. Our unit has paid a large amount of project funds in advance during the construction process. At present, our company is very short of funds and has been unable to pay the arrears of labor and materials. Here, my unit applies for the construction unit to allocate 5 million yuan before the project is stopped to solve the urgent need.

Please ask the construction unit to consider the current practical difficulties of our unit and give an early reply.

I am here to convey

Salute!

Applicant: xxx

20xx year x month x day

Project Payment Application Report 14 XX Construction Bureau:

The XXXX project undertaken by our company started in XXXXXXXXX, ended in XXXXXXXXX and was completed in XXXXXXXXX. The final settlement (or audit final accounts) will be completed in XXXXXXX, and the settlement price (or audit final accounts) is XXXXX million yuan. As of the payment date, our company * * * has received the project payment of RMB xxxx million, and the balance of this application settlement (or the balance of audit final accounts) is RMB xxxx million.

Attachment: Statement (or Audit Report)

Construction unit: (official seal)

XXXXXxxxxxxxxxxxxxxxxx month xxxx day

Project Payment Application Report 15xxxxx Industrial Holdings Limited:

Our company was fortunate to win the bid for the second time for the quality center of the construction project of XX South Production Base.

Decoration project, contract number, contract period is XX days. During the construction process, the construction period is tight, and your company has many projects. The quality center is the first red flag in the construction of the southern base. During the construction process, our company actively cooperated with the Planning Department and the Southern Base Infrastructure Office, and added many related work items. At that time, the construction period was tight and all units were very busy. We didn't prepare the project budget in time for each additional work. Under the arrangement of the supervisor and your company, we paid in advance and completed it in time at the specified node. There are XX copies of design, visa and technical verification sheets, which are large in quantity and amount, and excellent in material variety (signed by the supervisor and your company). Therefore, at the end of our completion acceptance meeting on XX, XX, XX, we also reached the unanimous recognition of our work by your company and the supervision department (fast progress, excellent quality and all work completed on time). At present, our company has completed all the work (as-built drawings and materials have been signed and recognized), and at the same time, all the work added by your company has been settled, with a total amount of nearly XX million yuan, with each specific increase. At present, our company still owes wages and materials to migrant workers.

XXXXX liability company

Date, year and month

;