Common tools
Tape measure and level
Common materials
Raw material adhesive tape, glass glue or sludge
Reserved position
According to the sewage outlet of installed products, the sewer pipe is reserved at an appropriate position far away from the wall, and the distance between the entrance of the sewer pipe and the ground is determined.
Retaining pit
The pit depth of stainless steel squat toilet reserved underground is greater than the height of toilet.
Air inlet interface treatment
Insert the connecting rubber plug into the water inlet hole of stainless steel squatting pan and clamp it. Coat a layer of glass glue or putty on the outer edge in contact with the water inlet hole of stainless steel squatting pan, and put the glue into the water inlet hole to make it seal well with the rubber plug to prevent water leakage.
Water outlet interface treatment
Coat a layer of glass glue or putty on the edge of the stainless steel squatting pan outlet, insert it into the inlet of the sewer pipe and tighten it, and use coke residue or other fillers to stand the toilet horizontally.
Check the water leakage
Open the water inlet system and check whether there is water leakage at each joint. If there is water leakage, check the situation at each joint. Until the problem is solved.
Fill the surrounding area
After checking that there is no water leakage at each joint, fill the periphery of the toilet with fillers, and fill the contact surface between ceramics and cement mortar with elastic materials such as asphalt or linoleum above 1cm.