After seven phases of construction, Shaoguan Power Plant has built 10 units, of which two 300MW units have been put into operation during the Tenth Five-Year Plan period. With the retirement of old units and the commissioning of new units, there are currently four units in operation, with a capacity of *** 1000MW and an annual power generation of over 6 billion kwh. At present, the power plant is advancing the overall planning of 4×600MW units.
2- Mawan Power Plant (6*300MW)
It undertakes the production, operation and management of 6× 300,000 kW coal-fired units of Shenzhen Mawan Electric Power Co., Ltd. and Shenzhen West Electric Power Co., Ltd., and is the main power plant directly under Shenzhen Energy Group. 65438+1The first one was put into production in August 1993, and the sixth one was put into production in July 2003.
In 2004, the online electricity consumption was121180,000 kwh, and the average utilization hours were 7032 hours. Among them, the utilization hour of 6 # unit reached 7720 hours, and in 2004, it ran safely for 300 days continuously, reaching the leading level in the province.
3- Shantou Power Plant (2 sets of 300,000 kilowatts, 1 600,000 kilowatts, or 2 * 300 MW+ 1 * 600 MW)
Huaneng Shantou Power Plant is a backbone enterprise under Huaneng International Power Co., Ltd. and an important power support point of Guangdong Power Grid in eastern Guangdong. The power plant is located in Aotou, Dahao District, Shantou City, south of Shantou Bay Bridge, with an area of 1.045 mu and an installed capacity of1.2000 kW. Two 300,000 kW Russian turbogenerators built in the first phase of the project were put into operation at the end of 1996, and one was expanded in the second phase.