Current location - Plastic Surgery and Aesthetics Network - Plastic surgery and beauty - Five summaries of technical personnel's personal annual work
Five summaries of technical personnel's personal annual work
To write a good work summary, technicians must be diligent in thinking and good at summarizing. This can improve the management level of leaders. The following are five essays on the personal annual work summary of technicians that I have compiled for you, hoping to help you!

personal work summary of technicians 1

The technical department is one of the main functional supervision departments of the unit. Be a good family and manage your money? It is the duty of the technical department. We have great obligations and responsibilities in strengthening management, standardizing economic behavior and improving the competitiveness of enterprises. Only by continuous reflection and summary can the management work be improved!

 ? Find the deficiency and catch up with the advanced, and strive for the advanced based on the fundamental? As individuals, we should realize our own personal values, and the rise and fall of enterprises and institutions is directly related to the honor and disgrace of individuals. As a technical management department, we should make every effort to achieve the same goal, and we should have the spirit of hard work, reform and innovation, market expansion, lean management, never-satisfied spirit and the spirit of taking care of the overall situation. We should put these six spirits into concrete work. In the future work, as the main person in charge of the technical department, for? How to improve yourself and serve our unit? This compulsory course, I will continue to strengthen my study, improve myself, and put? Learn advanced, catch up with advanced, and strive to be advanced? Into the work. The following are my work plan ideas:

1. Improve the internal management system of the unit; Clear division of responsibilities, strengthen responsibility assessment; After nearly a year's implementation, there are still many unreasonable places in the internal management system. In order to make the management system more perfect, the technical department will make amendments with relevant departments in combination with the requirements of the overall management of the unit.

clearly define the division of responsibilities among department heads, organize the implementation and strengthen it in place according to the responsibility letter signed by the project, trust each other among colleagues, do a good job in assisting each other, strengthen the responsibility assessment for the content in charge, and make rewards and punishments clear;

2. The technical department has always been relatively weak. According to the characteristics of each manager, on the one hand, we will regroup the personnel and organize them in an efficient and orderly manner, on the other hand, we will continue to strengthen training, so that every manager should be familiar with the technology business, truly become adept, and improve their cultural quality and business management level qualitatively.

third, strengthen team building and give full play to the role of technical functional departments: as the person in charge of the technical department, he is not only a technical worker, but also the organizer of the technical management system. He should have a rigorous and honest work style and a serious and meticulous work attitude, actively guide online personnel, help them solve problems, give full play to the team spirit, and learn advanced, catch up with advanced and super advanced.

fourth, do a good job in technical analysis to provide effective reference for leaders; I know that reasonable and efficient technical analysis ideas and methods are an important way to improve the level of enterprise management and decision-making, and will make our work get twice the result with half the effort. We will learn from old technologies and books in enterprise cost analysis, quantitatively analyze specific technical data, and provide powerful technical information support for decision makers and managers in combination with the overall strategy;

the above work is the main work of our technical department in the next phase. Find the deficiency and catch up with the advanced, and strive for the advanced based on the fundamental? This is not empty talk. When the horn sounds, we will put it into action, use team spirit to brainstorm, and all personnel in the technical front will focus on how to innovate in management and how to make a fuss about implementing cost control! In short, in my future work, I will constantly sum up and reflect, constantly push myself and enrich my energy, improve my quality and business level, so as to adapt to the development of the times and enterprises, make progress with you and grow with the company.

personal work summary of technicians 2

In the first half of this year, which is about to pass away, my understanding is: A plow and a harvest? . Hard sweat for solid technology, hard work for a better life.

as a technician, I always keep in mind my work mission, strive to serve the company with professional knowledge, and constantly improve myself and exercise myself in my work. During this year, I have been learning constantly to supplement my own shortcomings. I know that to reach the high standards in the new era, only by adjusting my ideas, completely changing my ideas, and examining and reorganizing my work from a brand-new perspective can all the work be truly implemented. Below.

2. My work ideas are not coherent, which leads to my work efficiency not reaching the ideal height.

3. Subjectively, I have wavered in my thoughts, not pressured myself, and never really entered the role;

4. Team cooperation is neglected, and there is no regular communication with leaders at all levels and personnel in various departments;

5. There is also a lack of some innovative consciousness in working ideas.

The above points are the main problems that I personally have. Technician is one of the main functional positions of the company. Efficient and accurate? It is the duty of my technicians. We have great obligations and responsibilities in improving the competitiveness of enterprises. Only by continuous reflection and summary can the work be improved!

only by finding your own shortcomings can you make progress. As a technician, I want to realize my own personal value. The rise and fall of enterprises and institutions is directly related to personal honor and disgrace, in order to achieve the goal of * * *.

