Current location - Plastic Surgery and Aesthetics Network - Plastic surgery and medical aesthetics - Summary of personal work of road maintenance workers
Summary of personal work of road maintenance workers
Time is an arrow, it comes and goes in a hurry. A period of work has ended. Looking back on our work in the past, we have gained a lot. At this time, how can the most critical work summary fall! What are the characteristics of a good job summary? The following is my personal summary of the work of road maintenance workers for your reference, hoping to help friends in need.

Since the summary of personal work of road maintenance workers 1, under the correct leadership of the municipal bureau and municipal office, our work area has worked hard to implement the establishment of "Beijing-Hebei Smooth Road and Shangshan Avenue" on the principle of smoothness, neatness, green and beauty, and has done a lot of work in smoothness, cleanliness, safety, greening and beautification, which not only optimized and beautified the road, but also the road maintenance and road administration work in our work area in the past year.

First, strengthen the cleanliness and smoothness of the road surface and strengthen the standardized management of highway maintenance.

We always take the road surface cleaning and leveling as the focus of maintenance: First, the sweeper insists on cleaning twice a day, and individual road sections sweep with the dirt to keep the road surface clean and tidy all the year round; Second, strengthen minor repairs and maintenance, deal with pavement diseases in time to ensure safe and smooth driving; Third, strengthen daily supervision, deploy staff from offices and supervision offices to set up inspection teams, inspect all road sections at least three times a week, take the rate of road maintenance workers as the focus of supervision, issue supervision notices every month, and order existing problems to be rectified within a time limit. Economic penalties are given to road maintenance workers who do not attend work on time, which greatly improves the road rate. Fourth, when encountering centralized tasks such as water damage, greening and garbage removal. Temporary integration of maintenance forces, unified dispatching and concentrated assault have kept the roads clean, safe and smooth all the year round.

Second, do a good job in greening and beautifying, and enhance the image of highways.

Taking the opportunity of welcoming the national and provincial inspections, our work area always takes the greening and beautification of 107 National Highway and Beijing-Kunming Expressway as one of the key points, and makes great efforts to do a good job. In accordance with the requirements of economy, beauty and harmony, with the aim of improving the overall road environment and increasing the diversity and three-dimensional sense of road plants, the greening and replanting of 25.965 kilometers of 107 line is the top priority, carefully organized and seriously implemented. The general principle is to leave no gaps in trees, irrigation and flowers, and strengthen management and protection to achieve the best results. Specific measures: First, fill Amorpha fruticosa from one row to three rows on the inner slope to realize green full coverage on the slope; Second, the cypress trees on the greening platform should be replenished every 25 meters. Three, Berberis purpurea, Ligustrum lucidum, Zinnia, etc. In the greening platform, based on the pattern of "tofu block", one plant is needed to make up one plant, and flowers such as hibiscus and hollyhock are planted. Abelmoschus manihot will be pruned twice a year to achieve the best greening and beautification effect. The weather before the flood season is the hottest and driest time of the year, so timely watering is very important to ensure survival. Four waterwheels were dispatched to continuously water the greening. By June 5th, row 107 had replanted 160000 Berberis purpurea, 186 Sabina vulgaris, 200000 Amorpha fruticosa, 10000 Ligustrum lucidum and 50000 Chinese rose, and planted 365438+ hibiscus. The afforested national highway 107 is an ecological road, and it is also a lush landscape road with flowers and shrubs alternating, willow shining, overlapping layers and rhymes. In addition, we will do a good job in the greening and replanting of the connecting line of Beijing-Kunming Expressway in Xu Shui, and complete the replanting of 2,795 French phoenix trees, 0/50 Chinese pine trees, 0/86 Chinese cypress trees, 0/42 peach trees, 0.3 million Amorpha fruticosa trees and 40,000 Ligustrum lucidum trees.

Third, implement new technology for the first time to deal with pavement diseases mechanically to ensure safe and smooth roads.

