1. Color steel tile steel plate hand-held roof steel structure renovation rust removal wire wheel gasoline grinder

2. Spraying machine

3. Color steel plate renovation paint

New Tushi color steel plate renovation paint is made of modified water-based resin as the main film-forming material, supplemented with pigments, fillers, functional additives and other materials. Refined using advanced technology. Improves the dryness, hardness, gloss and leveling of the paint film, and has good adhesion to the substrate. It has the characteristics of fast drying speed, safety and environmental protection, strong paint film, strong adhesion and easy construction. It is suitable for the surface of color steel tiles to protect and decorate.

Before painting, the substrate must be dry, dust-free, free of rust, oil stains, welding slag and old paint must be removed. The rusted substrate must be completely removed. It is recommended to apply a water-based primer to enhance its adhesion.

It needs to be stirred evenly before use, and can be applied by roller, spray or brush. If dilution is needed, the amount of water added should not exceed 10% and should be stirred evenly before use. It is strictly prohibited to mix with other coatings and organic solvents.

Maintain ventilation during construction, and do not construct when the ambient temperature is lower than 5℃ and the humidity is greater than 70%. Avoid construction in rain, snow, fog, and sandy weather. It is strictly prohibited to be exposed to rain or fog within 2 hours of painting.

The interval between one and two coats of painting should be more than 2 hours, and maintenance should be carried out at 25°C for 7 days. Low temperature (not lower than 5℃) should be extended appropriately to obtain the ideal paint film effect.

Theoretical paint consumption: 8-10 square meters/kg for one pass (dry film 30 microns). The actual amount of paint consumed varies depending on the roughness of the construction surface, construction methods and construction environment.

After painting, please clean all construction tools in time. Remaining paint should be kept tightly closed. This product is stored in a cool, dry and ventilated place at 0-35℃, avoiding direct sunlight and low temperature freezing.