Summary of Greening Day 1
In order to create a clean, tidy and beautiful learning and living environment for teachers and students, we have always atta
Summary of Greening Day 1
In order to create a clean, tidy and beautiful learning and living environment for teachers and students, we have always attached great importance to the construction of campus environment, emphasized the importance of "environmental education" and comprehensively carried out greening and beautification.
We have mainly done the following greening and beautification work:
1, do a good job in sanitation, purify the campus environment, implement and strengthen the cleaning and inspection system, regularly clean the sanitation area every day and keep it clean at any time, so that the indoor and outdoor floors are clean and tidy, without phlegm, waste paper, cigarette butts, peels and other sundries; There are no cobwebs on walls, corners and ceilings, and there are no dust, mud, sputum stains and garbage on school doors, windows, tables, chairs and steps. School garbage is cleaned up every day, and the garbage bins are clean in appearance, with no exposed garbage and no sanitary corner.
2. The green places such as the school gate and the back of the teaching building have been turned over and transplanted. Clean up the weeds that affect beautification, and remove the litter that affects campus greening in time.
3. While strengthening campus greening and beautification, take care of flowers and trees. In order to further manage the existing trees in the school, the school arranges regular watering and fertilization, carefully prunes the flowers and trees on campus, and timely sprays drugs to prevent pests and diseases.
4. Doors, famous sayings and epigrams, related responsibilities, systems, timetables and timetables are hung on the walls of every room in the school. There are several pots of flowers neatly placed on the windowsill of each room. 3. The contents of the kitchen window in the school corridor are beautiful and generous. The blackboard column is updated regularly every month, and the learning garden in the classroom is updated once every half semester.
4. The school has established a safety work responsibility system and a safety work plan, and regularly carries out special safety education, requiring all teachers to infiltrate safety education into daily teaching work.
The school conducts regular safety drills. Campus, school buildings, drinking water, electricity, sports equipment, audio-visual equipment and other equipment and facilities do not have potential safety hazards.
In campus beautification and greening, we adhere to the principle of "pursuing high grade, paying attention to practicality, being scientific and standardized, being reasonable and efficient", basing ourselves on reality and highlighting characteristics, so as to make the campus image more beautiful, the campus environment better and the campus taste higher. Let teachers and students study and work healthily and happily in a good environment.
Summary of greening day II
20xx is the year when the Bureau of Landscape Architecture was founded. As the main force of landscaping management, the supervision department has undertaken more and more heavy management tasks. The work completed in the past year is summarized as follows:
I. Daily supervision and management:
Since the establishment of the park, in order to better protect the greening achievements from being destroyed, the supervisory team members have strengthened inspections and dealt with problems in time. In the whole year, they were compensated for their greening losses of more than 430,000 yuan, and the incidents of greening damage were greatly reduced.
Two. Administrative examination and approval:
In the case of heavy tasks, the examination and approval work has never stopped. Since 1 month, * * has received 3 pieces of approval documents (including 4 pieces for commencement acceptance, 0/3 pieces for completion acceptance and 0/4 pieces for pruning and transplanting), so that each piece can be reviewed and filed. Handle relevant approval documents in time according to the approval process, and complete each approval document with the fastest speed and high quality according to the process. Resolutely put an end to the phenomenon that every supervisor eats, takes, gets stuck and wants, and won the praise of the management object.
Three, the bureau center work:
1. Project construction: Due to the sharp increase of construction tasks, the supervision department also participated in the construction management of some greening projects, and basically completed various projects with high quality and high standards.
2. Creating a garden: In this year's acceptance of creating a garden, the management of various construction units, communities and other units on the inspection line has been strengthened, which has well cooperated with the acceptance of creating a garden.
3. Power pruning: The power pruning twice a year is independently and safely completed by the regulatory authorities and does not involve the energy of other departments.
4. Poverty alleviation work: Two staff members of this department participated in poverty alleviation work, and the whole department cooperated vigorously in purchasing materials, office supplies and expense reimbursement.
5. Park management: The regulatory authorities strengthen management in park management, and prohibit vendors from entering the park during the establishment and sanitation of the park to create a good park environment.
