Greening maintenance contract
With the continuous improvement of laws and regulations, people pay more and more attention to contracts, and more and more scenes and occasions need to use contracts. The signing of the contract is the best explanation of the rights and obligations of both parties. Do you know what the main contents of the contract are? The following is my collection of greening maintenance contracts for reference only. Welcome to reading.

The greening maintenance contractNo. 1 (hereinafter referred to as Party A) agrees to entrust its greening land to (hereinafter referred to as Party B) for maintenance and management, so as to better raise the landscaping level to a new level. Party B will be fully responsible for the irrigation, pruning and fertilization of trees, flowers, shrubs, hedges, colored blocks and lawns in the green space, as well as the prevention and restoration of diseases, pests and weeds, so as to reach the agreed maintenance standards, and Party A will pay the agreed remuneration to Party B. In order to protect the legitimate rights and interests of both parties, the following contract is signed on the basis of equality and mutual benefit, and it is hoped that * * * will abide by it together.

I. Scope of work:

Party B is responsible for the irrigation, pruning, fertilization, pest control and weed remediation of trees, flowers, shrubs, hedges and lawns in Party A's green space, covering an area of square meters. The name, quantity and growth of seedlings are shown in the annex.

Second, the maintenance standard:

1) Tree Maintenance Management Standard

1) normal growth potential, normal branches and leaves, no litter;

2) Give full consideration to the relationship between trees and environment, and prune them according to their age and growth potential;

3) Cut off dead branches and diseased branches in time;

4) timely irrigation and fertilization to rejuvenate the old trees;

5) Replanting in time to ensure that the seedlings and specifications are close to the original plants;

6) Pest control, prevention first, careful management, early detection and early treatment.

2) Maintenance and management standards for flowering shrubs

1) The growth potential is normal without litter;

2) Beautiful appearance, in harmony with the environment; Flowers and shrubs can bloom in time, and residual flowers and leaves can be pruned in time;

3) reasonable irrigation and fertilization according to the growth and flowering characteristics;

4) control weeds in time;

5) Replanting in time, trying to be close to the original varieties and specifications;

6) Pest control, prevention first, careful management, early detection and early treatment.

3) Maintenance and management standards for hedges and color blocks

1) Trimming shall be clear in outline and neat in lines, and plastic trimming shall be carried out at least twice a year;

2) After pruning, remove the residual branches and leaves in time;

3) Irrigation and fertilization in time to control pests and weeds.

4) Lawn maintenance management standard

1) Carry out lawn maintenance management according to site conditions and functions;

2) Turfgrass grows vigorously, is full of vitality, is neat and beautiful, the coverage rate is ≥ 90%, the weed rate is ≤ 5%, the green period is more than 240 days, there is no obvious potholes and water accumulation, and bare land should be replanted in time;

3) According to the characteristics, ornamental effect and use direction of different grass species, regular pruning is carried out to make the lawn grass have the same height and neat edges;

4) The stubble height and mowing times of lawn depend on grass species, season, environment and other factors, and should follow the principle of "1/3";

5) Lawn irrigation should be timely and appropriate, and green water and overwintering water must be well irrigated;

6) The period and dosage of lawn fertilization should be determined according to the growth status of lawn grass, fertilization must be uniform, and granular topdressing should be watered in time;

7) timely control pests and weed removal;

Three. Rights and obligations of Party A

1) Provide a nearby warehouse, a lounge and facilities such as water supply and power supply free of charge;

2) Pay maintenance and management remuneration to Party B in time;

3) Supervision, inspection and acceptance of green space maintenance management quality;

4) Assist Party B to maintain the construction order and provide convenience as much as possible.

Four. Rights and obligations of Party B

1) Strictly follow the maintenance management quality standards confirmed by both parties to ensure the quality;

2) During the maintenance period, the quality problems caused by materials and technical reasons belonging to Party B shall be repaired free of charge as soon as possible;

3) Educate employees to pay attention to safety and prevent safety accidents;

4) Civilized construction, timely cleaning up the construction site, and clearing up after work;

5) Timely and accurate acquisition of accounts receivable.

