Section 1 Closed Management
1. Eye-catching and beautiful artistic fonts are written on the outside of the fence, including: project name, construction unit, design unit, construction unit, quality supervision unit, safety and civilized construction supervision unit, and contact telephone number of construction permit (brand).
2, the entrance to the construction site installation firm, solemn, beautiful door, door leaf closed.
3. Before commencement, the construction site shall be surveyed together with the construction unit, and corresponding protective measures shall be formulated for surrounding municipal facilities, pipelines, buildings and structures that may be damaged in the construction area to ensure construction safety.
Section 2 General Layout
1. The entrance and exit of the construction site and the main roads are hardened, and c25 concrete is poured in the traffic part of the site, with a thickness of 15 and a pavement width of 4m; The rest of the stone powder layer is 100 thick, so as to ensure that there is no stagnant water on the construction site and the passage is smooth, and corresponding safety protection facilities and safety signs are set up.
2, the entire construction site drainage culvert must be unblocked, without any water and temporary water supply pipeline leakage and long water phenomenon, construction sewage mud and domestic sewage should be set up to clean up before being discharged into the urban drainage pipe network or river.
3. Engineering signs (five signs and one map) must be set on the construction site, namely: engineering overview sign, civilized construction management sign, organization network sign, safety discipline sign, fire prevention notice sign and construction general plan. Five cards and one drawing adopt uniform specifications, with white characters on a blue background, which are uniformly customized by the company's security department. Each project department should set up a rain-proof publicity column in an obvious position in the gate of the construction site, and post five cards and one map and the propaganda content of safe and civilized construction.
4. Temporary buildings and structures, including offices, managers' dormitories (about 800 square meters outside workers' dormitories), canteens, warehouses, bathrooms, shower rooms and fire pools. , should be set in strict accordance with the location specified in the layout of the construction organization design. It shall be stable, safe and clean, and meet the requirements of fire control. Bamboo shed, asbestos tile and linoleum are strictly prohibited.
5, all kinds of materials, finished products, semi-finished products, mechanical equipment stacking position should be consistent with the construction plan.
6, the scene of the sand and gravel should be classified piled up, surrounded by bricks, other pipes, templates, red bricks and other bulk materials should be classified piled up.
7. Steel products shall be neatly stacked according to specifications, and product identification plates shall be hung. Processed semi-finished products should be hung with signs in different categories and put on shelves.
8, mixer, mortar machine, hoist and other machines and tools must be operated with a solid protective shed, and the machines and tools should be cleaned up after use every day. At the same time, the ground around the machine should be hardened. Construction machinery operators and special operators must hold valid operation certificates.
Section 3 Office and Living Facilities
1, the construction work area and living area must have strict isolation measures, and steel pipes can be used as isolation barriers. Its height is not less than 2 meters, the green dense mesh safety net is hung on the guardrail, and the steel pipe is painted yellow and black. And hanging civilized construction placards or civilized construction rules and regulations, dangerous areas should have eye-catching safety warning signs, and warning red lights should be set for night operations.
2, the erection of container dormitory, must be strong, with good moisture-proof, ventilation and lighting performance. The per capita area is not less than 2 square meters, the clear height of the room is not less than 3 meters, and the depth is not less than 5 meters. The bed should be a two-layer painted steel bed, 2m long and 1 m wide. The first bed is 0.5 meters from the ground, and the blink distance between the second bed and the first bed is 1 meter, with no more than 20 people in each room. Dormitories should be designed and erected according to the electricity consumption standard, and it is strictly forbidden to connect wires at will. It is forbidden to use electric appliances such as electric stoves and rice cookers and to cook food with naked flame.
3, the field office must be hung with the corresponding post responsibility system and supporting charts, tables and chairs, office supplies neatly, keep the environment clean and tidy, set up electric water heaters, tea sets.