Fourth, shortcomings:
The biggest deficiency of undergraduate course is that the subject is not strong. Although the tasks of this year have been completed, there is still a gap in the requirements of the leaders of the bureau.
Verb (abbreviation of verb) summary:
In the future, the undergraduate department will strengthen external supervision and management, strengthen internal discipline management, and complete next year's work tasks with higher work efficiency.
Summary of greening day work 3
Time flies and 20 years are coming to an end. In the past year, under the care and guidance of leaders and colleagues, through our unremitting efforts, we have made necessary achievements in our work, but there are also many shortcomings.
Looking back on the past year, the work is summarized as follows:
1.20 During the first three quarters, according to the decision-making and guidance of the group company and with the unremitting efforts of all the staff, we went out early and came back late, at the expense of rest time, planting nearly 70,000 seedlings, with a survival rate of about 80% at that time. However, due to lack of experience and understanding of the environment and water sources, personality is a water source problem, and the salt content of groundwater seriously exceeds the standard, which leads to the drought death of trees without irrigation. After irrigation, the high salt content of water leads to the physiological water shortage of trees, and the consequences are more serious, among which the large-scale death of forsythia suspensa is typical. Fortunately, the leaders of the group company immediately chose a new base with better soil water source and transplanted all the remaining seedlings to the new nursery, which reduced the loss.
Second, in the last quarter of 20- 2008, although the time was short, our work was the busiest.
1. Construction, use and maintenance of infrastructure of newly selected Shuangyang base. When we first took over the new base, it was a wasteland. Under the unified command of the group company, through our efforts, we have completed the construction of precast road160m and enclosure1500m, built two temporary board houses, laid water supply and irrigation pipes1300m, and laid 80kv transformers to make the foundation surface.
The appearance has been greatly improved, and all facilities have been put into use.
2. Seize the season. In order to achieve the land utilization rate, the planned sowing of 80 mu of winter wheat was completed before 10 X, and frozen water was immediately poured artificially.
3. The trees in the original nursery were successfully transplanted to the new base. Under the unified scheduling of the Group and with the assistance of all colleagues in the company, more than 20 trees of 1 were successfully transplanted to the new base, and manpower was immediately organized for irrigation, which has been completed at present. In order to ensure the survival of seedlings, the next step will be to organize artificial soil cultivation and root protection.
In the next 20 years, we will make the following plans according to the guiding ideology of the group leaders and our existing actual situation:
First, use the free time at the end of this moment to contact and visit the nurseries in the surrounding counties and cities, and initially grasp the general situation and price of large-scale seedling planting. Pave the way for buying suitable seedlings immediately next year.
Second, make a preliminary plan for planting seedling varieties on the reserved land. According to the current trend of urban greening and the specific geographical environment of Weifang, we initially intend to purchase the following seedlings:
Trees: Magnolia grandiflora, Fraxinus chinensis, Persimmon, Ligustrum lucidum, Ginkgo biloba, Fraxinus chinensis, Sakura, Begonia series, Hibiscus.
Shrubs: heather, forsythia, holly, zinnia, purple leaf, purple leaf plum, mahogany.
Lianas: Zanthoxylum bungeanum
Time has given me another chance to sum up, and every progress is promoted by repeatedly summing up experience or gains and losses. Every summary reminds us to find out if we are not.
At the same time, combined with my good work experience, I will lay a better foundation for the smooth development of the new round of work. In the future, I will work harder, strive to constantly improve the level of business technology, and carefully complete the tasks assigned by the group company.
Summary of greening day work 4
I am a green chemical engineer of Green Landscape Architecture Engineering Co., Ltd. Since this year, under the correct leadership of the municipal party committee and the municipal government, our company has continuously strengthened management in this year's greening maintenance management, vigorously improved the level of project construction and maintenance management, and further improved the landscape effect of greening projects.
Greening seems simple, but it is not easy. Planting flowers and trees all year round, pruning and weeding, watering and fertilizing are complicated and time-consuming. All work should be down-to-earth and pioneering.
First, tap internal potential, give full play to professional advantages and improve management level.
