In daily study, work and life, unexpected things may happen. In order to minimize the adverse effects caused by accidents, it may be necessary to prepare emergency plans in advance. How to prepare an emergency plan? The following is a sample of the warehouse fire emergency plan I collected, which is for reference only and I hope it will help you.
Emergency Plan for Warehouse Fire 1 I. Fire:
(1) Preventive measures:
1. No one in the reservoir area is allowed to smoke or use open flames.
2. It is strictly prohibited to use inflammable and explosive dangerous goods in the reservoir area.
3. The electrical equipment in the reservoir area should be used in accordance with the regulations, and it is strictly forbidden to overload electricity to prevent the circuit from catching fire.
4. It is forbidden to pull the power cord privately, and it must be operated by professionals when necessary.
5. It is forbidden to use flammable solvents such as alcohol as cleaning liquid to wipe articles.
6. Fire extinguishers should be placed in corresponding positions according to regulations, and it is forbidden to pile up anything before fire control facilities, so as to keep the fire escape unblocked.
(2) Emergency plan:
In case of fire, we should first judge according to the fire location, surrounding terrain and fire size. If the fire is small and the surrounding terrain is easy to put out, you can call the department leader to determine the fire extinguishing method according to the cause of the fire and the characteristics of the burning substance. If there is a fire in electrical appliances and power lines, first cut off the power supply, and then put out the fire according to its cargo characteristics. If the fire has exceeded the range of one meter, you must call the police immediately, and call 1 19 to inform the fire location, fire nature, combustible characteristics, fire location and height, etc., so that the fire brigade can make fire fighting arrangements in time.
Second, falling objects:
(1) Preventive measures:
1. The horizontal stacking height of materials shall not exceed 2.5m to prevent material dumping from hurting people.
2. Always check the stability of items on the shelves to prevent falling objects from hurting people.
3. When loading and unloading, the forklift should be operated smoothly according to the characteristics of the goods to prevent the forklift from falling and hurting people.
(2) Emergency plan:
After the accident, first report to the department leader and determine the treatment method according to the degree of accident injury. For example, those with minor injuries are sent to the infirmary for general treatment. If the injury is serious, call the emergency center immediately 120, and the clinic will handle it accordingly and wait for the ambulance to arrive.
Three, the leakage of dangerous chemicals:
(1) Preventive measures:
1. When purchasing chemicals, the purchasing department should choose environmentally-friendly products that are toxic and less dangerous as far as possible according to the requirements of production technology and on the premise of satisfying the same use effect.
2. For newly purchased chemicals, suppliers are required to provide chemical safety data sheets (MSDS) or obtain relevant data (MSDS).
3. In the process of storage, transportation and loading and unloading, accidents such as leakage, collision and dumping should be prevented.
4. When stored, prevent exposure to sunlight, rain and waste liquid from flowing out, and put it in the designated position of the warehouse as required.
5. It is forbidden to open the packaged dangerous chemicals without permission.
(2) Emergency plan:
1. If there is a small amount of hazardous chemicals leaking, first report it to the competent leaders of the Technical Safety Department and the Operation Branch. As each hazardous product has different treatment methods, it should be treated according to the corresponding MSDS.
2. In the case of a large number of hazardous chemicals leaking, methods such as digging, collecting, diluting with water or burning should be adopted according to the chemical characteristics of the leaked products and MSDS, and the handlers must take corresponding preventive measures according to the characteristics of the leaked chemicals (such as wearing gas masks, acid and alkali proof clothes, gloves and shoes, etc.). ).
Fourth, get an electric shock:
(1) Preventive measures:
1. The daily work should strictly abide by the safe electricity usage specifications, and corresponding protective measures, such as insulating gloves, must be taken for live working.
2. If the workplace is empty, the last employee who leaves must turn off the power.
3. Non-professionals are strictly prohibited to deal with all kinds of electrical faults.
(2) Emergency plan:
1. If there is an electric shock accident, first cut off the power supply and then take rescue measures. It is strictly forbidden to rescue without cutting off the power supply to prevent serial electric shock.
2. Find out the cause of electric shock and report to the superior leader.
Five, mechanical injury:
Mechanical injuries of warehouses mainly include forklift injuries, crown block injuries and stacker injuries.