From May 29th to June 27th, the pavement disease treatment works of 25.956km of Xu Shui section of 107 line and Xushui to Dawangdian section of Jinbao North Line 10km were completely completed. The Xu Shui section of 107 line was rebuilt in 1997- 1998, which has reached the overhaul period and extended its service, resulting in serious pavement cracking, network cracking and subsidence in some sections, and a large damaged area of the pavement, which has brought certain security risks to highway traffic. This year is the national inspection year, and the 107 line is an important inspection route. According to the unified deployment of the whole city, the high standard treatment of pavement diseases in Xu Shui section of 107 line was organized and implemented. In order to achieve high standard, rapid construction and maximum work efficiency, a feasible construction scheme is formulated to achieve good results of safety, civilization, high quality and high efficiency. Firstly, the old road surface is milled with the Wirtgen brand w 1900-c cold milling machine made in Germany. This machine can be used for milling and planing the two-meter wide pavement structure layer at one time. Good traction, strong walking drive and high milling ability ensure the high efficiency of this machine and the controllability of damage depth. For xx square meters of pavement diseases, it can be milled in less than one day, and the bottom surface of the milled road groove is flat and smooth. The same quantity, manual digging and patching, takes a week to complete, and the quality is difficult to guarantee. The large-scale material conveying system of this machine can make the ground materials be quickly and reliably conveyed to the material conveying vehicle and directly transported away.

The second is to take measures at the construction site to minimize the impact of engineering construction on road traffic. Specific measures: Close the construction section in strict accordance with the traffic diversion scheme, arrange special personnel to be responsible for the on-site safety diversion, set up safety signs and put reflective sign piers in strict accordance with regulations; Thirdly, assign a special person to clean up the asphalt residue on the milling and planing site at any time, and blow the sand in the groove with a high-power blower, so as to facilitate the close combination of old and new roads and reduce the discomfort of floating dust to passers-by; Fourthly, spray emulsified asphalt as adhesive oil in time, which is beneficial to the close combination of old and new pavements and the close connection of pavement work. By digging, filling, rolling and releasing. Fifth, when milling and planing, joints such as starting point, end point and bridge head should be connected smoothly to reduce the discomfort caused by construction to passing vehicles.

During the construction process, the leaders of municipal departments inspected and guided the work many times, and all the construction workers in the work area gave up holidays. They leave before dawn at 5 o'clock every morning and call it a day without a rest at noon. Working more than ten hours a day in the scorching sun and hot summer. Through the unremitting efforts of all cadres and workers, we have overcome all difficulties, carried forward the spirit of fearlessness, selfless dedication and hard struggle, and completed the construction task with high quality and high standard. 6736. 107 line has been excavated, and the section from Xushui to Dawangdian of Jinbao North Line is 5587 square meters.

Fourth, strengthen road administration and protect road rights.

Since the beginning of this year, we have strengthened road administration, focused on centralized and standardized management of plane intersections and non-traffic signs of National Highway 107 and Jinbao North Line, and resolutely put an end to unauthorized occupation of roads. In the governance of grade crossing, the principle that private individuals should bear the burden and public welfare should be borne by the work area should be adopted. At the same time, 15 non-traffic signs are comprehensively treated at the intersection, so that the completion rate of non-traffic signs reaches 100%.

Over the past year, road administration departments have collected compensation for road damage claims of RMB178,840, and road damage cases have occurred 148, and cases have been investigated 148, with a settlement rate of 100%. 97 non-traffic signs were cleared, 87 road boundary garbage and sundries were cleared, and 56,500 cubic meters of materials were piled up. 44 notices of the county government on optimizing the road environment and protecting road property rights according to law were posted at the intersections of major villages within the jurisdiction, and propaganda vehicles 16 were dispatched, and 900 road publicity leaflets and contact cards for reporting cases were issued.

Five, actively cooperate with the county government to carry out joint overload control work.

The county government attaches great importance to the joint overload control work, and took the lead in setting up the "xushui county Leading Group for Controlling Illegal Overloading of Vehicles", with Huo, the deputy county magistrate, as the team leader, responsible for the unified coordination and dispatch of overload control work in the county. Actively coordinate the relevant overload control member units (government office, supervision bureau, maintenance work area, transportation bureau, public security bureau, safety supervision bureau, industrial and commercial bureau, quality supervision bureau, development and reform bureau, court, procuratorate and other departments), and the county magistrate in charge will call the heads of overload control member units to hold regular meetings every month to collectively study and solve difficult problems in overload control work, and hold several overload control dispatching meetings, thus truly becoming the engine supporters of overload control work. The specific approach is:

(1) The relevant member units of the joint overload control will select elite soldiers to enrich the joint overload control team. In view of the new situation and new problems in the overload control work, coordinate the comrades of the county commission for discipline inspection to stay at the overload control detection station and strengthen supervision.

