Current location - Plastic Surgery and Aesthetics Network - Wedding supplies - When will Chongqing Bishan Yunba open? When will Bishan Yunba be put into trial operation?
When will Chongqing Bishan Yunba open? When will Bishan Yunba be put into trial operation?
The total length of Chongqing Bishan Bus Transportation is 15.4 km, starting from Bishan Station of Chengdu-Chongqing High-speed Railway and ending at Bishan Station of Rail Transit 1 Line, with a total of 15 stations. During the period of 202 1 Spring Festival travel rush, Yunba opened the subway station 1 for free, and it is estimated that 20265438 will be available after the trial operation of five stations.

When will Chongqing Bishan Cloud Bar open? Chongqing Bishan Cloud Bar is expected to be put into trial operation in the first half of 20021. At present, the test ride experience has been opened: from February 1 1 to February 24th (the test ride experience time is from 10 to 17 every day).

"Yunba" car in Bishan

Yunba has adopted a series of intelligent innovative technologies, including fully automatic driving, intelligent control, intelligent dispatching, automatic driving and automatic fare collection.

The total length of "Yunba" line in Bishan is 1 5.4km, starting from Bishan Station of Chengdu-Chongqing high-speed railway and ending at Bishan Station of Chongqing Metro1Line. There are 15 elevated stations along the way, passing through Fengxiang Lake Children's Park, Xiuhu Car Camping Park, Xiuhu Park and other urban parks, forming an urban transportation network with other ground transportation, effectively solving urban problems.

The trial operation length of Bishan Bus Transportation is 15.4 km. The line starts from Bishan Station of Chengdu-Chongqing High-speed Railway and ends at Bishan Station of Rail Transit 1 Line, all of which are elevated stations with 15 station. During the 20021Spring Festival this year,

"Yunba" has opened free trial rides at five stations: Metro Line 1 Station, Xiuhu Park Station, Xiushuiwan Station, Children's Park Station and Chengyu high-speed railway station. The test ride experience of Yunba is expected to last until February 24th.

It is expected that the trial operation will be realized in the first half of 20021.

The test ride experience time is from 10 to 17 every day. Each test ride site allows 30 passengers to ride at a time, and requires passengers to prepare health codes in advance, wear masks and open free test ride services. Since then, "Yunba" has been favored by a large number of citizens. The average daily passenger flow is 3000.

At the scene, under the leadership of the staff, the citizens who came to try the ride boarded the "Yunba" in turn. In the "Yunba" carriage, passengers can enjoy the beautiful scenery outside the window or take photos with their mobile phones to enjoy the novel ride experience brought by the "Yunba" in the New Year.