I want to make 1% efforts.

in terms of ideological awareness, I have always required myself to have the spirit of studying hard, innovating, striving for perfection, never being satisfied and taking care of the overall situation. We should put these spirits into concrete work.

For the coming second half of the year, I will continue to strengthen my study, improve myself and integrate myself into my work, focusing on strengthening my professional knowledge and expanding and improving. Here's a report on my work plan and ideas.

First, improve my working ability;

master the new work software? Oa automation office? Software, supplement the professional knowledge of architecture, combine with one's own specialty, improve the working system, strengthen self-cultivation, further strengthen the applied learning of _steel modeling software, and lay a solid foundation for future work.

second, be serious and responsible for the work of the process node.

I learned a lot about the work responsibility system from this year's workflow node, so strengthening the concept of work responsibility is the focus of future work. In many jobs this year, I didn't really know where my work focus was, and I didn't put all my energy on the work focus, resulting in the loss of total work.

Third, strengthen team cooperation and give full play to one's own working ability

As a technical staff member in the technical department, one should not only have a rigorous work style and a serious and meticulous work attitude, but also give full play to the team spirit and maximize one's working ability through team cooperation.

5. Keep work records at any time and do a good job of overall and comprehensive work ideas;

the ancients said:? The soldiers and horses didn't move food and grass first? Doing a good job in the overall work idea can effectively recognize the work priorities and arrange the work order, and can realize an orderly work process and get twice the result with half the effort.

the above work is my work summary for the first half of this year and my work prospect for next year. All talk and no practice? I will put it into action. I will constantly sum up and reflect, constantly spur myself and enrich my energy, improve my quality and business level, so as to adapt to the development of the times and enterprises, make progress with you and grow with the company.

Summary of personal work of technicians 3

Time flies, time has passed, and 2 years have passed in a blink of an eye. Under the leadership of leaders and with the support and cooperation of colleagues, I persisted in constantly learning theoretical knowledge, summing up my work experience, strengthening my ideological cultivation, striving to improve my comprehensive quality, strictly abiding by various rules and regulations, and completing various duties of my post. Here I would like to report my thoughts and work in this year as follows:

In 2 _ _ _ years, I served as the technical director of municipal engineering in _ _ _ _ district of Beijing and the post of engineering technician in _ _ _ _ _ district of Beijing. The total length of municipal engineering road alignment is ____m, including rainwater engineering, sewage engineering and reclaimed water engineering. _ _ _ The construction area of the project is about _ _ _ ㎡, and it is now in the stage of pile foundation construction.

as a technical manager, I implement the company's rules and regulations and finish all the management work in the construction on time and in quality:

Technical management: In the coming year, I participated in a series of technical work such as the blue prints.the design work, scheme preparation, technical disclosure and safety disclosure of the _ _ _ project, as well as the site construction and scheme preparation of the goaf shanty town.

due to the particularity of the _ _ _ _ project, the drawing time was seriously delayed. Even by the end of the project, the formal design drawings of rainwater pipeline, sewage pipeline and reclaimed water pipeline had not yet come out, and the road design drawings were only received when the road bed construction was about to enter. According to the actual situation, I organize relevant personnel to prepare the corresponding technical scheme in time after the blue prints.the design according to the bidding drawings.

There are many difficulties in drawing joint review, scheme preparation, construction organization design and so on without formal construction drawings, as well as in guiding on-site construction. In the construction, due to the lack of the bidding drawings to meet the use function, the project has to take out manpower and energy to investigate the demand of the surrounding users on the construction site for three pipelines after the start of construction, and then change the drawings according to their needs. For the changes and negotiations that often occur during the construction process, the visa changes that can be made before the construction are signed in time and accurately, while most of them can't be signed before the construction. After the construction is completed, the supervisor will be asked to sign the visa immediately, and all the information in the construction will be synchronized with the construction and filled in and collected in time.

during the construction of municipal engineering in _ _ _ _ _ in 2 years, it was praised and recognized by the owners and supervisors, which laid a good foundation for the next project in _ _ _ _.

