The green line of Nanming River as mentioned in these Provisions refers to the control and protection line of green space on both sides of Nanming River. Article 3 These Provisions determine the scope of protection of the Nanming River Green Line. The upstream starts from Huaxi Reservoir Dam and the downstream ends at Wudang Bridge. The protection width of the green line on both sides of Nanming River is planned and controlled according to the water source protection, landscape requirements and the current situation of cross-strait construction.
(1) The protection scope of the Green Line on both sides of the river bank from Huaxi Reservoir Dam to Longwangmiao Section shall be controlled by retreating 50 meters from the secondary coastline of the river bank, and the protection scope on both sides of the river without secondary coastline shall be controlled by retreating 70 meters from the center line of the river.
(2) The protection scope of the green line on both sides of the riverbank from Longwangmiao to Wuyanqiao is controlled by the second-level retreat of the riverbank line of 20 meters.
(3) The protection scope of the green line on both sides of the river bank from Wuyan Bridge to Shuikousi Bridge shall be controlled according to the secondary shoreline of the river bank line of not less than 20m.
(four) the scope of protection of the green line on both sides of the river bank from Shuikousi Bridge to Wudang Bridge shall be controlled according to the retreat of 60 meters on both sides of the river center line.
The protection scope of Xihe River, Guancheng River, Che Xiao River, Chenliang River and Madi River, tributaries of Nanming River, shall be controlled in accordance with the Technical Regulations of Guiyang City Planning. Article 4 The competent department of urban planning administration of the Municipal People's Government shall be responsible for the planning and management within the protection scope of the Nanming River Green Line.
The municipal forestry greening department is responsible for the daily supervision and management of the planning and implementation of Nanming River Green Line. Article 5 The municipal and district people's governments shall organize relevant departments and citizens to plant trees and grass within the protection scope of Nanming River Green Line, expand forest coverage, increase vegetation and maintain soil and water. Article 6 Construction projects shall be strictly controlled within the protection scope of Nanming River Green Line, and development and construction unrelated to the protection of Nanming River Green Line shall not be carried out. Article 7 The construction of municipal public facilities such as flood control, sewage treatment, sewage interception, greening and sketch building within the protection scope of Nanming River Green Line must be reported to the competent department of urban planning administration of Guiyang for examination and approval, and the construction can be started only after going through the relevant formalities. Article 8 In addition to cultural relics and municipal public facilities, buildings and structures illegally built and left over from history within the scope of protection of Nanming River Green Line shall be gradually cleaned up and demolished by the urban management administrative department in accordance with the planning requirements of Nanming River Green Line. Article 9 The construction of projects unrelated to the protection of Nanming River Green Line within the protection scope of Nanming River Green Line shall be dismantled in accordance with the Urban Planning Law of People's Republic of China (PRC), the Regulations on Urban Planning Management of Guiyang City and the Provisions on Administrative Punishment of Urban Planning Management of Guiyang City (for Trial Implementation).
Destruction of greening and facilities shall be punished in accordance with the provisions of the Regulations on Urban Greening, the Regulations on Greening in Guizhou Province and the Regulations on Greening in Guiyang City. Article 10 Where a construction project is examined and approved outside the scope of protection of the Nanming River Green Line, the administrative examination and approval documents are invalid, and the persons who are directly responsible for illegal examination and approval shall be given administrative sanctions by their units or the competent authorities at higher levels. Eleventh these Provisions shall be interpreted by the legal institution of the Municipal People's government. Twelfth the provisions of 2002 10 month 1 1.