Current location - Plastic Surgery and Aesthetics Network - Plastic surgery and medical aesthetics - Organization design scheme of land leveling construction
Organization design scheme of land leveling construction
Catalogue of land leveling construction schemes

Directory 1-2 Chapter 1 Compilation Description and Project Overview 3-8

Chapter II Organization 8-28

Section 1 Responsibilities of Project Department Personnel 8- 12

Section 2 Main Responsibilities of Departments 12-26

The third quarter construction preparation work 27-28

Chapter III General Layout of Construction 29-3 1

The fourth chapter site construction survey and material reinspection 3 1-38

The fifth chapter construction scheme and technology 38-73

The first section construction survey unreeling 38-40

Section 2 Slope Blasting Scheme and Technology 4 1-47

Section 3 Earthwork Excavation and Transportation 47-49

The fourth quarter road subgrade earthwork filling 49-55

Section 5 Construction scheme and technology of mortar masonry 55-57

Section 6 Construction Scheme and Technology of Concrete Engineering 58-65

Section 7 Road Engineering Construction Scheme and Technology 66-73

Chapter VI Quality Objectives and Quality Assurance System and Measures 74

The first section quality objectives 74

Section 2 Quality Management Organization 74-79

In the third quarter construction project quality control measures 79-80

Section 4 Technical Measures to Ensure the Quality of Bridges and Culverts 8 1-82

Section 5 Technical Measures to Ensure Construction Technology 82-83

Section 6 Technical Measures to Overcome Common Quality Defects 83-86

Section 7 Construction Quality Warranty Return Visit Measures 86-87

Section 8 Project Quality Management Reward and Punishment System 86-99

Chapter VII Construction Environmental Protection and Soil and Water Conservation Measures 99- 105

Chapter VIII Labor Organization Plan 106- 107

Chapter 9 Main Construction Machinery and Equipment 107- 109

Chapter 10 Safety and Civilized Measures 1 10- 120

Section 1 Safety Measures110-117

Civilized construction measures in the second quarter117-119

Section 3 Cultural Relics Protection Measures 1 19- 120

Chapter XI Comprehensive Management Level 120- 137

Section 1 Guarantee Measures for Land Requisition and Demolition 120- 122

The second quarter about engineering insurance guarantee measures 122- 123

Section III Safeguard Measures for Standby and Replacement Equipment 123- 124

Section 4 Economy Measures 124- 125

Section 5 rainy season construction management 125- 127

Section 6 Comprehensive Management Measures for Safety and Civilization 127- 133

Section 7 Comprehensive Management Measures for Finished Product Protection 133- 137

Chapter 12 Time limit for a project and schedule 137- 139

Attached drawings Construction General Plan 140 Chapter I Compilation Description and Project Overview

Compilation basis:

1, Neijiang Hua Xun Construction Engineering Consulting Co., Ltd. provides the bidding documents and construction drawings of Neijiang City Central District Land Development Project Neijiang City Central District Quanan Land Consolidation Project.

2. Drawing Q&A summary and relevant addendum materials.

3, the current norms, regulations and relevant provisions promulgated by the national water conservancy and hydropower departments and land and resources departments.

4. Relevant information obtained from field investigation.

5. Our company's existing management level, labor force, financial resources, equipment, technical ability and rich construction experience accumulated in water conservancy and hydropower, transportation, housing construction and other projects for a long time.

6, in accordance with the requirements stipulated in the tender documents, according to the characteristics of this project, the time is short and the effect is early, so as far as possible, the construction period is arranged in advance.

7. On the premise of ensuring the engineering quality, adhere to the principles of seeking truth from facts, respecting science, advanced technology, being scientific and reasonable, being economical and reasonable, actively adopt new technologies, new processes, new machines and tools, new materials and new testing methods, and make use of existing information network system resources.

8. Ensure continuous, balanced and orderly construction, reasonably arrange the construction procedures of the project, achieve reasonable layout, highlight key points, fully implement, adopt the method of combining parallel and flow production, correctly select construction methods, scientifically organize and balance production, closely link the working procedures of various projects, and avoid unnecessary duplication of work.

10, arrange the construction progress at the same time, pay full attention to the point, because of the width, ...