(1) Agriculture and forestry
1. Wet fiberboard production technology (26)
2. Dripping rosin production technology (26)
(2) Coal
1. Coal mine that is not built according to the mine field scope and well type determined in the approved mine planning
. Coal mines with coal production license
3. Various small coal mines within the mining area of state-owned coal mines (the scope confirmed by the mining registration of state-owned coal mines)
4. Mines with a single well type of less than 3, tons/year (except extremely thin coal seams) (27)
5. There are no sulfur reduction measures. Production mine of high-sulfur coal (with sulfur content higher than 3%) that has not been discharged up to the standard
6. Production mine of high-ash coal (with ash content higher than 4%) that cannot be used locally
7.6AM, φM-2.5 and PA-3 briquettes
8. Explosion-proof high-voltage switches for Pb2, PB3 and PB4 mines
9. ZY3 hydraulic support
12. Wooden support
(3) Electric power
1. Within the coverage of large power grid, Conventional coal-fired condensing thermal power units with a single unit capacity of less than 1, kilowatts at the end of service
2. Conventional small thermal power units with a single unit capacity of 5, kilowatts or less
3. Oil-fired boilers and generator sets mainly for power generation (5, kilowatts or less)
(4) Oil, natural gas and chemical industry
1. Oil and gas fields without mining licenses, Oil and gas fields that do not conform to the overall development plan of national oil and gas resources
2. Refined oil production facilities that fail to meet the national standards in terms of safety and environmental protection
Small oil refining production facilities that produce gasoline, coal and diesel (25)
Sulfite-based sulphuric acid production facilities that are less than 44, tons/year (25)
55, units/year and below. Or a tire production line with natural cotton cord fabric as the skeleton
61, tons/year or less, a dry granulation carbon black production device
a yellow phosphorus production line below p>7.1 tons/year
8. A single-line production line with calcium roasting chromium compounds below 1, tons/year (26)
9. Indigenous oil refining
1. Mercury caustic soda < Under years old) calcium carbide furnace and open calcium carbide furnace
12. Calcium carbide furnace with substandard discharge
13. Iron powder reduction process
14. Ammonium sodium process and cyanide melt process for producing sodium cyanide
15. Paraquat production process with high and medium temperature sodium process
16. Manual packaging (filling) equipment for pesticide products
17. 66 type cold storage process air separation equipment
19. resin production process for direct fire heating coating
2. chlorofluorocarbon (CFCs) production device (eliminated according to the requirements of the national overall plan for implementing international conventions)
21. main carbon tetrachloride (CTC) production process (eliminated according to the requirements of the national overall plan for implementing international conventions)
22. The national master plan for the implementation of international conventions requires elimination)
23. CFC-113 production process of fluoropolymer as processing aid (eliminated according to the requirements of the national master plan for the implementation of international conventions)
24. 1,1 for cleaning, 1-trichloroethane (methyl chloroform) production plant (eliminated according to the requirements of the national overall plan for the implementation of international conventions)
25. Methyl bromide production plant (eliminated according to the requirements of the national overall plan for the implementation of international conventions)
26.1 tons/ Saponins (including hydrolysates) production plant under 27
27. Saponin production process by acid hydrolysis of hydrochloric acid and saponin production plant whose pollutant discharge can't meet the standard (26)
28. Paint production process containing DDT (eliminated according to the requirements of the national overall plan to implement international conventions)
29. Non-closed production process of dicofol with DDT as raw material (according to the national international implementation) P > (V) Iron and steel
1. Indigenous coking (including improved coke oven)
2. Coke oven with carbonization chamber height less than 4.3m (except tamping coke oven of 3.2m and above) (in 27, Western China in 29)
3. Clay sinter
4. Hot sinter
Sintering machine below 5.3m2 (25)
Blast furnace below 6.1m3
7.1 ~ 2m3 (including 2m3) Blast furnace (excluding ferroalloy blast furnace) (25) Years)
9. Production of strip steel, Power frequency and intermediate frequency induction furnaces for steel ingots or continuous casting billets
