Current location - Plastic Surgery and Aesthetics Network - Wedding planning company - Design skills of wedding bridal chamber decoration
Design skills of wedding bridal chamber decoration
Two newlyweds who are about to get married want to buy a new house to get married, but they don't know how to decorate it after they get it. I don't understand many places. After all, it is the first time to contact the decoration, and it is the wedding bridal chamber decoration, so we must pay more attention. According to the idea of two people, we can look at the layout of the wedding new house, and then let's look at the decoration design skills of the wedding new house.

Design skills of wedding bridal chamber decoration

First of all, after the house arrives, the length, width and height of each room are given first, and then the decoration design is made. Be sure to design reasonably, considering the function and beauty of each room. In fact, you can also find professional staff to help you check the design. At the beginning of formal construction, some major components should be removed. It is best to remove all the infilled walls, doors and windows and some water and electricity pipelines that need to be removed according to the design drawings, and then proceed to the next step.

Second, the first step, hydropower transformation, is very important. If this step is not done well, it will lead to rework in the later stage. When doing hydropower transformation, carpenters can go to the site, followed by risers and decorative ceilings. Measuring plaster line, etc. And then start production. These can be prepared in advance, which can shorten the construction period.

The third step, the second step, began to collage, laying some paved wall tiles and floor tiles. However, it should be noted that the kitchen, bathroom and balcony need to be installed first, and then the floor tiles need to be removed. After the kitchen is completed, you need to install a range hood. Then, thoroughly treat the wall surface without wall tiles, do a good job at the grass-roots level first, and then brush the paint.

Fourth, the third step, you need some places to install ceilings, kitchens, bathrooms and other places. In addition to exhaust fans, you should also install Yuba and ceiling lamps at this time, and then install them in every room. After these installations are completed, the wooden floor is laid, and then the wallpaper is pasted.

Fifth, fourth, after all the above work is completed, install various household appliances. If you need to install a radiator at home, start it after the wallpaper is finished. After installing the radiator, install it again. With regard to hardware and sanitary ware, the newly-married house should be cleaned after renovation, and then curtains and other items can be installed.

Tubatu Online provides you with "every decoration quotation, 1-4 local decoration companies, 3 sets of decoration design schemes" and the decoration pit avoidance strategy for free! Click this link:/Zhu Ye /zxbj-cszy.php? to8to _ from = SEO _ zhidao _ m _ jiare & amp; Wb, you can get it for free ~