4, the construction site should be set up flush toilets for men and women, set up a simple septic tank or septic tank and affix it, and spray water regularly. The ratio of squatting position to people is 1:20-25, and tiles are attached. Toilet walls are plastered and painted, and a special person is responsible for cleaning and disinfection every day to prevent mosquitoes and flies.
5. A shower room should be set up on the construction site, with the nozzle and ratio of 1: 20, with cement floor or ceramic tiles, indoor drainage and exhaust facilities, waterproof bow, waterproof switch and leakage protection device for lighting, and designated persons should be responsible for maintaining hygiene.
6. The walls and ceilings inside and outside the canteen are whitewashed, the ground is paved with cement surface or floor tiles, screen doors and screens are installed, and facilities such as ventilation, exhaust and sewage discharge are installed. The stove must be tiled.
The fourth quarter on-site fire prevention
1, the construction site must formulate a fire control management system, define the person in charge of fire control management, carry out fire control safety activities and fire control safety knowledge publicity and education, train volunteer firefighters, equip fire control equipment according to regulations, and establish fire control files.
2, the construction site should be hung eye-catching fire safety signs, signs, a clear division of fire prevention work area. The distance between hot work area and projects under construction and other temporary building facilities shall not be less than 20m, the distance between acetylene generator and all open flames shall not be less than 1m, and the distance between acetylene generator and oxygen cylinder shall not be less than 5m.
3. In flammable places such as offices, container dormitories, carpentry sheds, kitchens, warehouses, etc., two or more hanging fire extinguishers should be set up respectively, and the extinguishing agent should be replaced regularly according to the instructions, and a fire pool and a fire sand pool should be equipped at the same time.
4, the construction site where there is a possibility of fire engineering work must carefully clean up the scene, put an end to fire hazards.
Section 5 Health Management
1, define the person in charge of health in each area of the construction site, formulate a health management system, set up enough garbage pools and trash cans, do a good job in environmental sanitation on a regular basis, clean up garbage and apply pesticides; Four evils, there must be no peculiar smell and toxic gas on the construction site.
2. After the work, it is necessary to remove the brick slag and sand debris on the operation surface and the ground. Each layer of construction waste must be bagged and transported to the designated place for unloading. It is forbidden to throw construction waste downward from a height. Construction waste should be piled up in the fence and transported away.
4, transport vehicles must be rinsed clean before leaving the road.
5. Vehicles carrying building materials, earthwork, construction waste and engineering dregs shall take effective measures to ensure that roads and the environment are not polluted during driving. Strictly implement the Provisions of Shenzhen Special Zone on Strengthening the Management of Earthmoving Vehicles (Shen Jian Zi [1997]No. 185).
6. The daily necessities in the dormitory should be put in order, the clothes and bedding should be folded neatly, the shoes should be put away, the clothes drying pole should be set outdoors, and the clothes can't be dried indoors.
7, formulate dormitory health duty management system. Clean up every day and keep the dormitory clean and tidy.
8. The canteen on the construction site must obtain the hygiene license (to the municipal sanitation and epidemic prevention station) and meet the hygiene standards. Cooks should wear white work clothes (hats) and maintain personal hygiene. Cooks and tea workers should have a health examination once a year and hold valid health certificates.
9, canteen cooking should be clean and hygienic, food storage cabinets (boxes) and vegetable rice should be cooked separately and marked. Cooked food operation should have a fly-proof room or fly-proof cover. It is forbidden to use non-edible plastic products as cooked food containers.
10. According to the number of people dining, the venue should provide dining places that meet sanitary conditions and be equipped with simple dining tables. At the same time, there are special insulated drinking buckets. Littering and leftovers are strictly prohibited.
1 1. Tea kiosks and buckets should be set up on the construction site, and sealed and locked. * * * The water cups used should be disinfected at any time, and measures should be taken for heatstroke prevention and cooling in summer construction.
12, the construction site should be equipped with medical order health care medicine box, commonly used trauma and life medicine should be complete.
