First, before signing the contract, you should know fairly well.
more
Second, make clear the material supply of both sides.
more
Third, seek the reference quotation for hydropower transformation.
more
Four, clear construction drawings
more
Five, clear payment time
more
Sixth, rewards and punishments are clear.
more
Seven, the contract documents should pay attention to the construction details.
more
Eight, try to avoid impossible clauses.
More procedures for fire inspection and acceptance of decorative homes in Huaxi, Chengdu: 1 After the completion of the construction project, the construction unit needs to apply to the fire control institution for the fire control acceptance of the completed project, and it can only be put into use after it is qualified.
2. After accepting the case, the specific personnel of the fire control institution need to check whether the information meets the requirements. If it does not meet the requirements, it is necessary to inform the applicant in time and make it up, and notify the construction unit to make preparations before acceptance within 1-2 days.
3. According to the provisions of the acceptance procedures, there shall be at least 2 fire supervisors for on-site acceptance, and a system shall be required, and they shall wear fire supervision and inspection certificates.
4 to participate in the acceptance of the construction, construction, design units have opinions or questions, fire control institutions acceptance participants should give a reply, can not be answered on the spot, it should be explained.
5. After the acceptance or review results of fire protection projects are qualified, all units and fire control institutions shall sign the acceptance declaration form.
6. The project acceptance organizer should fill in the acceptance opinions in time, submit the batch form, sort out the acceptance files and send them to the leading office for approval.