1 Tiling model contract Party A:
Party B:
In order to clarify the rights, obligations and responsibilities of Party A and Party B in the construction process and follow the principles of equality, voluntariness, honesty and trustworthiness, both parties reached an agreement on the sticking of wall and floor tiles in this project and signed this contract.
I. Overview of the Project
1, project name: Jiagang Demolition and Resettlement Community Phase III 12# Building
2. Project location: 500 meters east of Jinshui East Road intersection 107 auxiliary road.
3. Project content and requirements: Construction shall be carried out in accordance with design drawings, national specifications and related atlas, covering all walls and tiles of kitchen and bathroom.
Second, the way of contracting:
Party B's contracting methods, such as contract quality, safe and civilized construction, contract duration and contract acceptance (the contract duration must unconditionally meet Party A's overall construction schedule).
Third, the settlement price:
According to the agreement of both parties, the price of wall tiles is RMB/㎡ and that of floor tiles is RMB/㎡, calculated according to the actual area. Pay 50 thousand yuan for living expenses after the completion of the fifth floor; The engineering department, supervision department and Kazuki Watanabe musician Project Department will settle to 65% after acceptance, and the five responsible subjects will pay 85% after acceptance; Pay 95% after delivery, and settle the remaining 5% after the warranty period expires. (with big contract).
IV. Term of the contract:
The total calendar days of the contract period is 30 days, counting from the entry time determined by Party A through consultation.
Five, quality standards:
1, wall brick: the wall brick must be laid firmly, and there are no defects such as skew, hollowing, lack of stare blankly, falling corners and cracks. The basic items are as follows:
A. Surface: smooth and clean, with dense joints.
B, joint: the filling is dense and straight, the width is consistent, the brick is pressed in the right direction at the internal corner, the part where the whole brick is used is suitable, the external corner is cut at an oblique angle of 45, and the flat-fell seam is tight.
C, sleeve cutting; Cut and match with the whole brick group, with neat edges; Dado, sticking face and other prominent walls have the same thickness.
D the allowable deviation requirements of quality standards are as follows:
2. Floor tiles: The combination of the surface layer and the base layer must be firm without hollowing. The surface is clean, the pattern is clear, the color is consistent, the seam is uniform, the periphery is smooth, and the plate has no defects such as cracks, corners and missing edges. The ground immersion slope meets the design and specification requirements, and there is no slope inversion. The whole brick pasted at the floor drain should be cut consistently, tightly and neatly. The allowable deviation requirements of quality standards are as follows:
Note: the waterproof layer of the bathroom needs to be protected before construction, and then after completion.
The second closed water test will prevent damage in the construction process and test the construction effect.
Duties and obligations of intransitive verbs;
Responsibilities and obligations of Party A:
1. Provide Party B with tools, tools and processing sites in the construction area.
2. Provide Party B with a working face.
3. Arrange the construction sequence reasonably, and notify Party B in time if there is any design change.
4. Party A has the right to supervise and inspect the engineering quality of Party B during the construction process, and ask Party B to make rectification within a time limit if problems are found.
Responsibilities and obligations of Party B:
1. Party B must carry out the construction according to the construction plan and technical disclosure. The proportion of wall brick mortar is strictly controlled as 1: 1, and the leveling layer of floor tile is 1: 4. Where the cement consumption exceeds the budgeted consumption 1%, the expenses shall be borne by Party B..
2. According to Party A's time limit for a project, cooperate with other units to ensure the overall construction progress.
3. Party B shall conduct civilized construction on site and clean up the site after work. At the same time, other finished products should be well protected during construction. Party B shall be responsible for all maintenance work and expenses in case of any damage to the completed works such as latex paint, floor tiles, elevators, doors and windows in public areas.
4. Party B must do a good job in safety protection measures and quality management, and arrange a special person to be responsible for on-site safety and quality work. In case of any safety accident, Party B shall bear it; Party B shall bear the fines imposed by the higher authorities due to quality problems during the construction. ..
5. Temporary accommodation for Party B's construction personnel shall be provided by Party B itself, and materials shall be saved during construction. If Party B is fined by the higher authorities for wasting at will, Party B shall be responsible.
6. Party B shall take good care of its own materials, tools and mechanical equipment, and be responsible for any losses.
7. Wear safety protection articles correctly when entering the site, otherwise Party A and the supervisor will be fined for safe and civilized construction. Educate all construction workers to pay attention to hygiene. If you find shit in the building, you will be fined 300 yuan every time, which will be shared by each team.
