I. Process flow
Cleaning and sorting the grass-roots ground-leveling with cement mortar-setting elevation, setting out-selecting materials-wetting plate-installing standard blocks-paving cement mortar-paving stones-caulking-cleaning-maintenance and completion.
Second, matters needing attention
(1), before paving, try to spell stone, flower, color and number to ensure that the laid ground is consistent in design and color;
(2), stone must be soaked in a cool place to dry, so as not to affect its condensation and hardening, empty drum, shell and other problems;
(3), after the completion of the shop is stuck, 2~3 days can't someone trample;
Third, the construction points
Grass-roots treatment should be clean, and uneven places should be leveled and repaired first. The base should be clean and free of mortar, especially white mortar, ash and oil stains. After cleaning, the ground should be wetted with water, and standard blocks must be placed when paving stones and tiles. The standard block shall be placed at the intersection of the crosshairs and installed diagonally. When paving, each line should be hung in turn. Stones must be soaked in water and wet, and then wiped on the back after drying in the shade. It is very important to maintain the stone tiles after they are laid on the ground. After 24 hours of installation, it must be cured in the sun and finally covered.