Please do this when installing the motor and V-belt! At the beginning of installation, the levelness of the motor should be corrected so that the center lines of the grooves corresponding to the two pulleys coincide and the tension of the V-belt is moderate, and then the fixed screen surface should be installed as required.
Second, check the fixing of the connecting parts of the circular vibrating screen (such as sieve plate and vibration exciter, etc.). ). The screen should be evenly tensioned to prevent the failure caused by local vibration. After completion, check whether there is any leakage in the wiring between the motor and the control box, and manually rotate the transmission part to see if the action is normal.
Third, please do this when installing the lifting device! At the beginning of installation, the foundation should be leveled first, and then all parts should be arranged neatly according to the installation drawing of the supporting or hanging device and the circular vibrating screen. Springs can be installed according to the marked testing machine.
Four, adjust the levelness of the equipment, remember to keep both ends parallel to eliminate the deflection of the screen box, and pay attention to check the screen in and out of the chute and small hopper to see if there is enough collision, if any, handle it in time.
5. Check the flexibility of the vibration exciter. After turning the pulley by hand to make the eccentric block out of the balance position, it should be able to swing freely for several times. If the sieve is installed more than half a year after arrival, the vibration exciter should be completely removed, cleaned and oiled.
6. Check the fastening of all bolts of circular vibrating screen.