Current location - Plastic Surgery and Aesthetics Network - Plastic surgery and beauty - Civilized construction target management measures?
Civilized construction target management measures?
Civilized construction target management measures?

The layout of the construction site should meet the requirements of construction and production, and fully consider the requirements of civilized construction. It is not allowed to build at will, and the site production layout is carried out in strict accordance with the approved construction general layout. Through unified management, the goal of "six modernizations" is basically realized.

1) standardization measures for site fences:

(1) All construction sites must be closed: except for the entrances and exits of people and vehicles, fences with coping with a thickness of 18cm and a height of more than 2.2m must be erected on the periphery of the fences, and brick columns with walls must be set up on the fences (the spacing between the columns is not more than 3m). The fence must be firm, safe and tidy, and the outer wall must be painted in waves to achieve beautiful results. The construction site and the living area must be separated by a fence (the distance between the living area and the construction site must be >; 30 meters).

(2) The total width of the gate on the construction site shall be not less than 5m, and the post shall be beautiful and generous, and slogans shall be added to the sector of the outer door.

(3) Set the following signs and columns outside the gate of the construction site:

Architectural signs:

The name of each unit is marked on the wall on the right outside the gate:

(4) Set the following "five cards and two paintings" at the gate of the construction site;

Project overview card, safety production counting card, and safety production prohibition card (including: ten measures for safety technology, ten prohibitions for on-site construction, ten disciplines for safety production, ten prohibitions for safety production, and fire prevention instructions for construction site); Company quality policy billboard, company action oral billboard; Construction site layout, construction site health responsibility area plan.

2) Construction site

The construction site must be arranged and managed according to the construction scheme in the construction organization design (or scheme) to avoid dirty, chaotic and poor phenomena.

(1) At the entrance and exit of the car on the construction site, a car wash and sedimentation tank are set up, and faucets are equipped for flushing.

(2) The main access to the construction site must be clear. Hard base must be implemented in the construction site, and concrete should be poured on the ground of the material yard, processing yard and warehouse in the internal and external passages of the construction site gate.

(3) After carrying out load design and line installation according to the temporary electricity utilization construction scheme. The erection height of the temporary line is 3m, and the examination and approval formalities shall be handled.

(3) Building materials must be classified and stacked in a fixed position within the specified range according to the construction layout.

(4) The construction site must be well leveled, well drained and keep the drainage system unblocked. Mud and sewage must be treated by sedimentation tank before entering the sewer.

(5) The construction waste on the construction site should be piled up in a centralized way and cleaned up in time.

(6) Set safety signs, signs and warning signs on the construction site in time.

Safety slogans and signs such as "Safety helmet must be worn when entering the construction site", "Slippers and high heels are forbidden to enter the construction site" and "Be careful of falling objects" are hung at the entrance of the construction site. Fences, cover plates and safety signs shall be set up in pits, wells, deep trenches, reserved holes on each floor, around transformers and near high-voltage lines. Stairs, elevator wellheads, steel derricks on floors, entrances and exits of passages shall be provided with protective railings and safety protection sheds. Red lights should be set up in pits and deep ditches at night to warn people.

3) Temporary facilities

(1) For the construction projects located on both sides of the road, starting from the second floor, it is necessary to use 100 cm ㎡ new flame-retardant dense mesh safety net with a mesh of not less than 2000 meshes for totally enclosed construction.

(2) The office, dormitory, kitchen, toilet, temporary water and electricity facilities and warehouse on the construction site must be arranged in strict accordance with the construction layout in the construction organization design (or scheme).

(3) The production and living facilities on the construction site must be listed and kept clean.

(4) The on-site office and meeting room shall be arranged reasonably and neatly, and the wall drawings and forms shall be placed in an orderly manner, and each drawing and form shall be put on the wall;

(5) The dormitory on the construction site should be ventilated and light-permeable, reasonably separated, and there should be signs on the door to distinguish teams and groups.

(6) The staff canteen should be set up on the construction site according to the regulations and requirements of the health and epidemic prevention department, and it is forbidden to set up a kitchen by the team.

(7) The toilet on the construction site should be ventilated and clean. Automatic flushing equipment should be set in the toilet, and special personnel should be appointed to clean it.

4) Field capacity and appearance management

(1) The contents of propaganda slogans, blackboard newspapers and newspaper reading columns on the construction site should be changed regularly.

(2) We must strictly implement various health systems formulated by governments at all levels and competent departments, and implement on-site health responsibility areas.

(3) Workers' operation site should be "clear after work and clean after work".

(4) The discharge of "three wastes" in construction must be properly handled according to relevant regulations to prevent dust, mud leakage, sewage outflow and noise from disturbing people.

(5) The machinery and equipment used in the construction site are uniform oil yellow. Construction elevators, tower cranes, high-speed cages and steel derricks are all dark red oil. The equipment in the construction switch box shall conform to the regulations, and the oil in the box shell shall be dark green, and marked with "Electrical Danger" for warning.

(6) According to the general layout of the construction site, materials should be stacked in different areas and categories.

(7) It is forbidden to pile materials and sundries on grids, platforms and footbridges. Debris on the safety net and inclined baffle should be cleaned frequently. Protective facilities must be closed tightly to prevent falling objects from hurting people.

(8) Implement the regulations on the color of safety helmet and wearing work card on the construction site.

(9) Various protective facilities, warning signs and safety signs on the construction site are not allowed to be dismantled and moved at will.

5) Site canteen

(1) Strictly abide by the food hygiene law, and do not sell rotten, spoiled and smelly food.

(2) The health system must be sound, the responsibility should go to people, and the division of labor should be clear;

(3) keep the canteen clean and tidy; The kitchen must ensure "six noes", that is, no ants, flies, rats, cockroaches, odors and insects;

(4) Cooking utensils and tableware should be disinfected regularly, pay attention to food hygiene and prevent food poisoning accidents;

(5) Cooking personnel should pay attention to personal hygiene and go to the epidemic prevention department for physical examination regularly. They must wear white clothes, white hats and white masks when they go to work.

6) Construction site dormitory

(1) It is necessary to strengthen the management of the dormitory area on the construction site and establish and improve the dormitory management system.

(2) Actively organize activities to create civilized dormitories, establish a new fashion of harmonious coexistence, mutual respect and mutual accommodation, resist the erosion of various decadent ideas, and ensure that dormitory areas are not polluted by spirit.

(3) Do a good job in dormitory fire prevention, control fire sources and kindling, and prevent fire accidents.

For more information about project/service/procurement bidding, and to improve the winning rate, please click on the bottom of official website Customer Service for free consultation:/#/? source=bdzd