during the construction of the _ _ _ _ project in _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ But after all, I am a professional in industrial and civil architecture, and I can understand the structural drawings and architectural drawings, so I won't bump into them like a fly. I believe that as long as I use snacks myself, I will soon master the skills in housing construction.

quality management: the technical knowledge learned from books and accumulated experience in the past can't meet the actual needs of construction. In the construction, especially in municipal engineering, we are required to treat quality inspection work without being overstaffed. Instead, we should treat our work with a down-to-earth and rigorous attitude. Those who don't understand are good at learning, and those who already know should strive for perfection, because technology is constantly improving and updating. Only through continuous learning, supplemented by refinement and pragmatism, can they be competent for their jobs.

cooperate with and obey the supervision and guidance of the supervision engineer, and strictly abide by the engineering supervision instructions issued by the supervision engineer.

the construction shall be carried out in strict accordance with the specification requirements, and the process management point control method shall be adopted for the quality control of the construction process. To ensure the quality of divisional and sub-divisional (unit) projects with process quality, those who fail to meet the process quality standards must be resolutely reworked until they pass the inspection before moving to the next process.

seriously implement it? Three inspections? System. That is, the initial inspection of the team, the re-inspection of subcontractors and the final inspection of the project department. In the new year, I will make efforts and do a good job from the following points:

1. Strengthen the study of business knowledge and continue to improve the management level: with the progress of the times and the application of new technologies, we must re-educate professional and technical knowledge. Therefore, in the new year, I intend to strengthen the study of professional knowledge first. I believe that as long as you work hard, there will be results. On the other hand, we should actively learn from the advanced points of others, foster strengths and avoid weaknesses, further improve our ideological understanding and broaden our horizons. Of course, while strengthening the study of technology, we should also constantly learn other knowledge, especially the business budget, so as to achieve all-round development and lay a good foundation for future work.

2. Further do a good job in construction management:

In the work of 2 _ _ years, although the project I am in charge of has made some achievements, there are still many shortcomings. In the process of management, I lack the initiative of bold management. In the future, I should strengthen my study and constantly improve my management level, and constantly sum up experience in my work. Make their own abilities better play.

In short, in the new year, I will further improve myself, study and improve the construction management methods and business level, and make contributions to the development of the company.

personal work summary of technicians 4

I am a professional technician and manager in the engineering department of _ _ _ Real Estate Co., Ltd. I feel extremely proud and happy to work hard for my major, and I am deeply grateful to the company for giving me such an opportunity and a development space!

____ was a year when our company developed _ _ international projects, and it was also a year when the company rose successfully, and it was also a glorious year for our engineering department. As a civil engineer, under the leadership of the engineering department, I mainly did some work.

1. Engineering technology management

① Carefully review the construction drawing, which is the first and key step in construction technology management. In the careful examination of the architectural structure drawings, we found many omissions, mistakes and contradictions in the design. For example, there is an extra beam on the structure of the corridor of Building 1, which affects the whole facade effect. There is no reinforcement in the local beam of Building 2, so it is impossible to construct according to the drawing. 1#, 2# building local doors and windows have no detailed size, and so on. After discovering these technical problems, I contacted the leaders and designers of the engineering department in time, and put forward good suggestions and treatment schemes according to the site conditions and specification requirements, so as to finally solve the problems and ensure the accuracy and integrity of the construction drawing. (2) technical disclosure, which is the central link in the construction technology management. After consulting the construction organization design and special scheme design, according to the characteristics of each working procedure and each part of the construction. Conduct special oral and written disclosure and make construction log records. For example: the binding of steel bars, the dismantling of formwork, the pouring of concrete, the masonry of infilled walls, the erection of scaffolding and so on. Technical problems should be pre-controlled and disclosed first, which laid the foundation for the construction quality, safety and progress of the project.

second, project site management:

this is my focus. (1) Engineering quality and safety control: check the elevation, axis, steel bar arrangement, formwork installation and dismantling, concrete molding and maintenance, and scaffolding erection of all construction parts according to the construction specifications and design requirements. Hidden dangers of quality and safety were found in the on-site inspection, and the construction process was timely understood, the root causes of hidden dangers were analyzed, and the construction personnel were coordinated to deal with the problems. After the treatment was completed, the inspection and acceptance were carried out, and finally the quality and safety were eliminated.