Section 6 Dust and Noise Management
1. There shall be no dust on the construction site. For hard parts that are not hardened for other reasons, they should be tamped and sprinkled regularly to reduce the pollution of dust to the surrounding environment.
2. It is forbidden to burn toxic, harmful and malodorous substances on the construction site.
3. When loading and unloading dusty materials, they should be wetted with water and carried out in the warehouse.
4. When the noise of urban construction operation may exceed the noise limit of the construction site, the construction project department shall report to the construction administrative department and the environmental protection department before the start of construction, and the construction can only be started after approval.
5. In urban areas, it is forbidden to carry out construction operations that generate noise at noon and at night (noon to 2 pm 12, evening to 7 am the next day 1 1). If it is really necessary to continue the construction work at noon or at night due to special circumstances such as technical reasons, an application shall be submitted to the construction administrative department and the environmental protection department.
Section 7 Public Security Management
1, the construction site must establish and improve the security system, the implementation of public security, fire prevention and family planning responsibility.
2, the scene must set the guard and full-time security personnel on duty, establish a visiting registration system, are not allowed to stay with family members and outsiders.
3. Strictly entertain the labor and employment management regulations of Shenzhen, and migrant workers must hold it when they enter the venue; Four syndromes; (that is, birth certificate, temporary residence permit, employment certificate, employment certificate) The project completes the formalities of deleting the flower name and visa in the labor contract.
4. Managers and workers on the construction site must wear work cards. Work cards are uniformly customized by the company's security department. The badge has company name, company logo, personal photo, name, position or type of work, and the badges of managers and operators are color-coded.
5. Managers and workers on the construction site must wear safety helmets with company name signs made by the company's security department according to the standard requirements.
6. The project manager shall educate all personnel on the construction site about civilized construction, and educate the contents of civilized construction at the same time of safety technical disclosure, with special records.
7, the project manager must organize all the staff of this project (migrant workers) to seriously study the knowledge of relevant laws and regulations, enhance the concept of the legal system, not to make trouble, fighting, pornography, gambling, drugs and other illegal activities are strictly prohibited. , put an end to criminal offences and violations of law and discipline.
8, the construction project department should take the initiative to build good relations with relevant community units around the site, actively carry out * * * civilized activities, play the role of civilized window, and establish a good image of construction enterprises.
9, the project department should be based on the actual conditions, as far as possible to set up a recreation room, set up newspapers, radio, television and other facilities for learning, rest, entertainment activities, to create a healthy and civilized enterprise production grassroots cultural environment.
Section 8 All kinds of security systems
I. Safety education and training system
In order to ensure safety in production and make employees familiar with and consciously abide by the regulations on safety in production, the following systems are formulated:
1. Workers who newly absorb or change jobs must receive safety education before taking up their posts. Only after passing the exam can they be allowed to operate.
2, special types of workers should attend the training courses organized by the competent department, after passing the examination, show certificates.
3. According to the safety contract, conduct a theoretical assessment of safety technical knowledge once a year, and establish an assessment result file.
4. The main contents of safety education include:
(1) Carry out the guidelines, policies, decrees and regulations of the Party and the State on safety construction.
(2) Safety production management regulations.
(3) Mechanical and electrical and various safety technology operating procedures.
(4) Experiences, lessons and preventive measures in the construction and safety work of dangerous production areas.
(5) Hazards and protection of dust poison.
(6) Implement a three-level safety education system, including on-site education and on-the-job education.
Second, the safety technical disclosure system
1, before the project starts, the safety technical measures should be carefully disclosed to the employees involved in the construction along with the construction organization design, so that the employees can know when and what actions to take and explain their importance.
2. Before each single project starts, the safety technical measures of the single project must be repeated, and the phenomenon that only the editor knows but the builder doesn't know must be resolutely corrected.
