What procedures do you need to go through for fire fighting renovation?
Generally, there are four steps in the fire fighting reconstruction procedure, as follows:

1, which requires fire protection design according to the indoor layout;

2. Three parties or even many parties will combine drawings to avoid pipeline fights during high-altitude construction;

3, according to the jurisdiction of the region and the relevant building specification requirements for construction;

4. According to the actual situation of the site, the site reconstruction mainly includes five aspects, namely, fire hydrant system, automatic sprinkler system, automatic fire alarm system, strong smoke exhaust system and evacuation indication system. This is based on the actual situation after the design and transformation, some will change five systems, basically will change more than three systems.

Fire fighting reconstruction is also called secondary fire fighting. Simply put, it is to carry out all or part of the secondary fire protection decoration of the main building.

The process of fire control reform.

I. On-site investigation

Find a professional company with fire control construction qualification and tell them the basic information and needs of the place that needs to be transformed. General companies will arrange professionals to conduct on-site investigations to confirm the fire infrastructure, the number and brand of fire alarm systems, the mode and quantity of emergency evacuation systems, and so on.

Second, the fire renovation quotation

After the content of the fire-fighting renovation is determined, the fire-fighting company will give a budget price, and the two parties can sign the contract after confirmation.

Third, the fire protection design

Large-scale fire-fighting reconstruction projects need professional design institutes to draw drawings, and small-scale fire-fighting reconstruction projects can also be drawn by companies with fire-fighting design qualifications. The specific selection can be based on their own needs. After the completion of fire protection design, if it is a mandatory project, it is necessary to declare the fire protection design audit, and non-mandatory projects can be declared after the completion of construction. Sometimes, the quotation order of fire protection design and fire protection renovation will be adjusted here, and some projects will be quoted according to the design drawings first.

Fourth, the fire reconstruction construction

After the fire protection design is approved and the fire protection construction permit is obtained, the on-site construction of fire protection facilities can be arranged.

Verb (abbreviation of verb) fire control facilities inspection

After the fire-fighting renovation, it is necessary to conduct fire-fighting inspection and acceptance of fire-fighting facilities to ensure that the building fire-fighting facilities meet the requirements of the code, and some areas also require fire-fighting inspection and acceptance reports.

Six, declare the fire inspection and acceptance

Finally, it is necessary to declare fire control acceptance or fire control acceptance for the record. The Emergency Management Department of the Ministry of Housing and Urban-Rural Development will conduct fire safety inspection on the construction unit, and issue fire acceptance opinions after passing the acceptance.

legal ground

People's Republic of China (PRC) building law

Article 4 The state supports the development of the construction industry, supports the research of building science and technology, improves the level of building design, encourages energy conservation and environmental protection, and advocates the adoption of advanced technology, advanced equipment, advanced technology, new building materials and modern management methods.

Article 5 Construction activities shall abide by laws and regulations and shall not harm public interests or the legitimate rights and interests of others.

No unit or individual may hinder or obstruct the construction activities carried out according to law.