Verb (abbreviation of verb) the amount of reward and the way of payment

1) When signing the contract, both parties confirm the types, quantities and growth conditions of existing seedlings and lawns in the green space, and charge mainly for the lawn area m2, with the charge of RMB /m2 (i.e. RMB per square meter), totaling RMB;

2) Within 5 working days after the signing of the contract, Party A shall pay Party B 25% of the total contract amount, namely RMB Yuan only, to support Party B to make good preparations;

3) Party B enters the maintenance management post within 3 working days after receiving the first payment from Party A;

4) In the last week of each quarter, Party A shall pay Party B the maintenance and management fee for the next quarter, the amount of which is 30% and 35% of the total contract amount respectively;

5) Within one week after the expiration of one-year maintenance management, if Party A recognizes that Party B's maintenance quality reaches the agreed standard, Party A shall pay the balance in one lump sum;

6) Party B shall issue a formal invoice to Party A in time.

During the contract period of intransitive verbs, if Party A has other greening renovation or construction projects, the expenses shall be calculated separately.

Seven. responsibility for breach of contract

1) If Party A fails to perform its obligations as agreed in the contract or causes major rework or slowdown due to other reasons of Party A, it shall compensate Party B for the corresponding expenses already paid; If Party A defaults on the project payment, resulting in work stoppage or slowdown, Party A shall compensate Party B for daily losses at 0. 1% of the total contract price;

2) If the maintenance quality of Party B does not meet the agreed standards, Party B shall rework it by itself and bear the expenses arising therefrom.

8. In case of any dispute during the execution of this contract, both parties shall settle it through negotiation in time; If no agreement can be reached, they can apply for arbitration or resort to law.

Nine. This contract shall come into effect after being sealed by both parties and signed by their representatives; The on-site visa form signed and confirmed by the representatives of both parties is an additional clause of this contract and has the same legal effect.

X this contract is made in duplicate, one for each party.

Party A (seal) and Party B (seal)

Legal representative:

Site representative: Site representative:

Greening Maintenance Contract II Employer: ×× unit (hereinafter referred to as Party A) Contractor: ×× Greening Company (hereinafter referred to as Party B)

Party A entrusts Party B to undertake the construction of part of the environmental landscape greening project of Unit XX. Party A and Party B sign this construction contract on the principle of mutual cooperation and close cooperation.

1. Project Overview: The contract price within the contracting scope of this greening project is tentatively set at RMB 70,000 Yuan only, which will be settled according to the facts after completion. The contracting method is contracting for labor and materials.

Two. Construction period: The commencement date of this project is April 8, 20xx, and the expected completion date is April 30, 20xx. In case of weather, Party A and Party B can postpone the time after consultation.

3. Project quality: Party B shall carry out the construction in strict accordance with the relevant national landscaping technology and engineering standards, plant seedlings according to the engineering quality requirements put forward by Party A, and shall not change the specifications and seedling varieties without authorization. If there are quality problems, Party A will not be responsible for the rework costs.

Four. Safety issues: Party B shall carefully organize and pay attention to safety during the construction process to ensure that the construction site is clean and tidy, and all old and weak migrant workers shall be dismissed. In case of safety accidents, Party B shall be responsible.

Verb (abbreviation of verb) Responsibility of Party A: Party A shall supervise and inspect the quality, progress and construction process of Party B's project, and coordinate the relationship between Party B and all parties during the construction process. After the completion of the project, organize the project acceptance and complete the settlement according to the contract.

Responsibility of intransitive verb Party B: Party B shall go through all relevant construction procedures and obey the supervision and management of the competent department; Party B must carry out the construction according to the approved design drawings provided by Party A. If there is any change in design and variety, it shall be implemented after receiving the written notice of change from Party A.. Before the completion of the project is submitted to Party A for acceptance, Party B shall protect the completed project. During the construction, Party B shall pay attention to protecting the existing buildings, underground and above-ground municipal facilities and cable trenches. If any losses and serious consequences are caused during the construction, Party B shall be responsible for compensation.

Seven. Seedling requirements: the seedlings purchased by Party B must be fresh, with straight branches, good tree shape, robust plants, lush foliage and no symptoms.

Eight. Maintenance period: After all seedlings are planted, Party B shall be responsible for survival, watering, weeding, pruning and replacement of dead seedlings within 12 months.

Nine. Payment of project funds: After Party B completes half of the total project amount, Party A shall be responsible for paying Party B 30% of the total project amount, and after Party B completes the project, Party A shall pay Party B 20% of the total project amount, and the balance shall be paid on May 1 day of 20xx.

