Urgent completion and rational use of time are just like boiling water when mixing flour. When the flour is ready, the water will boil without delay.
1, the new house can be tested after the decoration company moves in. If floor heating is needed, the measurement after floor heating backfilling should be more accurate; (Note: Your ground leveling data and floor thickness are required for measurement) 2. The old house can be demolished and then measured. Similarly, if floor heating is needed, it is more accurate to measure it after backfilling.
Don't worry, those who have enough time.
1. After the ground of the new house is leveled, the construction period will be delayed by about one week.
2. It is the most standard to measure after paving the floor and sticking wall tiles and floor tiles, but the construction period is too long.
The new house was simply renovated for two months, and the old house was more than two months.
Most people can't accept it.