3. The safety technical disclosure system should be implemented step by step. Before construction, the technical director shall make disclosure to all employees. When two or more construction teams or types of work cooperate with the construction, safety disclosure shall be made according to the progress of the project. The team leader should make safety disclosure on the construction requirements and working environment for the workers every day, and must fill in the safety technical disclosure card when issuing the construction task.
Three, safety technical measures and safety technical measures plan
1, safety technical measures:
(1) All operators participating in the construction should be familiar with the safety technical regulations and safety operation regulations, that is, the technical director, and must be familiar with the safety technical regulations of construction and installation projects; Workers must strictly abide by the safety technical operating rules of construction safety workers;
(2) All engineering construction organization design (construction scheme) must have safety technical measures. Large-scale special projects such as blasting, hoisting, underwater, high-rise scaffolding, temporary construction, demolition, deep pit, etc., must prepare a single safety technical plan, otherwise construction may not be carried out;
(3) The plane position of roads, water supply and drainage, electrical lines, material stacking and temporary facilities on the construction site should meet the requirements of safety, hygiene and fire prevention, and strengthen management to ensure safe production and civilized construction;
(4) The safety protection devices of various mechanical and electrical equipment should be complete and effective, otherwise they can't be used, and they should be maintained regularly. When overhauling mechanical and electrical equipment, the safety protection device should be overhauled at the same time;
(5) Scaffolds, tic-tac-toe frames and safety nets can only be used after the customs declarers of the Engineering Department have passed the inspection. In the process of use, a special person should be appointed to maintain it. If deformation or inclination is found, it should be reinforced in time.
(6) Pits, ditches, wells and various holes in the construction site should be filled up or fences, cover plates and drainage ditches should be set up. Temporary headquarters should be set up at intersections with narrow venues, frequent pedestrians and traffic; Fences and safety signs should be set in inflammable and explosive places, around transformers and dangerous places, and red lights should be used for warning at night;
(7) All kinds of safety facilities, equipment, signs, color codes, etc. It is not allowed to be dismantled without authorization. If it must be dismantled, it must be approved by the person in charge of the construction site and the security department;
(8) Implement the system of safety technical disclosure step by step. Before starting work, the technical director shall make disclosure to all employees. When two or more construction teams or types of work cooperate with the construction, the safety disclosure of cross-operation should be carried out according to the project, and the team leader should disclose the construction requirements and working environment to the workers every day;
(nine) concrete mixing stations, asphalt processing plants (fields), quarries and painting workplaces should take measures to reduce the concentration of dust and toxic substances, so that they can meet the prescribed standards;
(10) Various safety technologies and industrial hygiene innovations can only be used after being tested, appraised and corresponding measures are formulated;
(1 1) Use personal protective equipment correctly. Anyone who enters the construction area must wear a safety helmet and fasten his seat belt when working at heights. It is forbidden to wear slippers, high heels or enter the construction site barefoot.
(12) The construction unit that does not have the safety conditions shall not contract out the project, and the general contractor shall strengthen the safety management of subcontractors and organize and manage the on-site safety production in a unified way;
(13) The operation of construction machinery shall be carried out by special personnel, and the operating procedures and operator listing system shall be implemented;
(14) Construction site, wood processing plant (workshop) and warehouse for storing explosive equipment. It is necessary to establish a fire prevention management system, prepare enough fire prevention facilities and fire extinguishing equipment, and check them regularly to keep them in good condition. It is forbidden to use fire or smoke near inflammable and explosive places.
2, safety measures design:
(1) The company must prepare the safety technical measures plan while preparing the production, technical and financial plans, and the annual complete technical measures plan shall be submitted to the relevant departments at the same time as the annual production plan.
(2) The scope of the safety technical measures plan is:
① Safety technical measures: all measures aimed at preventing industrial accidents, such as protective devices, signal devices and safety devices;
(2) Technical measures of industrial hygiene: improving the production environment harmful to employees' health, etc.
