The total mileage is 20 kilometers; Qingping Road (Bao Tong Street-Railway) and Yuquan Street (Qingping Road-Bailang River) are two common ditches with a total mileage of 6.95 kilometers. The total investment is about 1 1 billion, and it is planned to be completed by the end of 2022.
On September 17, the successful candidate for the design of Qingping Road Crossing Railway Bridge, a comprehensive development PPP project in the south square area of Weifang Station, was announced, and China Railway Fourth Survey and Design Institute Group Co., Ltd. became the first candidate.