1. Nihei Town Photovoltaic Power Station in Longyang District: This power station is located in Nihei Town, with a total installed capacity of 100MW and a planned total area of about 400 mu, of which the first phase has been connected to the grid for power generation.
2. Photovoltaic Power Station of Baoshan Second People's Hospital in Longyang District: This power station is located in Baoshan Second People's Hospital, with a total installed capacity of1.5mW. It was completed and put into use in 2065, with 438+09.
3. Photovoltaic Power Station of Baoshan Power Supply Bureau in Longyang District: This power station is located in Baoshan Power Supply Bureau, with a total installed capacity of 2.2MW. It was completed and put into use in 20 18 years.