Huangmaozhou Bridge belongs to the third-class highway bridge in the plain and hilly area, located in Huangmaozhou Town of our city, crossing the spillway of Lei Chi, connecting X009, the eighth line of the county road fork road in Shuangchahuan in the south, and X008, the land music line in Datong Lake in the north. The total length of the bridge is 6015.55m, in which the main bridge1410.6m, the bridge width10m, the approach bridge is 3943.95m, and the connecting line of Huangmaozhou Town is 600m. The estimated total investment of the project is 65,438+0,565,438+0.75 million yuan, and the construction period is two years and six months.