(3) Auxiliary houses and facilities: bathing, changing clothes, disinfection rooms and other houses and all facilities necessary to ensure production and health;
④ Publicity and education on safety production: purchase necessary facilities such as safety technical teaching materials, books and instruments, and safety training courses.
3, the unit leader is responsible for the preparation and implementation of safety technical measures plan, the required funds from the technical transformation fee according to 10% (minimum standard) extraction, earmarking, shall not be misappropriated.
Four, special operations personnel mount guard system
1. Anyone engaged in special operations such as electrician, electric welding (gas cutting) crane operation, blasting, underground operation and climbing operation. Must accept the safety education and safety technical training of relevant departments stipulated by the state, and those who pass the examination and obtain the operation certificate shall be allowed to work independently;
2, engaged in special operations personnel, must have; Serious and responsible work, good health, no diseases and physical defects that hinder operation; Basic conditions, and have the education level, safety professional technical knowledge and practical experience required for the operation;
3, special operations personnel should remain relatively stable, shall not be arbitrarily change jobs;
4, the operation must hold relevant certificates. Illegal operation is strictly prohibited;
5. Special operators who have obtained operation certificates. It must be reviewed regularly in accordance with relevant regulations.
Five, production safety inspection system on a regular basis
1. Regular inspection: the company will be inspected once a month and every ten days by the engineering department (factory or site), and the company will report the inspection after inspection;
2. Irregular inspection: All units shall timely organize safety inspection of dangerous projects according to seasonal changes, such as cooling in summer, flood control and electricity prevention in rainy season, typhoon prevention in autumn and fire prevention in winter;
3. Safety inspection before and after holidays: In view of the lax discipline of some employees before and after holidays, all units should conduct a comprehensive inspection of safety production, fire fighting and civilized production.
4, regular safety inspection and seasonal change of irregular inspection, should have a clear purpose plan, and organized by the leadership of the relevant personnel to participate in, check carefully, do check while changing, while checking, to find out the hidden dangers of accidents, can't immediately accident, to register, make a rectification plan, personnel, measures and completion date, before the hidden dangers are not eliminated, reliable protective measures must be taken, if there is an emergency, in a timely manner.
5, all regular monthly inspection, should implement the inspection scoring system, inspection content, scoring standards according to the Ministry of construction; Scoring standard for construction safety inspection; Go on.
Six, civilized construction management system
1, safety helmet must be worn on the construction site, slippers, hard shoes, high heels and going to work barefoot are strictly prohibited.
2, the team should check the matters needing attention about safety in production and civilized construction.
3, must be set up in accordance with the provisions, safety net, set up warning signs in eye-catching and dangerous places, the scene to install leakage protector.
4. Mechanical equipment, temporary facilities and materials must be stacked according to the layout, and the roads should be clear. Water supply and drainage in the construction site must be kept unblocked, and sewage shall not be discharged indiscriminately, so that it can be cleared after work.
5, shall not be illegal command, illegal operation.
6, must do a good job in site environmental sanitation, don't litter.
7, special type of work should hold relevant certificates.
8. The dormitory inside and outside the construction site should be clean and tidy, and it is forbidden to pile up sundries, pull wires or hang clothes.
9. The canteen (kitchen) should be clean, tasteless, without wires, with smooth drainage, and the food should meet the hygiene standards.
10, the toilet layout is reasonable, which meets the hygiene requirements and has no impact on the environment.
Seven, the construction site guard system
1. The doorman has the right to question all people who enter and leave the site.
2. Off-site construction personnel shall not enter the site without permission;
3. Stick to your post and don't leave your post casually;
4, for all incoming and outgoing materials, completes the acceptance formalities;
5, conscientiously do a good job in site fire prevention and theft prevention;
6, must do a good job in front of the environmental sanitation;
7, outsiders without the permission of the security guards, shall not stay in the construction site.
For more information about project/service/procurement bidding, and to improve the winning rate, please click on the bottom of official website Customer Service for free consultation:/#/? source=bdzd