Current location - Plastic Surgery and Aesthetics Network - Wedding supplies - What matters should be paid attention to in the renovation of new houses in Zhongshan?
What matters should be paid attention to in the renovation of new houses in Zhongshan?
What is the most important engineering link in the process of home decoration? I believe that friends who know a little about the decoration know that it is the concealed works in the decoration, such as hydropower transformation. Because these are all construction projects buried in the wall, there must be no mistakes in the construction details, otherwise it will cause a lot of unnecessary troubles. Then, what details should be paid attention to in the renovation and acceptance of new houses in Zhongshan? Let's take a look at the small series of Zhongshan Decoration Company.

First, the details of the new house decoration in Zhongshan must not go wrong.

First of all, we must know the most important hydropower transformation in the renovation of new houses in Zhongshan. According to the construction drawings provided by the home improvement designer, the water and electricity lines and pipelines must be slotted in strict accordance with the standards, and the sockets, switches and water outlets should be accurately positioned to ensure the accuracy and precision of the construction.

Secondly, the renovation of Zhongshan new house, the water pipes are all laid after the elastic line is slotted. In the process of water pipe layout, we must adhere to the principle of "the top does not walk on the ground, and the main water pipe does not move", and carry out reasonable elastic line positioning, cutting along the line, chiseling, cleaning, calculating the pipe length, blanking, hot melt adhesive bonding, pipe clamp fixing and other steps, and each step should be in place to avoid other problems in the later stage. Moreover, heat preservation should be done before laying water pipes to prevent condensation water generated by temperature difference and reduce heat energy loss of water pipes.

Third, do a good job in the layout of water pipes. In the renovation of new houses in Shenzhen, it is necessary to arrange pipelines according to construction drawings. At this point, it should be noted that strong electricity and weak electricity should be arranged in charging; Pipes running at the top and on the ground shall be fixed with pipe clamps to ensure neatness and straightness, thus ensuring safety.

Finally, the pipe clamp is fixed in the groove, and the pipe groove is painted. Among them, pay attention to fully wetting the tank before powder tank, and it is best to brush the deep pipe tank twice to ensure the construction quality and effect.

The details of water and electricity acceptance must be known for the renovation of new houses in Zhongshan.

1. In the details of water and electricity acceptance of Zhongshan new house decoration, it is necessary to check the strong and weak electricity boxes, circuit points and circuit pipeline layout. That is, check the specifications of the wires used and whether the label of each circuit breaker is clearly marked. At the same time, the kitchen and bathroom space loop should have a leakage protector. And confirm one by one according to the points identified on the hydropower design drawing to check whether there are any omissions. The inspection sequence is generally households, restaurants, balconies, aisles, bedrooms, bathrooms and kitchens.

Secondly, in the details of water and electricity acceptance of Zhongshan new house decoration, it is necessary to carry out waterway suppression test. The test water pressure is 0.8MPA, and the pressure drop shall not be higher than 0.05MPA within half an hour. Only when the joint has no leakage can it pass the acceptance.

In addition, during the renovation and construction of Zhongshan new house, attention should also be paid to the inspection of waterway pipeline layout. The design of the sewer pipe should take the shortest distance, and the inclined tee should be used at the corner and the main place to ensure smooth drainage, and the nozzle of the sewer pipe should be protected by a cover plate. The grooves of hot and cold water pipes are different, and the spacing is greater than 15cm. Adhere to the principle of "left cooling and right heating", the shower head is bent with double inner wires, and the spacing is strictly controlled 15cm. In the case that the toilet passes through the ground by water, when the pipeline passes through the wall, it can only pass through the wall with a thickness of 30 cm, which is more conducive to waterproof construction and water leakage. Whether it is the renovation of new houses or second-hand houses in Zhongshan, the renovation of new houses in Zhongshan must be signed and confirmed after all the water and electricity are accepted, so that the quality and effect of the renovation can be more guaranteed!