Current location - Plastic Surgery and Aesthetics Network - Plastic surgery and beauty - Chongqing Longxin Shi Sheng Putian specific information?
Chongqing Longxin Shi Sheng Putian specific information?
Longxin Shi Sheng Putian covers an area of 148 mu, with a total construction area of about 380,000 square meters and an overall plot ratio of 2.5. The project consists of 18 Donde-style ecological villa, 5 gorgeous high-rise buildings, central business, 1 German-style commercial street running through the north and south of the project, and the planned metropolitan business center.

Project advantage

1. regional advantages: the project is located in Erlang science and technology new city, which is the expansion area of Chongqing high-tech zone. According to the planning of Chongqing, it will be built into a main city sub-center and regional center with ecological and technological characteristics. In addition, the project is 2 kilometers away from Chongqing West Railway Station, which is the largest passenger hub system in western China, with huge passenger flow, which can drive the rapid development of the region.

2. Traffic advantage: Fengxi Road Station of the planned Line 5 is close to the rail project; Bus-three buses have been opened (425/827/325); By car: Torch Avenue, Ke Cheng Road and Fengxi Road.

3. Commercial advantages: Yangjiaping business circle and Baguocheng business circle, the project also has nearly 50,000 cubic meters of business, which is enough to meet the living and shopping needs of the owners.

4. Educational advantages: There are many famous schools such as Toyota Primary School, Shangqiao Primary School, mount mount Primary School, Caiyunhu Primary School and Gao Yu Middle School in Shu Ren.

5. Medical advantages: Southwest Hospital (3A hospital) and xinqiao hospital (3A hospital).

6. Product advantages: After the project is completed, it will fill the gap between Fengtian Avenue and Erlang Science and Technology New City, and build a comprehensive community integrating residence, shopping, catering, leisure, entertainment, characteristic theme parks and rail transit.

Project disadvantage

1. The track is not yet open to traffic, so travel mainly depends on public transportation and self-driving.