In recent years, my company has bid for several large and small projects, among which I am the project manager of -x greening project. In the management of greening projects, while strictly following policies and regulations, industry norms and greening contracts of affiliated projects, I pay attention to accumulating a large number of first-hand information, accurately discovering existing problems and properly solving them in the first time. All-round to bring intuitive basis for greening projects, and strive to do a good job of technical support, for the city's landscaping maintenance level and my unit's greening project management to a new level. In terms of safety production, I put the responsibility into the hands of every specific practitioner, and formulated operating procedures such as greening maintenance, garden equipment and pesticide use management. And held a safety production meeting to eliminate potential safety hazards to the maximum extent and ensure the safety of employees and property.
Two, based on their own work, and constantly give play to the advantages of landscape architecture.
In the past 20- 20 years, I have given full play to my professional advantages, paid close attention to related greening projects, and participated in the compilation of various garden technical specifications and garden activities in our city. Improve the quality of the project. In the construction of the project, we should analyze the specific situation, adjust measures to local conditions, and combine our years of work experience to improve the landscape quality of public green space, rather than building it just to complete the task and bring good rest space to the citizens.
Three, to ensure the greening achievements, and vigorously do a good job in greening maintenance management.
The maintenance and management of greening is the long-term tending and management of garden plants after the project construction. The supervision of maintenance management should grasp the characteristics of the maintenance object and find the most effective way, method and effect. We should pay attention to the results and establish a dynamic, healthy and good monitoring system. And gradually and reasonably prepare the special fund plan, so that the input and output constitute a virtuous circle.
In the maintenance work, we should also distinguish between construction and management. Greening engineering construction usually has the following characteristics:
1, single. For example, after planting a tree, digging a hole, returning the soil, righting and putting on a protective frame only complete the planting of a single tree, and it is no longer necessary to repeat it many times.
2. Process fixity. That is, in the process of greening project, the order of each working procedure is basically fixed, and there is no special situation and no big change.
3. Time limit. In other words, engineering construction generally needs to be completed within the necessary time limit, which has the necessary urgency.
Greening maintenance management is different from greening engineering construction, and accordingly has the following characteristics:
(1) Repeatability and persistence. For example, in a growing season, trees should be pruned many times in a reasonable time according to the growth status of plants; Spraying drugs at any time according to the occurrence and laws of pests and diseases, so a lot of work is often repeated in the maintenance of specific greening projects.
(2) The process is not fixed. The development of greening project management is usually easily influenced by many factors, such as temperature, rainfall and disastrous weather. There is plenty of rain, and it is likely that watering will not be needed for two months, but the increase of plant growth will increase the workload of pruning. Therefore, what needs to be done every day needs to be adjusted at any time according to the actual situation, and manpower and material resources should be arranged reasonably to meet the needs of plant growth, which is relatively mobile.
(3) seasonal. Protection and management work mainly changes with the seasons. Usually it takes one year as the cycle, such as pruning trees in winter for plastic pruning; During the growing season, dead branches and broken branches should be cleaned and trimmed in time; When sprouting occurs, it is necessary to carry out nutritional pruning to remove sprouting. The time limit is not very strict, as long as it conforms to its growth law and can promote the healthy growth of plants.
Therefore, the supervision of maintenance management should be different from the supervision of construction projects, grasp its own characteristics, find effective control points, find the most suitable working methods, make the supervision process orderly, reasonable and operable, and promote the development of the industry.
Combined with the specific operation and engineering maintenance work of my unit, I found that the climate was warmer last winter and this spring, and I have many years of experience. If I don't do a good job in pest control, pests and diseases are likely to break out on a large scale in early summer. I organized the relevant personnel of the unit to carry out comprehensive and universal pest control. At the same time, the green seedlings were comprehensively pruned and pruned. It can eliminate weeds in the green space and block the overwintering route of pests to the maximum extent. The lawn, trees and shrubs were comprehensively fertilized to ensure safe wintering, and the contracted projects were fully supplemented.
In the actual maintenance work, I make great efforts to ensure the survival rate, achieve the ideal landscape quality in the shortest time, and improve the greening environmental quality and engineering landscape effect.
Due to the timely greening management measures, the quality of greening projects has been effectively guaranteed and gratifying achievements have been made.
Fourth, seize the opportunity and strive to achieve a new breakthrough in landscape architecture.
In recent years, the pace of building a harmonious national health city will be further accelerated, and the work of building a garden city is also in full swing. In the greening work, we should cheer up the spirit, seize the opportunity, strive to create conditions, solve problems, seek development, decompose and formulate feasible secondary goals according to specific requirements, do a good job in all aspects, and intensify the creation and maintenance work. Establish a more standardized and benign landscaping supervision order, improve the working procedures, and achieve orderly management, openness, and people-oriented. At the same time, combined with the typical administrative norms of relevant cities, formulate management methods suitable for our unit. Strengthen the training of all kinds of personnel, improve the professional quality of staff, strengthen business learning and improve the knowledge structure. Participate in the garden industry training activities organized by-City Garden Association and-City Garden Administration Bureau to improve their comprehensive quality and professional level, thus fundamentally improving the level of management and maintenance and reducing the cost of management and maintenance.
In the future work, I will strive to innovate on the existing professional and technical level, absorb advanced experience while giving play to my own advantages, and give play to my own light and heat for the development of landscaping.
Chapter 5 Summary of Greening Day Work
20xx On May 29th, Xibao Town Central School sorted out the summary of the phased work of "Campus Greening and Beautifying" in Xibao Town Central School. On May 28th, Xibao Town Central School organized 19 principals, kindergarten directors, heads of teaching points and members of the central school team to visit and study in all primary and secondary schools, kindergartens and teaching points in the town. In the afternoon, Xibao School listened to the feelings of President Yang, a central school who visited and studied in Menyuan County, and watched it. Participants in this activity mainly visited the achievements of campus greening and beautification in our town and the creation of characteristic culture of corridors, which was actually the inspection and acceptance of the phased work of campus greening and beautification in primary and secondary schools in 20xx.
"A year's plan" lies in spring. Since the new semester, all primary and secondary schools in our town have taken "campus greening and beautification" as the key work of campus culture construction, and the central school has also set the working goal of "building excellent teaching points and creating a paradise for children to grow up". In the past two months, primary and secondary schools have taken many measures to carry out this work in a down-to-earth manner: Gejia School combined with the "National Studies Education" on-site activities in the county, and in the campus corridors and corridors, Xibao School re-planned the campus greening area, removed worn kerbs, expanded the greening area, and closed the Little Square between apartment buildings and the green belt to the west of the playground with wrought iron guardrails; In view of the small school space, Dongliangqi Primary School demolished and hardened the garden in front of the teaching building, and surrounded two green spaces with wrought iron fences on the east and west sides of the campus. In 20xx, the greening and beautification of Yang Juan school campus was basically completed. This semester, the school leveled the playground of the west campus, greening the surrounding teacher apartment buildings and the playground of the west campus. Wei Qing primary school mobilized teachers and students to plant all kinds of flowers and prune flower trees in the flower beds on campus; While greening and beautifying the campus, the school also afforested the offices and corridors. Up to now, Ge Jia, Dongliang Banner, Xibao, Yangpen and Wei Qing have placed a variety of large potted plants such as duckweed, Milan and African jasmine in offices and corridors, creating a warm and harmonious working and learning environment for teachers and students. While primary and secondary schools are carrying out campus greening and beautification, teachers and students in teaching points in mountainous areas are not far behind. Under the call of "building excellent teaching points and creating a paradise for children to grow up", the central school has taken on a new look. Li. The teaching point of Z kiln painted all the rooms, rebuilt the teacher's office, student canteen, activity room and audio-visual classroom by using idle school buildings, purchased toy cabinets, library and shoe cabinets, and laid carpets in the student activity room and dormitory. Floor leather was laid in the electric classroom and student canteen, a 16 cultural exhibition board was made, a 1 cultural wall was made, and a simple flower bed was built at the school gate. Qingshan Teaching School replaced the activity room carpet, purchased toy cabinets, bookshelves and shoe cabinets, and closed the green area with wrought iron fences, thus solving the problem of roof seepage. Yangjuangou teaching point has done slope protection on the west side of the playground, built a garden on the platform and transplanted flowers such as lilacs. Zuo Shu kindergarten mobilized teachers to draw many cartoon pictures inside and outside the campus, made cultural walls and garden training, built dance rooms and activity rooms, and purchased children's bedding in a unified way, which changed the overall appearance of the kindergarten. Xiliangqi Kindergarten repainted the dado of the new teaching building, and the sheepfold and Xiliangqi Kindergarten distributed all the amusement AIDS purchased last semester to teachers and students.
Summary of greening day work 6
Green the living environment and build a beautiful home! With our joint efforts, the greening environment of the community has achieved certain results. Here I summarize my work in the past six months as follows:
1. give priority to prevention and combine prevention with treatment.
Do a good job in the prevention and control of pests and diseases of trees and flowers. Timely and effective governance to reduce the impact of harm.
2. Trim, fertilize and water regularly.
Proper pruning of branches and leaves can reduce water evaporation and reduce the occurrence of pests and diseases; Proper fertilization is beneficial to the growth of flowers and trees. Spring and summer are the peak of flower growth. During this period, plants grow rapidly, their metabolism is vigorous, and they need more nutrients. Therefore, the "three-element" fertilizer, mainly nitrogen fertilizer, should be applied to make the root system developed and strong, enhance the absorption capacity and promote the growth of branches, so as to facilitate flowering and fruiting. After summer, if we continue to apply nitrogen fertilizer, it will be unfavorable to plant development and affect flowering and fruiting; Moreover, excessive application of nitrogen fertilizer is also easy to cause pests, or weaken the stems and leaves, and the color is not bright, so nitrogen fertilizer should be stopped before the plants enter the reproductive growth period (flower bud differentiation period); Proper watering is beneficial to the growth of plants, especially in summer, plants need to absorb a lot of water.
3. Pay attention to the protection and management of greening achievements.
As the saying goes: "Three-point planting and seven-point management, constantly consolidating the existing greening achievements, is the key to managing the greening work."
Greening is a long-term and arduous task and an important symbol of spiritual civilization construction. Although we have done some work in this regard, there is still a certain gap. We will continue to work hard to build garden club and a beautiful home!
Summary of Greening Day Work Chapter VII
Since 20xx, in accordance with the work arrangements and requirements of the "Green Action" of the county party committee and the county government, we have kept a close eye on the goal of creating a provincial garden city, carefully organized and strengthened leadership, and actively carried out all the work of creating a garden city in accordance with the relevant standards and requirements of provincial garden cities. The management of county landscaping has been further strengthened, and the effect and grade of urban greening landscape have been further improved, initially forming a pattern centered on square greening and park greening. With road greening as the skeleton, windbreak belt around the city as the barrier and courtyard greening as the support, the ecological greening environment pattern has improved the greening level, greatly improved the urban ecological environment, and achieved remarkable results in creating gardens. The summary of the work in 20xx and the working ideas in 20xx are reported as follows.
I. Main Work and Progress
(1) Reconstruction project of the core area of Nanping Mountain Forest Park. This year's construction work includes mountain greening and park greening landscape construction. The park covers an area of 87.3 hectares, with an annual planned construction area of 25,000 square meters and a planned investment of * * 10,000 yuan.
(2) Xianghe Landscape Belt Project. The total length of the project is 9.8km, including:
1, the road at the top of the outer ring dike in the urban section crosses (starting from Wang Ba and ending at s206 Xianghe Bridge), and the urban external traffic road greening construction is 9.292km, with an investment of * * billion yuan.
2. Construction of landscape belts, corridors and green spaces along the river, with a green building area of 30,000 square meters.
3. The construction project of lawn and green land on the top of the outer dike and the coastline, with a green area of 230,000 square meters.
(3) Greening project of development zone. The roadside trees and lateral zoning of Shitan Modern Industrial Park Road are mainly Xincheng Avenue, Planning Middle Road, Planning South Road, Wenhua Avenue (Conch Avenue to Xincheng Avenue) and Chuangye Avenue (Conch Avenue to Xincheng Avenue). The roadside trees and horizontal partitions of Weisan Road (east extension of Jingsan Road), Weisi Road (east extension of Jingsan Road) and Jason Wu Road (north extension of Weier Road) in the Development Zone are afforested, with a greening area of about 254,000 square meters.
