Workpiece polishing: workpiece polishing;
Compensator: Badigan/paint/putty/filler;
Grinding:
Spray cleaning: cleaning;
Manual dust removal: manual dust removal;
Automatic dust removal: automatic dust removal;
Priming with primer;
Cold leveling: cold flow;
Baking: drying;
Next piece inspection (excluding defects): inspection;
Spray finish: finish;
Packaging: packaging.
Generally, it takes less than two hours from the beginning to the end, in which the filling and grinding time is the longest, and the cold leveling and baking time is 6- 12m/min times 9- 15m.
Generally speaking, it takes less than two hours, of which putty and polishing take longer. Cold flow and drying are 6-12m/min and 9-15m/min respectively.