Introduction of Chongqing North East Bridge?
Chongqing North East Bridge started construction in February 2004, with a total investment of about 200 million yuan. It starts from Beixia Road and ends in Dongyang Town, with a total length of 1.600 m, a bridge width of 19.5 m, four lanes in both directions, and designed daily traffic of tens of thousands of vehicles. The main bridge is nearly 500 meters long, the main span is 230 meters, and the length of two approach bridges is 1200 meters.

After the completion of the North East Bridge, it will be connected with Ring Expressway, Yu He Expressway, National Highway 2 12 and Provincial Highway 204 under construction. Among them, Dongyang Town in this area has benefited the most. It is reported that Dongyang Town is a major glass production town in the city and a major vegetable base in Beibei District. Chaoyang Bridge appears? Critically ill? After the purchase restriction, the life and work of residents in Dongyang Town are extremely inconvenient. It is understood that Dongyang Town is 3 kilometers from Chaoyang Bridge and 2 kilometers from Beibei City after getting off the bridge. After the completion of the North East Bridge, the travel of 650,000 residents on both sides of the strait will be shortened by 5 kilometers, saving at least half an hour.

The main span was closed at the end of May 2007.

Start date: June 5-38, 2004

Opening time: 65438+February 2007

More about? Chongqing North East Bridge? For example, the national bridge construction scale and the qualification of bridge construction enterprises, you can log in to the building network construction and design link for inquiry.

For more information about bid writing and improving the winning rate, click on the bottom customer service for free consultation.