Seven, warranty responsibility:
During the warranty period, if there are any quality problems in the project, Party B shall come to repair it within 48 hours after receiving the notice from Party A.. In case of quality problems caused by other man-made damages or civil engineering technical factors (which are not Party B's responsibility), Party B shall carry out maintenance as described in this article, and Party A shall pay maintenance fees to Party B according to the actual business. After the warranty period expires, if there is any quality problem, Party B shall send someone to repair it in time, and shall not refuse or delay, otherwise Party A has the right to recover the maintenance cost from Party B. ..
Eight, other matters not covered or the contract is incomplete, can be supplemented by both parties through consultation, and the supplement will take effect at the same time as the contract.
Nine. Liability for breach of contract:
1, if the quality between samples is lower than the standard, it will be regarded as unqualified, and 2 yuan will be deducted per square meter;
2. If there is any other breach of contract, the responsible party shall bear about 5,000 yuan of liquidated damages and other construction period losses.
X. Warranty period: 1 year, counting from delivery.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
2 Party A's (full name) model brick-laying contract:
Party B (full name):
Through negotiation between Party A and Party B, Party A subcontracts XX bathroom wall tiles, floor tiles, stair tread tiles and lobby wall tiles to Party B for construction. In order to clarify the responsibilities, rights and interests of both parties, and ensure the quality, progress, safety and civilized production of the project, this contract is specially signed for both parties to abide by and implement.
I. Overview of the Project
Project name: XX
Scope of work: wall brick, floor tile, stair tread brick, hall wall brick paving subentry project.
Duration: x years, x months, x days to x years, x months, x days.
Second, the way of contracting and charging standards
1. Settlement method of contract contents: including cleaning the base, transporting materials, jointing, installing the threshold and kicking the line; Settlement method: calculate and settle according to the actual completed area on site.
2. Contract price:
1 unit price of wall tile: yuan/m2; floor tile of bathroom: yuan/m2.
Unit price of floor tile: RMB/m2; Unit price of hall wall and floor tile: RMB/m2.
Unit price of stair tread and platform brick: RMB/㎡.
(All the above floor tiles include the skirting line, and the area is not calculated separately. )
Third, the project audit and payment
1. Party B applies to Party A for borrowing living expenses according to the actual completion of the project;
2. After Party B's project is completed, Party A will pay 80% of the total project cost after passing the preliminary inspection, 95% of the total project cost after the owner's acceptance, and the rest will be paid in one lump sum one year after the completion acceptance.
3. Party B shall provide Party A with a 2-year quality guarantee letter of commitment. In case of quality problems, Party B shall rush to the site for maintenance within 24 hours after receiving Party A's notice. Responsibilities and rights of Party A and Party B
1, Party A is equipped with management personnel, who are responsible for the preparation of schedule and construction scheme, the supply and scheduling of materials and equipment, and the timely technical disclosure of construction safety;
2. Party A is responsible for providing Party B with the construction site and other convenient conditions for construction operations; 3. Party B must organize the construction according to the construction tasks and technical requirements provided by Party A, and the construction personnel of Party B shall meet the reasonable arrangements of Party A;
4. Party B shall bring its own tools needed for construction, and has the obligation to actively cooperate with other teams for cross-construction;
5. Party B shall consciously care for the machinery and equipment in Party A's construction site and protect the finished products, semi-finished products and other labor achievements of this team and other teams. If there is any damage, relevant responsibilities will be investigated, and the site will be cleaned up in time after the work;
6. Party B must obey the arrangement of Party A's management personnel in terms of safety, technology, progress, quality, materials, labor and civilized construction. To ensure the cleanliness of the factory after the work is completed; If Party B refuses or ignores Party A's management of the above requirements, Party A may arrange others to complete it at the expense of Party B.. ..
V. Time limit, quality and safety in production
1. The construction period of this project will be fully completed before XX, XX, XX. If Party B's labor force
If the construction period is affected by factors such as insufficient organization, Party A may impose economic penalties;
2. Party B shall ensure that the project quality reaches the qualified standard. If Party B has quality problems in the construction process, Party A has the right to impose economic sanctions in addition to rework and rectification for free and compensation for material losses. In case of major quality accidents, Party A has the right to terminate the contract, not settle the completed project of Party B and compensate for the losses;
3. In the process of construction, Party B shall accept the inspection of Party A at any time, and if it finds that the construction quality does not meet the requirements, it shall immediately rework and rectify;
4. Party B shall earnestly strengthen the management of production safety to ensure that the target requirements of Party A's responsibility for production safety are met; Otherwise, Party A has the right to punish according to relevant regulations.
