1. Subgrade excavation: including excavation, cleaning and transportation.
2. Filling: including filling and compaction.
3. Slope reinforcement: After subgrade filling, it is necessary to reinforce the slope to meet the design requirements and standards.
4. Drainage system: After the subgrade is filled, a drainage system is needed to drain the water in the subgrade.