(a) forklift accident prevention measures:
1. Forklift trucks are forbidden to overspeed, and the speed limit is less than 6 km/h. ..
2. No one is allowed on the moving forklift except the driver.
3. Forklift is forbidden to stand under the fork when loading and unloading goods.
4. Forklift must honk when turning.
5. When the forklift truck needs to run on the ramp, it should run in strict accordance with the slope required in the forklift manual.
6. It is forbidden to drive a forklift after drinking.
7. Forklift drivers are forbidden to answer the phone while driving.
(2) Preventive measures for crown block accidents:
1. Operators are forbidden to drink alcohol before and during class. The operation must be energetic and focused.
2. Before using the crane, the operator should make routine inspection. If the equipment and parts are abnormal, they must be eliminated before using.
You must ring the bell or call the police before driving. Intermittent ringing should also be given when driving close to people during operation.
4. Non-drivers are not allowed to enter the cab casually.
5. When two people are working on the road, they are not allowed to go on the road without prior contact and notice.
6. In case of sudden power failure at work, all the controller handle plates should be reset to zero, and the vehicle can be driven only after checking whether it is in good condition before returning to work. When heavy objects are suspended in the air due to power failure, the operator should make ground personnel avoid them urgently.
7. In any case, lifting heavy objects are not allowed to pass above people, and no one is allowed below the boom.
8. Operators shall cut off the main power supply and put up signs when carrying out traffic maintenance.
9. It is strictly prohibited to use the big and small cars and get on and off the three lines at the same time.
10. The controller should be started gradually, and the controller handle should not be directly turned from the forward position to the backward position. The controller should be turned to zero first, and then to the opposite direction.
1 1.
(3) When operating the stacker, you must concentrate, and it is forbidden to be distracted to prevent mechanical damage caused by uncoordinated operation.
Six, theft:
(1) Preventive measures:
1. Regularly check the firmness of warehouse doors and windows, and immediately contact relevant departments for maintenance, reinforcement or replacement when problems are found.
2. It is forbidden for other personnel to enter the warehouse and stay near the reservoir area.
3. When there are no managers in the warehouse, you must close the window and lock the door.
(2) Emergency plan:
1. Report the theft to the department head as soon as possible.
2. Find out the reason for the theft.
3. Find out the variety, model, specification and quantity of the stolen materials, sort out the stolen list and report it to the relevant departments of the Operation Branch.
2 1 risk analysis of warehouse fire emergency plan
1. 1 accident type
fire
1.2 accident area
Supply station warehouse and district team warehouse
1.3 time of accident, degree of harm and scope of influence.
Accidents are not affected by seasons. The warehouse of this unit mainly stores mechanical and electrical equipment, chemicals and mechanical items, which are only used for production turnover. The warehouse is kept separately. Volatile solvent vapor can form a flammable mixture with air, which is dangerous to fire when it meets heat source and fire source. Once a fire breaks out, it will cause damage to equipment, facilities and buildings, property losses and casualties. After the accident, the main impact is the impact of gas and waste produced by combustion on the environment.
1.4 possible signs before the accident.
There may be signs of smoke and smell before the accident.
1.5 Possible secondary and derivative accidents
The fire accident in the supply station may cause poisoning, suffocation, explosion, power failure and other accidents.
2 emergency job responsibilities
2. 1 emergency rescue team
Team leader: person in charge of the supply station
Members: all managers of the supply station and all personnel of the supply station.
2 emergency job responsibilities
2. 1 Set up an accident emergency self-rescue team.
Team leader: person in charge of grass-roots unit
Deputy leader: deputy leader, technical supervisor and monitor of grass-roots units.
Members: all grass-roots unit operators
2.2 Emergency self-help team responsibilities
2.2. 1 professional education and daily training.
2.2.2 Organize and guide the implementation of self-help actions.
2.2.3 Report the accident to the superior and issue a rescue request.
2.3 Personnel responsibilities
2.3. 1 district leader: formulate emergency rescue plan according to the actual situation at the scene of the accident, and actively organize district players to carry out self-rescue work; Report the basic situation of the accident site and the rescue work to the mine dispatching room in time; Coordinate the problems in the rescue process.
2.3.2 Technical personnel of the district team: they are assistants of the district team leader in organizing self-rescue work, and participate in the formulation of emergency rescue plans under the leadership of the district team leader; Prepare technical data related to accident rescue.