(2) Strict system ensures the smooth progress of overload control.

First of all, strengthen the law enforcement awareness education for the staff of overload detection station, improve their understanding and correct their ideological style; Require overload control personnel to have relatives engaged in the transportation industry, should take the initiative to transfer from overload control jobs.

The second is to establish and improve a series of work systems such as attendance, supervision, case handling, duty, data reporting, use of overloaded vehicles, punishment of overloaded vehicles, and work assessment, so as to make the overload control work more standardized and orderly.

Thirdly, in order to make our daily affairs regular, we insist on holding a short regular meeting every morning during the shift change to exchange experiences on new problems in our work and improve our work in time. Praise the outstanding performance in overload control, and report it to the joint overload control leading group as the object of assessment and reuse of each member unit. The working documents of overload control shall be filed in time and kept by special personnel.

Four, resolutely crack down on drivers, violent offenders and obstructing law enforcement personnel, resolutely crack down on drivers, violent offenders and obstructing law enforcement personnel in the overload control work, and never collude with illegal elements. After finding out the relevant situation of "Chetuo", the public security organs severely cracked down on the behavior of "Chetuo" forcibly breaking through customs and violently resisting the law according to law, effectively deterring the arrogance of criminals.

The fifth is strict discipline. For the overload control staff to provide overload control information for illegal car owners, those who violate the discipline slightly will be transferred from the road law enforcement team, and those who violate the discipline seriously will be given disciplinary sanctions after research. It is strictly forbidden to carry mobile phones in overload control work; It is forbidden for overload control personnel to drink alcohol.

(3) Give full play to the advantages of mobile overload control and increase the intensity of road joint overload control.

Xushui county County, which is adjacent to Baoding City, has national highways, provincial highways, county roads and other trunk roads extending in all directions, which is difficult to control. In order to effectively crack down on all kinds of tricks of overloaded car owners, we have intensified joint road overload control efforts, actively carried out joint overload control work, brought into play the advantages of motor overload control, controlled two law enforcement squadrons at overload control detection stations, adopted a two-shift system, and conducted 24-hour all-weather inspections on major trunk roads. Fully explore the inspection methods of fixed inspection and mobile inspection, and try to stop malicious overloading of transport vehicles.

Over the past year, through these effective measures, the overloaded vehicles in our county have been effectively curbed. * * * The meter detected 159 1 overloaded vehicles, and the source advised to return 5 17 vehicles, unloading more than 20,626.2 tons, and fined 2214,700 yuan.

Six, strengthen the responsibility to ensure the safety of the bridge.

National Highway 1 07 9 bridges and culverts over 5 meters, 4 Jinbao North Line, and Beijing-Kunming Expressway connecting line1block. In order to ensure the safety and smoothness of highway bridges and eliminate the hidden dangers of bridge safety accidents, firstly, we should be diligent in management and inspection at ordinary times and adhere to the working method of combining daily inspection with regular inspection; The second is to implement the bridge engineer responsibility system, sign the responsibility letter, and implement the "one bridge, one emergency management and protection plan", so that the responsibility will be assigned to people. Find out the number of bridges and culverts, make inspection records, handle problems in time when found, ensure the bridge is in good condition, eliminate hidden dangers of accidents and ensure traffic safety. Over the years, there has never been a traffic accident caused by bridge safety.

Seven, strengthen the "love station" function, convenient to serve the masses.

Adhering to the concept of "managing highways by service", our work area has set up a "Love Post Station" at the National Highway 107 Jingtangpu Maintenance Center to continuously expand its service functions. Vigorously carry out activities to facilitate the people and the people, equipped with first-aid kits, repair boxes, pumps, heat preservation barrels, fire extinguishers and other convenience tools and medicines, and provide temporary rest, traffic consultation and other services to provide convenience for passing drivers and pedestrians free of charge. Set up a telephone number for reporting road complaints at an appropriate position along the highway to facilitate the reporting and rescue of passing vehicles. During the daily patrol, the road law enforcement vehicle carries a toolbox and a medicine box to help the passing drivers and the masses, and to help the drivers and the masses who encounter difficulties. Over the past year, * * * has carried out various kinds of assistance 17 times.