converters with a capacity of p>1.15 tons or less (excluding ferroalloy converters)
electric furnaces with a capacity of p>11.1 tons or less (excluding mechanical casting furnaces)
12. Steelmaking by melting iron
converters with a capacity of 13.15-2 tons (excluding ferroalloy converters)
14.2. Mechanical casting electric furnace (25)
16.2-ton electric furnace (excluding high alloy steel and mechanical casting electric furnace) (26)
17. Double double wire rod mill
18. In-line wire rod mill
19. In-line small mill
2. Overlapping thin plate mill
2. Hot-rolled seamless pipe mill with a diameter of less than 76mm
25. Three-roller wire rod mill (excluding special steel production) (25)
26. Metallurgical furnace with substandard environmental protection (25)
27. Manual earth asphalt tar impregnation device, earth shaft kiln with mixed burning of ore raw materials and solid raw materials, natural ventilation and manual operation. Inverted flame kiln (25) with coal as fuel, and dust purification not up to standard
submerged arc furnace with p>28.32 kVA and below, semi-closed DC reduction furnace with 3 kVA and refining furnace with 3 kVA and below (Si-Ca alloy, electric furnace metal manganese, Si-Al alloy, Si-Ca-Ba-Al, ferrotungsten, Except special electric furnaces such as ferrovanadium)
Ferroalloy ore-smelting electric furnace with a maximum output current of less than 5, A (25)
3. Steam-heating kneading furnace, inverted flame roaster, AC graphitizing furnace, graphitizing furnace with a maximum output current of less than 5, A and its parallel units (6)
. Mining and dressing projects for specific minerals such as tungsten, tin, antimony and ionic rare earth that are subject to protective mining as stipulated by the state without mining license
2. Tungsten, tin, antimony and ionic rare earth smelting projects and tungsten processing (including cemented carbide) projects that are not approved by the competent department of the State Council
3. Roasting with muffle furnace, manger furnace, horizontal tank and small vertical tank, Simple condensation facilities for dust collection and other backward ways to smelt zinc or produce zinc oxide products
4. Use backward ways such as iron pot and earthen stove, distillation tank, crucible furnace and simple condensation and dust collection facilities to smelt mercury
5. Use pit furnace or crucible furnace for roasting. Refining arsenic oxide or metal arsenic products by backward methods such as simple condensation facilities dust collection
6. Aluminum self-baking electrolytic cell
7. Closed blast furnace copper smelting process and equipment with hearth area of 1.5 square meters or less
8. Closed blast furnace copper smelting process and equipment with hearth area of 1.5 ~ 1 square meters (26)
Closed blast furnace copper smelting process and equipment with hearth area of p>9.1 square meters or more (26) Copper smelting process and equipment in reverberatory furnace (26)
11. Dry purification and hot concentrated acid washing technology in flue gas acid production
12. "Two-person-turn" non-ferrous metal rolling mill (26)
13. Smelting antimony in backward ways such as pit furnace, crucible furnace and Hertzian furnace
14. Sintering pot and sintering. Process of recycling lead (25)
(7) Gold
1. Process of extracting gold with mixed mercury
2. Process of small-scale pool leaching, small heap leaching and small smelting
3. Without the approval of the competent department of the State Council, Mining projects without approval or mining license for mining gold minerals
(8) Building materials
1. Six machines and below are vertically led to the flat glass production line
2. The flat glass ordinary flat drawing process production line and the "lattice method" flat drawing production line with a daily melting capacity of less than 1 tons
3. The cement mechanized vertical kiln production line with a kiln diameter of 2.2 meters and below
4. No laminating. Low-grade building ceramic tiles below 2, pieces/year, low-grade sanitary ceramic production line below 2, pieces/year
gypsum board production line below 64, square meters/year
72, square meters/ Production line of modified asphalt waterproofing membrane under 26
8. Cement dry hollow kiln with a kiln diameter of 2.5 meters or less (except for producing special cement)
9. Cement grinding equipment with a diameter of 1.83 meters or less
1. Cement-soil (egg) kiln and ordinary vertical kiln
11. Building sanitary ceramic earth kiln and inverted flame kiln. Sagger-loaded sanitary ceramic tunnel kiln
12. Friction brick press for building ceramic tile forming
13. Lime soil vertical kiln
14. Ceramic crucible glass fiber drawing production process and equipment