2.3.3 Deputy Captain: Make emergency rescue plan according to the district team, be responsible for organizing the personnel, materials and equipment needed to deal with the accident, and lead the personnel to carry out rescue work; Responsible for completing the rescue work arranged by the district head; Report the basic situation of the accident site and the ongoing rescue work and other accident information to the mine dispatching room in time.
2.3.4 The personnel on duty of the district team: After the accident, they should know the detailed accident information such as the accident process, casualties, basic situation on site, and immediately report the situation to the district captain and the mine dispatching room, notify the district team management personnel and the emergency self-help organization personnel to gather in the duty room, report the accident information to the mine headquarters in time, and coordinate other matters in the accident rescue work.
2.3.5 Monitoring: Take measures to control disasters; Timely report on-site accident and rescue information; Actively organize on-site rescue or guide disaster avoidance.
2.3.6 Employees: actively carry out rescue work under the command of the accident rescue headquarters according to the requirements of accident emergency rescue plans and measures.
3 Emergency treatment
3. 1 Emergency handling procedures for accidents
3. 1. 1 In the event of an accident, the on-site personnel, such as the monitor, team leader and tile inspector, should report to the mine operation department through various communication methods, and organize the on-site personnel to evacuate immediately according to the disaster avoidance route; Set up danger warning signs; Be a good guide for nursing staff.
3. 1.2 The mine dispatching department immediately guides the on-site personnel to evacuate safely, stops the power supply in the disaster area (power failure is not allowed in the heading face), and informs the mine manager to inform the mine rescue team in time for rescue; Notify the medical team to go to the scene.
3. 1.3 immediately start the mine-level plan, and all the staff of the emergency rescue and relief headquarters will be in place quickly to study and decide on the emergency measures on site. Relevant departments should do a good job in the preparation of equipment, materials and drawings for emergency rescue and disaster relief.
3. 1.4 the operation department immediately informs the operation team, the heads of relevant departments and other personnel to gather in the operation department for standby.
3. 1.5 The emergency rescue and disaster relief headquarters ordered relevant units to check the number of casualties. Send rescue workers to investigate the disaster area and formulate and improve the rescue plan according to the location and scope of the disaster area.
3. 1.6 the emergency rescue headquarters ordered the rescue team to carry out planned personnel rescue, emergency rescue and disaster relief work according to the plan.
3.2 On-site emergency measures
3.2. 1 The core of on-site emergency treatment is to control the fire and prevent it from spreading.
3.2.2 In case of electrical fire, cut off the power supply of the line immediately and put out the fire with dry powder fire extinguisher.
3.2.3 In case of grease fire, use dry powder fire extinguisher, fire sand, etc.
3.3 Contact information and report content of accident report
After the accident, the monitor, team leader, tile inspector, security inspector and other personnel at the scene of the accident should report to the mine operation department in time.
Report content: the unit where the accident occurred and the time and place where the accident occurred; A brief history of the accident and the number of people in distress; Accident rescue and treatment and measures taken; Matters related to the need for mine clearance departments and units to assist in accident rescue and handling.
Reporting requirements: the reporting personnel should not panic, articulate clearly when reporting, and the reporting content should be concise and to the point.
4 Preventive measures
4. 1 Strengthen the inspection of the warehouse of the supply station and rectify hidden dangers and problems in time.
4.2 The warehouse of the supply station should reserve enough emergency and relief materials, and it is strictly prohibited to misappropriate them. Check the fire-fighting equipment carefully during the shift change, and report to the personnel on duty in time if any problems such as lack or damage are found, and complete them in time.
4.3 After the fire broke out, the on-site personnel should take immediate measures to cut off the power supply and remove flammable materials to prevent the accident from further expanding. If the fire is large or develops rapidly, the ambulance team should be notified immediately for rescue.
4.4 self-help personnel shall have the right to take all effective measures to organize emergency rescue according to the site conditions, but they shall report to the mine commander in chief in time.
4.5 self-help personnel must obey the command, do a good job of self-protection and mutual insurance, and work on the premise of ensuring the safety of themselves and equipment.
4.6 In case of personal injury or damage to equipment and facilities, in addition to taking necessary measures to stop the accident from expanding and rescue the injured, measures should also be taken to protect the site, which can only be continued after the accident investigation.
;