Eight, increase the intensity of information publicity and reporting.

Over the past year, * * * submitted more than 30 pieces of information to the municipal bureau and office, and 2 pieces were adopted, including 5 pieces of Hebei Legal Newspaper, 2 pieces of Baoding Evening News, 4 pieces of Hebei Communications, 2 pieces of Baoding Daily and 3 pieces of information platform of Municipal Highway Bureau. Baoding TV Station's "Traffic Horizon" column reported the work of our work area for 9 times; Brief report on Xu Shui highway management in our work area 1 1.

Over the past year, although a lot of work has been done and some achievements have been made, there is still a big gap between the requirements of the leaders of the municipal bureau and the municipal departments, and there is still a certain gap compared with the brother units. In the future, we will continue to sum up experience, actively learn from our brother units, further deepen the service consciousness of "civilized service, safety and smoothness", and strive to create more work highlights, so that the road maintenance work will reach a new level.

Summary of personal work of road maintenance workers 2 This year is the national inspection year of the transportation system. Under the leadership and guidance of the Municipal Highway Administration Bureau, our work area strives to build the brand of "xxxx" highway, carries out in-depth activities of striving for excellence, takes safety production as the basic point, pays attention to the word "reality", always combines the actual work, innovates the carrier, enriches the content, and actively guides the broad masses of cadres and workers to make contributions and strive for first-class in practical work, so as to smoothly advance the highway maintenance work.

First of all, the quality of minor repairs is very good.

In order to ensure the safety and smoothness of the highway, this spring, our work area invested 479,000 yuan to repair and maintain the potholes and looseness of Baojing Line and Lirong Line under its jurisdiction, and completed the engineering quantity of 7 194 square meters.

In the excavation construction, the construction team pays attention to safety, quality, promotion and beauty to ensure the high-quality and efficient completion of the project. First, strengthen safety measures in construction, improve employees' safety awareness, set up safety warning signs at the construction site, and park construction vehicles in an orderly manner. Insist on digging and filling at the same time, fill the groove on the same day, and eliminate the hidden danger of driving safety. The second is to adhere to the three standards of "timely, in place and thorough". The repaired surface layer must be repaired, and the treated base layer must be treated. Use the cutting machine to slot, and the measuring, inspection and digging and repairing personnel shall operate in strict accordance with the technical specifications, handle problems in time when they are found, and resolutely put an end to quality hidden dangers. The third is to strengthen overall planning and coordination, improve work efficiency, put an end to slowdown to the maximum extent, save construction time as much as possible, concentrate manpower and machinery, work overtime and speed up construction progress. After slotting, the waste is cleaned quickly, and the slotting is flat and dense, which is the same height as the road surface, achieving the effect of excellent internal and external quality. All the projects have passed the technical inspection, and all of them have reached the high-quality standards, and the first shot of building the brand of "Shangshan Avenue" has been fired.

Second, pour love to create a beautiful road.

The xx connecting line of Baojin Expressway in our work area is the main road from Beijing and Tianjin to Baiyangdian, a national 5a scenic spot, and also the window section of Baoding traffic. In order to show the traffic image and boost the development of xx tourism economy, xx work area has increased investment and devoted itself to creating beautiful sections. Comprehensively improve the grade of highway greening and beautification. Based on the principle of early arrangement, early construction and early implementation, the work area concentrates manpower and material resources on spring sowing. This spring, * * * replanted 700 trees, 3 1 000 shrubs, 0/000 Ligustrum lucidum, 20,000 roses, 60,000 red roses, and * * * planted flowers 1 .25 million square meters. At the same time, strengthen greening management and comprehensive management of all-round travel fertilization, irrigation, pruning and plastic surgery, pest control and so on. And visually form a lush, clean and standardized garden-style highway green belt, which has become a model section for greening and beautifying Baojing Line and Lirong Line.

Third, road maintenance has once again achieved great success.

At the end of April, it was reported that the national inspection would arrive in our city in late May, and the call of the national inspection made the work area boil. The leading group of the work area decided that although the Liyang section of our work area does not contain the national highway, the national inspection is a major event in the transportation system after all, and it is necessary to take the national inspection as an opportunity to thoroughly rectify the sections under its jurisdiction and upgrade the highway grade. As a result, a plan of "three battles started one after another, and the hardcover was carefully decorated to illuminate the road" came into being.

The first battle was road cleaning. Mazhuang and Dawang Maintenance Center acted in unison, and arranged personnel and vehicles to suddenly clean up the garbage and sundries on the village roads. Around the side ditch and the convenient cleaning pool in expressway, people loaded cars and transported a busy scene, cleaning 49 kilometers of shoulder slopes, 39 kilometers of drainage ditches and 29,000 cubic meters of garbage and sundries.

The second battle is weed control. Pruned shrubs, because of their fast growth and oblique branches and leaves, affect the ornamental effect. The two conservation centers acted separately, and three hedge trimmers worked separately to cut hair and trim eyebrows for all shrubs, showing a bright new makeup.

Weeding is also a heavy task, and maintenance workers take effective measures according to the actual situation. For the weeds in the flower pond, the method of repeated weeding is used to "eliminate all evils", while the weeds in the slope and forest are treated with drugs. Road maintenance workers carry sprayers on their backs, drill grass in ditches, risk mosquito bites and work hard. They used up more than 200 bottles of herbicides such as glyphosate and sprayed them for 32 kilometers.

The third battle is to dress up the road. In Liyang section, road maintenance workers dress up like a girl to be married: red and white markings and zebra crossings are neatly and vividly drawn. Paint retaining walls, garbage pools, culverts, etc. All dressed in new clothes of "standard color". * * * 40 kilometers of subgrade improvement, 25 kilometers of ditches dredging and 6 kilometers of streets and lanes improvement, all reaching the standard of standardized road sections. In improving highway facilities, 60 milestones, 540100m piles and 260 warning piles were replaced. Renovation 18 road culture publicity plaque, writing 23 publicity slogans. A series of practical work has further improved the safety factor of highway traffic and made the highway look brand-new.

Fourth, safety production is always unremitting.

Safety production is the top priority of all work, and the work area institutionalizes, makes responsibility and normalizes safety production, so that safety production runs through all work.

The work area has set up a safety production leading group headed by the top leader, which puts safety production on the important work agenda and pays special attention to the implementation of various safety production systems. In the hidden danger investigation, we should insist on monthly investigation and weekly inspection, find all kinds of hidden dangers in roads, bridges, ancillary facilities, offices and construction sites in time, register and sort out the investigation results, and formulate control measures in time. In the work of managing potential safety hazards, it is necessary to put the responsibility on people, complete it within a limited time, set standards and improve it item by item. Strengthen the safety management of the construction site and its vehicles, equipment, materials and operators, and strictly operate the rules to prevent the occurrence of "three violations". Strengthen the construction of emergency rescue system, improve emergency plans for flood control, earthquake prevention, fire prevention and other disasters, and carry out imaginary sudden danger drills, which have improved the safety awareness and practical coping ability of all cadres and workers.

Five, the joint air closure project won the flag for the star.

Pavement joint filling is a special project of our work area engineering team. In this year's competition for excellence, the engineering team is determined to win the flag in three aspects: safety in production, engineering quality and construction progress.

The construction team made three preparations before leaving: First, they were equipped with safety signs and were willing to spend money on safety. Spent 1XX yuan to buy safety facilities such as safety cones and solar reflective signs. Second, the maintenance of equipment, all construction machinery has undergone careful maintenance and testing, so that all equipment has reached a qualified working state. Third, safety training. The leaders of the work area have repeatedly urged the project team leader to put safety first, and invited professionals to give employees safety production lessons to improve their safety awareness and proficiency in operation skills. The three rings are interlocking to ensure safe production.

Although the joint filling operation is the specialty of the engineering team, it is never sloppy in the operation and always pays attention to the engineering quality. In strict accordance with the technical requirements, the three processes of joint expansion, joint cleaning and joint filling are strictly controlled. The overall goal is to ensure quality, stand the test and stand the test of time, and win universal praise from users.