6. Matters not covered: Matters not covered in this contract shall be settled by both parties through consultation.
7. Number of copies of the contract: This contract is made in duplicate, one for each party, with the same legal effect. It will take effect after being signed by both parties, and will automatically become invalid after the project is completed and the settlement money is settled.
Party A (seal): Party B (seal):
Representative signature: Representative signature:
Date: Date:
Contact information: contact information:
3 Model of Party A's Brick Sticking Contract:
Party B:
Through consultation, Party A and Party B sign the following contract on the purchase and sale of ceramic tiles and floor tiles in the processing zone of Jewelry City:
1. Product name, specification, manufacturer, quantity, amount and delivery time:
(1) Supply name: ceramic tile and floor tile;
(2) Brand and trademark: Jiren Ceramics
(3) Specification and model: ceramic tile: 250mm*330mm floor tile: 330mm * 330mm.
(4) Manufacturer: Foshan, Guangdong
(5) Quantity: 250 mm * 330 mm:1550m2; 330mm * 330mm: 8 10/0m2
(6) Supply unit price: 250 mm * 330 mm: 1.80 yuan; 330mm*330mm:2.20 yuan.
(7) Supply time: supply at any time according to Party A's requirements.
Second, the quality requirements and technical standards:
(1) The subject matter that Party B must provide is excellent;
(2) Party B must supply the goods according to the samples already provided to Party A;
(3) Require Party B to provide the corresponding batch of warranty with the goods;
(4) Party A shall conduct random inspection and re-inspection on the batches of ceramic tiles and floor tiles supplied by Party B, and Party A may carry out construction at the same time. If the re-inspection is unqualified, Party B shall unconditionally return the remaining tiles and floor tiles constructed by Party A, and bear the re-inspection expenses, used tiles and floor tiles materials and related losses;
(5) Party A's sampling inspection of ceramic tiles and floor tiles does not exempt Party B from the quality responsibility of the supplied materials.
3. Mode of transportation and place of delivery: Party B will deliver the goods to Party A's site (Yangzhou Jewelry City Processing Zone site) and the construction site designated by Party A. ..
4. Unloading and expenses: Party B shall unload the goods by itself and bear the corresponding expenses.
Verb (abbreviation of verb) Party A accepts ceramic tiles and floor tiles as finished products, and Party A will not bear any losses (if there are defects or cracks during unloading, Party A will return all parts of the subject matter).
Settlement method and time limit of intransitive verbs: After the goods arrive at the site and are unloaded at the place designated by Party A, 50% of the total bid price shall be paid to Party B, and the balance shall be paid at the end of June.
Seven, Party B must provide the corresponding number of material invoices when receiving each payment.
Eight. Liability for breach of contract: If Party B fails to supply the goods in time or continuously, Party A has the right to refuse to pay the balance of the paid goods. If Party A fails to pay at the agreed time, Party B has the right to hold Party A responsible. If one party breaches the contract, it shall bear the economic losses caused to the other party.
Nine. Matters not covered in this contract shall be discussed separately by both parties.
X this agreement is made in duplicate, one for each party.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Template of Party A's Brick Laying Contract:
Party B:
In order to ensure the safe production, civilized construction, quality, progress and smooth progress of the project, in accordance with relevant laws and administrative regulations, and following the principles of equality, voluntariness, fairness, mutual benefit and good faith, Party A contracts the parking lot tile project of Wendajie Community Comprehensive Reconstruction Project to Party B. In order to clarify the responsibilities, rights and obligations of Party A and Party B, Party A and Party B sign this contract through consultation for common compliance. The specific terms are as follows:
I. Contract Contents and Unit Price
The price of parking lot tiles is RMB per square meter.
Second, the way of contracting.
Second, the quality requirements
1. Party B promises to carry out the construction in accordance with the design requirements, current relevant standards, technical specifications and Party A's requirements for the pavement works of this project, and illegal construction is strictly prohibited. Otherwise, all quality problems, impacts and losses caused by Party B shall be borne by Party B, and Party A has the right to unilaterally impose economic penalties and compensation on Party B according to the project losses and delays.
2. The construction quality of Party B in this project must meet the requirements of design, specifications and quality inspection and evaluation standards.
Three. Construction period: year month day to year month day.
Four. mode of payment
Verb (short for verb) others
1. Matters not covered in this contract or disputes during construction shall be settled by both parties through consultation.
2. This contract shall come into effect after being signed or sealed by the economic leaders of both parties, and shall automatically become invalid after the work within the scope of project contracting is completed and the project payment is settled.
3. This contract is made in duplicate, with each party holding one copy.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _