The whole formula is not clear, and I feel lack of boundary conditions:
1, the transverse slope of soil subgrade that needs to be reshaped after excavation is generally+0.1%;
2. What is the excavation slope on both sides of the roadway? Generally1:1.5;
3. Does the average digging depth mean the digging depth at the center line of the road?
If the above boundary conditions are determined, then the calculation of earthwork is a mathematical problem!
What to say? I don't know if I understand it. Does it help?