In order to meet the national inspection, the engineering team went all out to grasp the construction progress. Efforts will be made to overcome the unfavorable factors such as tight time, heavy task of ensuring smoothness and great construction interference, and strive to ensure the progress of pavement joint filling project. The constructors are not afraid of hardship and fatigue, and have successively completed the work tasks of Zhuo Lang, Dingyi, 1 12 national highways by means of shifting shifts and increasing working hours. At present, the total engineering quantity has reached 2 1 10,000 linear meters.

Sixth, strictly improve the highway environment.

1, mobile overload, do their job.

According to the actual situation that the traffic volume of trucks in Liyang section of our work area is relatively small, the road administration brigade has always taken the way of mobile overload control and earnestly performed its duties. In addition to the encryption and refinement of highway inspections to crack down on illegal transportation, after the video and telephone conference of the province's overload control in April, the law enforcement brigade in xx work area took the way of checking cars at night, effectively cracking down on and curbing overloaded and overloaded transportation, which was called "dead of night action" by the law enforcement brigade. This action is very effective and "rewarding". * * * 572 vehicles suspected of exceeding the limit were inspected, and all 27 vehicles seized were handled according to the regulations.

2, administration according to law, safeguard the right of way.

According to the highway law, the law enforcement brigade can nail road boundary markers, divide road boundaries, clarify the legal scope of roads, and resolutely stop violations of road property rights, which constitutes a case handled according to law. Since the beginning of this year, * * * has put on record eight cases of damaging highway facilities, all of which have been closed.

3. Special rectification of non-traffic signs

According to the superior deployment, the road administration brigade of the work area carried out a four-month special rectification of non-traffic signs in expressway. The special action is divided into three stages: publicity and education, investigation and investigation, and cleaning and rectification. The first stage of publicity was put in place, which made highway laws and regulations deeply rooted in the hearts of the people, and enabled the vast number of businesses and enterprises along the highway to know and abide by the law and actively cooperate with the special governance work. In the second stage, find out the base number, thoroughly inspect all off-highway signs and signs in the road sections under the jurisdiction of the work area, check, register and notify the setting unit to make rectification within a time limit. In the third stage, all off-road signs set by any unit or individual will be cleaned up and rectified. This action * * * cancelled 152 non-traffic signs, completely standardized road signs, and achieved satisfactory results.

4, patrol duty, to ensure smooth.

In order to ensure smooth roads, the law enforcement brigade adopts a combination of patrol and duty to ensure smooth roads. The work area, in coordination with the Industrial and Commercial Bureau and relevant towns and villages, stopped the street stall at 102 by combining persuasion, education and administration according to law; Cancel the unauthorized construction of 13; During the three summers, more than 200 people were stopped from occupying roads to dry grain. In order to consolidate the achievements and prevent the rebound, the law enforcement brigade encrypted day and night inspections and set up posts on duty in important sections, effectively ensuring the safe and smooth flow of roads.

Seven, intensive internal standard management.

"Refine the internal industry and ensure high-level management with standardized, solid and meticulous work" is the work requirement put forward by the leading group of the work area at the maintenance work meeting at the beginning of the year.

Since the beginning of this year, according to the principle of "unification, standardization, precision and accuracy", the industry personnel have comprehensively sorted out the data and various charts of highway maintenance. Check carefully and repeatedly, and strive to achieve zero errors. The leaders of the work area personally revised all the management systems. Proceed from reality, get rid of the rough and the fine, get rid of the false and keep the true, and strive to be practical. All kinds of charts are beautifully made and posted on the wall, neat and standardized, and clear at a glance. Handwritten charts and data are all changed into machine-printed color pages, and all kinds of files are neatly bound and classified and kept in a standardized way.

In the work area, the work of recording, sorting, reporting and filing of work supervision and inspection was particularly strengthened, and the rewards and punishments of work inspection results were announced in the briefing of xx work area every month, which greatly promoted the progress of all work in the work area.

Under the leadership of the Municipal Highway Administration Bureau, the cadres and workers in xx work area are not satisfied with the achievements they have made, and are determined to make persistent efforts to build a highway brand of "Gyeonggi Road on the Road".