X. Settlement method: the price per square meter of green color block area is 70 yuan, backfill earthwork is 50 yuan, kerb is 40 yuan, and brick is 50 yuan. All quantities are calculated on the basis of facts. Other expenses, if any, shall be settled by both parties through consultation.

XI。 Breach of contract: Any party who fails to perform the terms of the contract is in breach of contract, and the economic losses caused by the breach of contract shall be borne by the breaching party.

12. Matters not covered in this contract shall be settled by both parties through negotiation. This contract is made in duplicate, one for each party, with the same legal effect. It can take effect only after the legal representatives of both parties sign and seal, and it will automatically become invalid after the maintenance period expires.

Party A: Party B: (Seal) (Seal)

Legal representative: (or client)

Legal representative: (or client) Year Month Day (signing date)

Greening Maintenance Contract III Party A (hereinafter referred to as Party A) and Party B (hereinafter referred to as Party B) have reached the following agreement through consultation in accordance with the Contract Law of People's Republic of China (PRC) and following the principles of equality, voluntariness, mutual benefit, fairness and honest cooperation:

1. Party A entrusts Party B to be responsible for the maintenance and management of all flowers and trees inside and outside the new and old office buildings of Party A. ..

2. Duration: the curing period is one year, from the date of the month to the date of the month.

Three. Maintenance fee is RMB, in words:

Four. Payment method: after the contract expires, it will be paid in one lump sum.

5. Party A is responsible for the safety management of all seedlings within the maintenance scope, and Party A shall take full responsibility for any man-made damage. Party A shall provide water, electricity and tools for temporary resettlement (water and electricity shall be borne by Party A). If the plants in the maintenance area die due to poor water supply and power supply, Party A shall be responsible for the losses caused.

6. Before taking over the maintenance, Party B shall count Party A's existing seedlings. If there are dead seedlings that cannot be repaired, they shall be submitted to Party A for filing. If flowers and trees die naturally during the maintenance period, Party B shall promptly notify Party A and negotiate replanting.

Seven. During the maintenance period, Party B shall carry out maintenance and management in strict accordance with the standards of Taiyuan Greening Maintenance Regulations. If Party B fails to maintain according to the regulations, resulting in losses, Party A has the right to require Party B to bear the corresponding liability for compensation.

Eight. If Party A fails to pay the maintenance fee in time as agreed in the contract, Party A shall bear all the liabilities for breach of contract and pay Party B a penalty of 3% of the overdue payment amount every day.

9. During the routine maintenance, Party B shall clean up the site in time according to Party A's requirements after the maintenance is completed. If Party B fails to meet Party A's requirements or clean up the site, it will be fined 500 yuan.

X this contract shall come into effect after being signed by the responsible persons of both parties, and both parties shall abide by it. In case of breach of contract, it shall be settled through negotiation. If it cannot be settled properly, the local legal department will arbitrate.

XI。 If the maintenance scope is increased or decreased for other reasons, both parties shall communicate in time and sign a supplementary contract. The two sides should cooperate closely for mutual benefit to ensure the greening effect of the park.

Twelve. This contract is made in quadruplicate, with each party holding two copies.

Party A (seal) and Party B (seal)

Person in charge: person in charge:

Year, month, sun, moon, sun.

Greening Maintenance Contract 4 Party A:

Party B:

In order to complete the agreed contents of the construction project and clarify the rights and obligations of both parties, this contract is signed by both parties through consultation.

I. Overview of the Project

1. Project name:

2. Project location:

3. Scope and content of project contracting: flower bed and seedling planting.

4. Contracting method: Party B contracts the project and materials.

Two. Project duration: 20xx65438+1October 28th-20xx165438+1October 12.

Third, the project cost:

The project cost is 1 1730.8 (eleven thousand seven hundred and thirty-eight yuan only).

Fourth, the payment of the project price

After the project is completely completed, Party A will pay 95% upon acceptance, leaving 5% as the project quality deposit, and pay off the balance after the maintenance period expires.

Five, seedling maintenance period: six months.

Six, engineering quality and inspection and acceptance

Quality standard: in line with the Code for Construction and Acceptance of Urban Greening and the standards of engineering construction drawings.

Seven. supplementary terms

Matters not covered in this contract shall be implemented in accordance with the Contract Law of People's Republic of China (PRC) and relevant regulations.

This contract is made in duplicate, one for each party, and both parties shall abide by it. It will take effect from the date of signing and will automatically become invalid after the project price is settled.

Party A (signature): Party B (signature): YY.