Current location - Plastic Surgery and Aesthetics Network - Plastic surgery and medical aesthetics - Division of Bid Section of the Second Double Line of Lanzhou-Xinjiang Railway (Hami-Urumqi Section)
Division of Bid Section of the Second Double Line of Lanzhou-Xinjiang Railway (Hami-Urumqi Section)
The second line of Lanzhou-Xinjiang Railway from Hami to Urumqi (mileage interval is DK13/KLOC-0+000 ~ DK1834+488.6438+081).

The second double-track project of Lanzhou-Xinjiang Railway (Hami-Urumqi section) was newly built, with a total investment of 50.063 billion yuan, of which 43.529 billion yuan was static investment.

Total engineering quantity of the construction project: the total length of the line is 5 18438+04 km; Among them, there are 50,829,500 cubic meters of earth and stone works for subgrade, 55,273.86 /38 extra-long double-line meters, 27,597.36/147 large and medium-sized double-line meters, 9602.05 square meters /53 box-type bridges, 262 1.2 square meters /4 underpass bridges and 5,000 new culverts. Distribution of stations: there are 10 stations, and 9 stations have been opened recently, including 2 regional stations (Hami and Urumqi), 4 intermediate stations (Tuha, Shanshan North, Turpan North and Daheyan) and 3 off-road stations (Liushuquan South, Hongdian South and Yanhu West).