15. Wheel kiln with less than 18 doors, vertical kiln, endless wheel kiln, Horseshoe kiln and other earth kilns
16.4 and below ordinary brick squeezers
17.45 ordinary brick squeezers (26)
18.SJ158-3 double shaft, Single-shaft mixer
19.SQP45-75 double-roll crusher
2.1 type common slitter
21.1 tons of rotary brick press
22. Handmade wallboard production line
23. Simple mobile concrete block forming machine and attached vibration forming table (25). Fixed forming machine for concrete floor tiles with a single shift of less than 1, square meters/year
25. Production process of gypsum (hollow) blocks that are poured manually and not mechanically
Asphalt paper tire linoleum production line with a volume of less than 261 million rolls/year
27. Shi Ying glass production process equipment with vacuum pressurization method and one-step gas refining method
28.6×6 tons of cubic top small press to produce synthetic diamonds. Non-autoclaved curing aerated concrete production line
3. Non-mechanized non-metallic ore mining without mining license or not meeting the requirements of environmental protection and safe production
(9) medicine
1. manual capsule filling process
2. cork wax-scalding packaging medicine process
3. ampoule drawing and filling machine not meeting GMP requirements
4. tower-type heavy distilled water device
. Raw material drug production equipment (26)
(1) Machinery
1. Heat treatment lead bath furnace
2. Heat treatment barium chloride salt bath furnace (high temperature barium chloride salt bath furnace, Suspension of elimination)
3.TQ6, TQ8 tower cranes
4.QT16, QT2, QT25 derrick simple tower cranes
5.KJ16/ 122 single drum hoist
ordinary brown corundum smelting furnace below p>6.3 kva
silicon carbide smelting furnace below p>7.3 kva
8. Forced-driven simple elevator
9. Tobacco expansion equipment production line with chlorofluorocarbons (CFCs) as expansion agent (eliminated according to the requirements of the national overall plan for fulfilling international conventions)
(11) light industry < Lake salt and northern sea salt production equipment
2. Southern sea salt production equipment using brine from ore and oil and gas fields and using flat pan and beach drying salt production equipment
31, tons/year or less
4. Tanning production equipment with an annual processing capacity of less than 3, pieces of leather
5,3 tons/year of ink production equipment (using high technology, Except pollution-free)
6. Carbonated beverage production line with a capacity of less than 1 bottles per minute (with a bottle capacity of 25 ml or less)
Chemical pulping production line with a capacity of less than 71,7 tons/year
Straw pulp production device with a capacity of less than 83,4 tons/year (27)
9. Production process of extruded polystyrene foam (eliminated according to the requirements of the national overall plan to implement international conventions)
1. Refrigerators, freezers, automobile air conditioners, industrial and commercial refrigeration with chlorofluorocarbons (CFCs) as foaming agent or refrigerant, Refrigeration equipment production line (eliminated according to the requirements of the national overall plan for the implementation of international conventions)
11. Production process of carbon tetrachloride (CTC) as cleaning agent (eliminated according to the requirements of the national overall plan for the implementation of international conventions)
12. Production process of CFC-113 as cleaning agent (eliminated according to the requirements of the national overall plan for the implementation of international conventions)
13. Production of methyl chloroform (TCA) as cleaning agent. The overall plan of the international convention requires elimination)
14. Bicycle salt bath welding furnace
15. Tin welding process in tin printing and canning industry
16. Production process of match stem arrangement and discharge
17. Match stem arranging machine, stem arranging machine, Stalk unloader
18. Impact nailing machine
19. Impact wire mesh loom
(12) Textile
1. Spinning machines produced before the founding of the People's Republic of China
2. All "1" prefix spinning machines
3. B582 and A513 series spinning machines produced in 1979 and before < p BC582 coarse spinning frame
6.B591 wool spinning frame
7. All kinds of domestic wool spinning frames with a service life of more than 2 years
8.B61, Model B61A wool twisting machine
9. Leather roller gin with roller length less than 1mm (except for long-staple cotton seed processing)
1. Sawtooth gin with saw blade less than 8
11. Cotton lint baler with pressure tonnage less than 2t (excluding 16t short-staple cotton baler)
12.1332SD winder
. BC272B carding machine
14.B71A woolen yarn rocking machine
15.B311C, B311C(CZ) and B311C(DJ) combers
16.1511M-15 loom <