(4) New road greening project. Complete the greening project of landscape promenade and pedestrian walkway on both sides of Chengnan Avenue, covering an area of about 240,000 square meters; Complete the greening and horizontal zoning of street trees on Zhandong Road, Zhannan Road, the west section of Inner Ring Road, Fucheng Road and Tang Chuan Road. And street tree greening projects in Naner, Nansan, Nanlin Road, Nanyi, Qin Gang and Wan Li Road; Complete the greening construction project of urban external traffic highway about 18.7 km from Quanjiao to Shenshan Temple to Mulongshan.
(five) the construction of a certain scale nursery, planting seedlings, flowers, bonsai, etc. The building area is 88,888,888 square meters, and the investment is * * * ten thousand yuan.
(six) the completion of community greening and street greening. For new commercial residential quarters, urge developers to organize greening in strict accordance with the planning and design; Carry out greening and greening of resettlement communities. The county garden establishment office is located in important nodes of streets, urban idle plots and messy plots, and 49 plots, with an area of about 55,000 square meters, are determined by * * *, and unified planning and design are carried out. Four leading bodies of the county and the units of the Standing Committee of the county party committee took the lead in claiming, and 45 units directly under the county government each included one piece.
(seven) earnestly implement the "County Greening Committee to recognize the implementation of green space" in Quanjiao County. The green area of 47 county-level units is about 654.38+10,000 square meters.
Second, the work initiatives
(1) Adjust an idea. Focusing on the strategic goal of building a strong economic and social county, taking "five cities to create together" as the starting point, aiming at the two major themes of ecological construction and ecological civilization, focusing on greening and taking key projects as the driving force, we will extensively carry out tree planting activities for the whole people, make green places green, and strive to create a whole pepper with harmonious development between man and nature.
(2) Implement the four systems. Namely:
(1) Establish a "green seal" system. Where the new construction, renovation and expansion of construction projects and construction units in the urban planning area of our county, before applying for the construction project planning permit, they shall, in accordance with the basic construction procedures, go to the county urban landscaping department to verify the planning scheme of their affiliated greening projects.
(2) Implement the market access system for greening construction.
(3) Establish the supervision system of greening construction.
(4) Establish a system for the completion and acceptance of greening projects.
(3) Comprehensively promote the market-oriented operation of landscaping maintenance. Introducing competition to make the operating mechanism more flexible; Establish a flexible and long-term management mechanism; Improve the efficiency of the use of protection funds.
(4) Standardize operation and do a good job in system construction. In order to make the landscaping construction in our county standardized and programmed step by step, the Interim Provisions on the Transfer of Municipal Works and Landscaping Works in Quanjiao County was drafted for the county government, and participated in the planning of urban green space system of 35 square kilometers in the main city.
I. Work results
1, solidly carry out scientific research and innovation in landscaping.
Carry out scientific research, solve technical problems in engineering construction, and organize the implementation of 26 scientific research projects of the State Forestry Administration, such as forestry public welfare industry scientific research projects, international advanced technology introduction, Beijing science and technology plan projects, and bureau youth science and technology projects. Organize the implementation of the central finance 17 forestry science and technology popularization demonstration fund project to improve the quality of engineering construction and the level of industrial development. Coordinate the appraisal and acceptance of scientific and technological achievements 1 1, declare Beijing Science and Technology Award 1, Beijing Agricultural Technology Promotion Award 3, Mao Yisheng Youth Science and Technology Award 1, and organize the evaluation of 23 Beijing Landscaping Science and Technology Awards.
2. Hold the Beijing Landscaping Science and Technology Innovation Conference with high standards.
Organized a conference on scientific and technological innovation of landscaping in Beijing, and issued the Action Plan for Scientific and Technological Innovation of Landscaping in Beijing and the Opinions on Accelerating Scientific and Technological Innovation of Landscaping in the Capital. At the same time, the conference awarded certificates to 90 experts of the innovation team, letters of appointment and medals to 8 innovative groups of Beijing landscaping, 17 Beijing Landscaping Science and Technology Innovation Demonstration Zone and 27 Beijing Landscaping Science Education Bases. This meeting is not only a summary of the scientific and technological achievements of landscaping, but also a clear deployment of the later tasks. This is a future-oriented science and technology mobilization meeting. The convening of this meeting will further clarify the development direction of scientific and technological innovation in landscaping, further promote the implementation and implementation of the action plan for scientific and technological innovation in landscaping, and better serve the construction of ecological civilization in the capital and beautiful Beijing.
3. Successfully held the activity of "Green Technology, Colorful Life-Science and Technology Innovation and Popular Science Month of Landscaping".
The activity month mainly consists of four activity weeks: landscaping and people's life, landscaping and forest experience, landscaping and disaster prevention and mitigation, and landscaping and cultural perception. A total of 1 16 scientific and technological achievements in ecological construction, industrial development, security, disaster prevention and mitigation, landscaping and other aspects related to culture, people's livelihood and health were displayed, and 27 popular science activities with rich contents and various forms were organized. The activity combines the scientific and technological innovation of landscaping with cultural innovation, displays the scientific and technological innovation achievements of the capital landscaping in the form of popular science, popularizes the scientific and cultural knowledge of landscaping, guides the public into the forest, and carries out various experience activities to perceive, deepen and enrich the cultural connotation of the forest.
4. The standardization of landscaping in the capital has been comprehensively promoted.
36,000 copies of 28 standards, such as Technical Specification for Forest Ecosystem Construction in Plain Area and Landscape and Ecological Forest, were printed for the use of industry personnel in the city. In order to promote the overall construction of landscaping standardization work, strengthen the organization and leadership of landscaping standardization work, and better promote the rapid and healthy development of standardization work, the preparatory work of Beijing Landscaping Standardization Committee was organized. After all the preparatory work, the Beijing Municipal Bureau of Quality and Technical Supervision has approved the establishment of the Beijing Landscaping Standardization Technical Committee.
5, popular science propaganda work has achieved remarkable results.
With the theme of "going into the forest and perceiving culture", more than 50 popular science activities, such as publicity and exhibition activities of the National Science and Technology Week and Beijing Science and Technology Week, forest experience and long trip around the lake, were carried out, with an audience of more than 6,543,800 people. At the same time, the "Demonstration Project of Adding Colors and Expanding Greenness in the Capital" was introduced into the Science and Technology Week, and more than 0/0 kinds of colorful, drought-resistant and long-green tree species such as "Xia Zi", "Golden Leaf Fraxinus" and "Huayuanfa" boxwood were highlighted.
6. The demonstration area will be fully implemented.
A total of 17 science and technology innovation demonstration zones have been established from the aspects of sustainable forest management, multifunctional forest management, nature and wetland protection, carbon sequestration afforestation, germplasm resources, flower industry, fruit tree industry, urban landscaping, sand prevention and control, forest economy, etc., so as to better play the role of science and technology innovation teams and serve the ecological civilization construction and economic and social development of the capital.
Second, the work plan
1, continue to do a good job in scientific research and popular science.
Establish a scientific research project repository, effectively guide scientific and technological projects to declare and establish projects, and strengthen supervision and inspection of various scientific and technological projects. Organize the activities of "Green Science and Technology, Colorful Life-20xx Landscaping Science and Technology Innovation and Popular Science Publicity Month" to popularize the scientific and technological achievements of landscaping. Organize the training of nature instructors, and ensure the healthy and orderly development of popular science education in landscaping by establishing the qualification system of nature education.
2, continue to do a good job in the implementation of science and technology action plan.
Strengthen the construction and management of innovation team expert database, and do a good job in the implementation of science and technology action plan according to the requirements of science and technology action plan, based on innovation team, demonstration area and popular science base.
3. Promote the construction of forest ecological monitoring network in Beijing.
Promote the planning and construction of Beijing forest ecological monitoring network index system and monitoring system, strive to complete the planning of Beijing forest ecological monitoring network system in 20xx, and implement the construction of Beijing forest ecological monitoring station.
4. Pay close attention to the standardization construction of landscaping and promote the comprehensive construction of landscaping.
(1) Do a good job in the formulation and revision of landscaping standards and the construction of the Beijing Landscaping Standardization Technical Committee;
(2) Do a good job in the popularization and application of standards, standardization demonstration areas and standardization base construction;
(3) Pay special attention to the publicity, implementation and training of standards.