Toilet maintenance contract

Employer (Party A):

Contractor (Party B): Haikou Yuyang Waterproof Decoration Engineering Co., Ltd.

In accordance with the provisions of the Economic Contract Law of the People's Republic of China and the Regulations on Contracts for Construction and Installation Projects, and in combination with the specific conditions of this project, both parties have reached the following agreement.

Article 1 General situation of the project

1. 1 project name: toilet maintenance project.

1.2 project site:

1.3 scope of contract: toilet

1.4 contract mode: contract work, contract materials, contract quality, contract management, contract safety and other general modes.

1.5 time limit for a project: this project started on, 20 14 and was completed on,.

1.6 project quality: Party B shall ensure that Party A's bathroom waterproofing works reach excellent standards, and carry out the construction in strict accordance with the new standards of Hainan waterproofing works and Party A's requirements. The coating project shall ensure no peeling, hollowing, delamination, dew point and flatness, and have certain adhesion with the base to meet the design thickness and other quality requirements. .

1.7 project cost: every square 30 yuan of waterproof toilet shall be settled according to the actual area.

Article 2 Work of Party A

2. 1 Put forward the construction plan in advance, arrange the working face to meet the waterproof construction standard, and submit it to Party B for construction.

2.2 The construction period plan should be put forward, but the inevitable factors such as weather and manpower should be considered, and the construction period should be postponed.

2.3 Party A has the right to supervise and inspect the quality of Party B's project during the construction process. When problems are found, Party A has the right to require Party B to make rectification within a time limit. __

Article 3 Party B's Work

3. 1 Participate in the on-site disclosure of construction quantities and directions or practices organized by Party A, draw up the construction plan and schedule, and submit it to Party A for approval.

3.2 Party B is appointed as the on-site representative of Party B to be responsible for the performance of the contract. Organize the construction according to the requirements, ensure the quality and quantity, complete the construction tasks on schedule, and solve all matters that Party B is responsible for.

3.3 Strictly implement the construction specifications, safety operation procedures, fire safety regulations and environmental protection regulations. Participate in the completion acceptance and prepare the project settlement.

3.4 Before the completion of the project is handed over to Party A, be responsible for protecting all facilities and finished products at the site.

3.5 Construction shall be carried out in strict accordance with waterproof engineering standards. When problems are found, solve them in time to ensure the quality of the project to reach excellent standards, and the project is guaranteed for five years. In case of leakage within five years, Party B shall be responsible for all losses. (including the losses caused to the downstairs)

Article 4 This contract is made in duplicate, each party holds one copy, which has the same legal effect. When the five-year warranty expires, the contract will automatically become invalid. Matters not covered in this contract shall be settled by both parties through consultation.

Party A (seal): Party B (seal):

Representative: representative:

Company address: Company address:

Tel: Tel: