Current location - Plastic Surgery and Aesthetics Network - Wedding supplies - Jieshi wedding service shinco
Jieshi wedding service shinco
Jieshi Formation plot: won by Vanke, with a total transaction price of 7.5 million yuan and a floor price of 4,000 yuan/m2;

Yu Zui Group's 254 mu plot: Liangjiang Real Estate won the bid, with a total transaction price of 1, 244,654,380+0.8 million yuan and a floor price of 5,354/㎡;

Plot 0 120 153

Item 4-4

The plot is adjacent to Dongcheng Avenue in the east, Shiqiaoping public rental house in the south and existing land in the west and north.

Position analysis

The project is located in the boundary stone plate in Banan District. This plate is currently in a period of rapid development. Driven by the favorable planning of the new town in the east, relying on Chongqing Digital Industrial Park, Chongqing Highway Logistics Base and Chongqing Hua Mu World, listed companies in high-tech industries have settled in one after another. At present, it has developed into the "wisdom valley" of Banan. The strong support of industry has promoted the formation of new urbanization in Jieshi, making Jieshi a livable place in a new city.

Drawing matching

Business: Houhuang Fortune Plaza, New Territories Commercial Street, Xinke City Plaza, Vientiane City Plaza, Tiecock Trade City, Huasheng Outlets, etc.

Transportation: Lanhai Expressway, Inner Ring Expressway, Dongcheng Avenue, Qing Ji Tunnel, G2 10 and other main roads are connected to the outside, and the road network in the core area of the plate is perfect, with convenient internal transportation. The long-term planning of Line 8 and Line 20 will strengthen the connection with the North District in the future.

Education:

Medical treatment: Chongqing Trade Union Hospital, etc.

Planning restrictions

1, S55- 1/0 1, s56-1/0, S57- 1/0 1 height limit 30m, s52-2/00.

2. The bidder shall pay 50% of the land transfer price (including bid bond) within 30 days from the date of signing the Contract for Transferring the Right to Use State-owned Construction Land, and the remaining price shall be paid before 202 1.

3, configure a garbage collection point, land area of not less than 80㎡. S56- 1/0 1 plot is equipped with 1 public toilets with a construction area of not less than 60m2, which should be open to the public 24 hours a day and arranged along municipal roads; Community homes with an indoor construction area of not less than 3,300m2 are planned, including: convenience service center (community service station) 800m2, police room 50㎡, day care center for the elderly 750m2 (including community canteen function), health service station 300㎡, community cultural activity room 300㎡ and vegetable shop (cheap supermarket) 500㎡. The outdoor venue of the community home should be arranged near the community home, and the outdoor venue area should not be less than 1 500㎡, including two functions: first, the outdoor venue area of the multi-functional sports venue should not be less than 1 000㎡, and it has the function of a cultural square with an open-air stage and a five-a-side football field; Second, the outdoor area of the day care center for the elderly is not less than 500 square meters; S56- 1/0 1 plot planning and construction-There are 9 classes in kindergarten, with a building area of not less than 2,700 ㎡ and an independent outdoor playground, with an area of not less than 60㎡ for each class. S60- 1/0 1 The plot is equipped with 1 public toilets with a construction area of not less than 60m2, which are open to the public 24 hours a day and arranged along municipal roads.

4. Commencement and completion time: the land shall be started within 3 months after delivery and completed within 3 years after commencement.

02? Prot. 20 154

Item 4-4

The plot is adjacent to Modern Avenue in the north, with existing land on the east, south and west.

Position analysis

The plot is located in Yufu Industrial Park, Jiangbei District. This plate is mainly an industrial park, the first start-up area and centralized exhibition area of industrial development in Liangjiang New Area, and the most important water, iron and bus base and port logistics distribution center in the western region.

Drawing matching

Business: Longxing Ancient Town, Film and Television City, Guo Min Street, Chongqing Jihuayuan, Longhu Tianjie, etc.

Transportation: At present, the main road network consists of Ring Expressway, Fu Sheng Avenue,10/provincial highway, Modern Avenue, Liangjiang Avenue, Long Jun Avenue and Shanghai Expressway. After the completion of the first horizontal line, it can go directly to Jiangbei Airport. Track No.4 is under construction. Track No.8, 15 and 20 are planned in the long term, and the regional railway network will continue to be encrypted in the future.

Teaching in Yu Zui Campus and Liangjiang International.

Medical treatment: Lack of medical facilities.

Planning restrictions

1, O58-5, O60-2, O6 1- 1, O63-2 and O64-2 are 20m, O65- 1, O66- 1 and o64-2 respectively.

2. The bidder shall pay all the land transfer fees within 10 days from the date of signing the Contract for Transferring the Right to Use State-owned Construction Land.

3.O68- 1 Plot Planning Vegetable Market, with a land area of not less than 2,500m2 and a building area of not less than 2,000m2. There should be independent entrances and exits, and garbage collection stations, parking places for motor vehicles and non-motor vehicles, and crowd distribution spaces should be set up. Planning a public toilet with a construction area of not less than 60m2, which should be open to the public and laid along municipal roads; Plan an opening and closing station, with a construction area of not less than 200m2, considering the layout scheme of the plot building; The planned garbage collection station covers an area of not less than 80m2. There is a 200m2 opening and closing station planned for plot O60-2. O67- 1 Plot is centrally planned to build a comprehensive community service center with an indoor construction area of not less than 2,700 ㎡, including: convenience service center (community service station) of 800㎡, police office of 50㎡, day care center for the elderly of 750㎡ (including community canteen function), health service station of 300㎡, community cultural activity room of 300㎡, and vegetable shop () The outdoor area of the multifunctional sports ground with two functions is not less than 1000m2, which has the functions of a cultural square and a five-a-side football field, and is equipped with an open stage; Two, the elderly day care center outdoor venue area of not less than 500 square meters. 067- 1 plot is combined with 9 classes of kindergartens in the planning department of the community comprehensive service center, with a construction area of not less than 3 145m2 and a land area of not less than 3240m2, and should have an independent outdoor playground.

4. Commencement and completion time: the land shall be started within 3 months after delivery and completed within 3 years after commencement.