In September, under the correct leadership of the Party and government in the work area, I conscientiously implemented the Party's safety production policy, national safety production laws and regulations, and the instructions and instructions of my superiors on safety production, strictly observed the rules and regulations of the mine, and successfully completed various safety production tasks. Summarizing the experience and lessons from my work in the past month will help me to make full use of my strengths and avoid weaknesses in my future work and do a better job in technical work. Let's summarize my work in January from several aspects:
Main work in September:
As a technician in the work area, I completed the technical management work on time according to the rules and regulations and texture of the work area.
1. Technical management:
(1) According to the requirements of quality standardization of ground workshop in mine construction, the relevant technical data are sorted out, and the design of one-piece processing drawing is concerned.
(2) There are 19 wells, and the working face has been inspected for 8 times, and 16 hidden dangers in the wells have been found, and 1 1 hidden dangers have been solved on site.
(3) Draw 14 piece-by-piece processing drawing.
(4) Teaching 18 classes in the tutor center did not affect the normal production work.
2. Information management:
(1) revised the management system of the work area.
(2) Improve the related contents of the quality/environment/occupational health and safety/measurement management system in the transportation work area.
(3) Summarize the investigation of potential safety hazards in the work area every week and report to the Safety Supervision Office in written form.
Second, the specific work:
(1) according to the requirements of the relevant functional departments of the mine, cooperate with the leaders of the work area to actively investigate the unsafe personnel and unsafe behaviors in the whole area, and report to the safety supervision office in writing in time, so as to avoid the existence of various potential safety hazards and ensure on-site safety production.
(2) The maintenance scope of electrical equipment in the work area was revised in time: according to the needs of field production, the electrical equipment was segmented, ensuring a good atmosphere in which all electrical equipment in the electromechanical team was managed and everyone was responsible.
(3) Go deep into the site, carefully investigate potential safety hazards (15 all potential hazards are solved), and arrange production in an orderly manner.
Third, the remaining problems in the work.
(1) The learning system is not systematic enough. Although we attach great importance to learning, due to more work clues, the depth of learning is not enough.
(2) The professional knowledge of the business is not profound enough, and it is necessary to learn to further strengthen the professional knowledge.
4. 10 work plan
By summing up my work in January, I found the shortcomings in my work so as to overcome them in my future work. At the same time, you need to read more books, study rules and regulations and related documents, master professional knowledge, improve your work ability, strengthen your sense of responsibility, and do your personal work in time.
In short, in the future work, I will constantly sum up and reflect, constantly spur myself, enrich my energy, improve my quality and professional level, so as to adapt to the development of the times and enterprises, and make progress and growth together with the work area.
In September, I served as the municipal manager, engaged in the maintenance and management of municipal landscaping. The professional and technical work in the past month is summarized as follows:
First, seriously study professional technology and improve professional skills.
I study hard, and in order to meet the needs of municipal engineering business of our company, I have specially formulated the first-class and second-class standards for landscaping maintenance that adapt to the actual situation of our company. Because the municipal greening of the park is mainly lawn, the maintenance standards of each area are reasonably divided according to the actual situation. The green period of the main sections of the study abroad network and the tour route reached 360 days, with no more than 5 weeds per square meter, and the height of the lawn remained at 8- 10cm all the year round, and the seedlings grew vigorously without death. There is no garbage and a lot of fallen leaves in the green space.
In view of the uneven level of greening maintenance personnel and uncoordinated work, the operating norms and processes of landscaping maintenance are formulated, and clear provisions are made in weeding, irrigation, fertilization, pruning, pest control and other aspects, so that even novices can quickly adapt to their work, and corresponding emergency plans are formulated for all kinds of visiting receptions and large-scale activities that occur at any time. So that green maintenance workers can finish their tasks in an orderly way when they encounter urgent tasks.
Because there are different kinds of weeds in different areas, there are mainly Alternanthera philoxeroides, crabgrass, Bermuda grass, imperata rhizome, white clover, coriander, Cyperus tuber, Cynanchum atratum, centipede, oxalis and so on. According to the local actual situation, through continuous mixing experiments with workers, the herbicide formula suitable for the local actual situation was found. The main herbicides before weed emergence are 10% sulfuron-methyl, 72% metolachlor, 48% trifluralin and 60% butachlor. The dosage is 45mL per1100mz lawn.
Second, seriously study political theory and improve political literacy.
As a native of party member and China, politically, I am strict with myself, actively participate in various political activities, consciously study political theory, and pay special attention to it? Theory of Three Represents theory? 、? Scientific Outlook on Development? Learn important thoughts, strive to improve their political and theoretical cultivation, and realize? The Chinese dream of the great rejuvenation of the Chinese nation? As their lofty ideals and lifelong pursuit.
Third, correct working attitude and improve working skills.
I put my career first in my work, regardless of personal gains and losses. Through years of hard work, my professional skills and ability to control my work have been greatly improved and recognized by my colleagues. Excellent employees of group companies? .
In the future work, I will definitely study harder, apply what I have learned, constantly improve my working methods, improve my working efficiency, be down-to-earth, work hard and work diligently.
I took part in the work in September. I have been engaged in electricity meter calibration and electricity inspection, and now I am the deputy director of the business department, responsible for line loss management, measurement management and electricity inspection. In a month's practical work, I studied with an open mind, worked hard, and combined book knowledge with practical work, and my professional and technical level was significantly improved. The personal work is now reported as follows:
First, strengthen the management of standard equipment to ensure the accuracy of value transmission.
We often say that electric meters are used in the business activities of electric power enterprises? A scale? Is the standard measuring equipment calibrated? A scale? This tool is of great significance to electric power enterprises. Our bureau has 19 sets of standard equipment. In order to ensure the stable and healthy operation of these equipment, I presided over the establishment of a standardized accounting of measuring equipment, clearly defined the management of special personnel, and sent them for inspection regularly to avoid overdue service. For the portable single-phase meter calibration table with unstable performance, we maintain it once a month by the manufacturer, and compare it with other standards irregularly, so as to solve the problem in time and avoid serious consequences. A total of 2 sets of standard equipment/kloc-0 were submitted for inspection in XX years. Due to the work in place and effective measures, the qualified rate of inspection reached 100, which was well received by the leaders of the electric power research institute.
Second, do a good job in meter management and safeguard the legitimate rights and interests of both parties.
Through business investigation, we have established an electric meter account and brought the electric meter into standardized management. We have determined the work flow of electricity meter verification, and the account is dynamically managed by a special person to ensure that the account is consistent with the fact. Before instrument calibration, check the accounts and register the work records. During the calibration process, the microcomputer will automatically record the error data, and after the calibration, a special person will change the meter account. If it is necessary to replace the meter, the replacement record of the metering device shall be issued, and the charging report of the metering device shall be issued according to the actual situation. The consequences of this effectively curb the bad behavior of individuals who make a fuss about electricity meters and seek personal gain. In order to ensure the quality of meter calibration, we implement the lifelong responsibility system for meter calibration. As long as it is determined that the unqualified error is artificially adjusted, no matter how long it takes, the verifier should be held accountable and will not be tolerated. In XX month, 474 meters1set and 48 current transformers1set were inspected, exceeding the planned task by 56.7 sets, which provided technical support for global loss reduction and energy saving.
Third, pay close attention to bus balance management and eliminate the blind spot of line loss management.
Generally speaking, line loss consists of high-voltage line loss and low-voltage line loss, both of which have strict assessment systems and are widely valued; Bus balance between high and low voltage line losses is easily overlooked. In fact, the bus balance can not be ignored. For example, our bureau completed the power supply of 299.7 million kWh in the whole month of XX. If the global bus balance rate rises from 0.5 to 1, the overall monthly power loss will be14xxxxxkwh. The balance rate of bus mainly depends on the accuracy of metering device. In order to ensure the accuracy of the measuring devices in the station, we replaced all the measuring instruments in the station with multifunctional electronic instruments in XX and X months, and checked them on site once every quarter according to the measurement regulations to ensure the stable operation of the instruments. Through this work, the bus balance rate has been greatly reduced, and the balance rate of Mibei and Bandong Station has been reduced from more than 1.5 to less than 0.5, and the effect is particularly obvious.
In order to know the balance situation in the station timely and accurately, we assign special personnel to pay attention to the balance situation of each station every day and check it once a week. As long as the balance rate of a station exceeds 0.5 for two consecutive days, we will immediately rush to the scene to find out the reason. For metering faults reported by each station, we guarantee that personnel will be in place within 12 hours to solve the problem as quickly as possible. XX month * * * Replace the meter Liu Xue 8646 block, conduct on-site inspection 146 block times, and deal with the metering fault xxxx in the station to ensure that the overall monthly bus balance rate is within 0.5. In order to complete the power supply index, ensure economic benefits and replace the electronic watch, we set out early in the morning, try to work during the low power consumption period, and start our office first? Zero point project? First of all.
Fourth, pay attention to on-site management and fully cooperate with the loss reduction work.
On-site management includes positioning, acceptance and various forms of on-site investigation. Every positioning or acceptance, I ask team members to be serious and responsible, not limited to taking notes, to really participate, and to strictly control. During the acceptance of the capacity expansion project of Bao Si Leather Plastic Co., Ltd. 1000kva, we carefully checked the wiring, found the measurement wiring error of the manufacturer, and prevented a serious measurement accident.
For other field work, whether it is a general survey of electricity consumption, a key survey of some lines and substations, or a survey of the load of public distribution transformers, I insist on seeking truth from facts, and strive to investigate the real first-hand information clearly, so as to provide a reliable basis for leadership decision-making. In addition, I also regard field research as a rare opportunity for me to go deep into the grassroots and get in touch with the front line. Through on-the-spot investigation, we can solve practical problems for comrades in power supply stations, enrich our own experience and supplement our own knowledge. In XX month, we * * * investigated 30 lines, and in station area xxxx, the wrong connection of 1 1 was corrected.
5. Optimize reactive power configuration to provide technical support for loss reduction.
Reactive power management is an important link in line loss management. For reactive power management, I am not satisfied with reporting several forms and filling in a few figures in the power supply station, but devoted myself to this work. On the one hand, I have visited Beisha, Dongyang, Dabucun and other places for many times, starting with correcting the wiring of reactive power meters, helping power supply personnel to measure the reactive power of users, determine the reactive power compensation scheme for users, and check the reactive power compensation effect; On the other hand, access to relevant information, understand the latest trends of reactive power compensation, constantly fill the brain, and seek practical working methods of reactive power compensation in our bureau. Through unremitting efforts, comrades in power supply stations and many power users have continuously improved their understanding of this work. Last month, * * * increased reactive power compensation by nearly 65,438+00,000 kvar.
Other work of intransitive verbs has been completed.
Over the past month or so, in addition to the above work, I also cooperated with other departments to complete the agricultural electrician examination and the inspection of pump station equipment in flood season, so I won't go into details.
The above is my work in the past month. Although some achievements have been made, the shortcomings are also obvious. In the future, I will try my best to correct my own shortcomings, study professional and technical knowledge seriously, improve my personal quality, and lay a good foundation for the smooth completion of various tasks.