1. The first step of the installation process: determine the decoration style.
Integrated wall Zhuhai where is the whole house with European, Chinese, American, modern and other styles? There are many other styles. Customers can customize according to their own preferences. After satisfying the 3D representation, the construction plan can be displayed, and then the materials can be prepared. Get ready to start!
2. Installation process Step 2: Preparation of decoration tools and materials.
Such as cutting machine multi-angle, steel nail, caulking gun, cutting machine mobile phone manual slotting and other woodworking general tools and consumables, such as nails, absolutely necessary tools, special steel, beautiful joints, structural adhesive, wooden keel, wood board and so on.
3. The third step of the installation process: site cleaning, measurement and positioning.
Clean up construction waste. For local potholes, it must be full or level, and the wall must be flat. Where is the integrated wall in Zhuhai when measuring? As far as possible according to the actual internal area measurement. Some people feel uneasy and only provide unified planning for the community. But I don't know if the actual structure will be slightly changed. Therefore, it is recommended that customers re-measure in place to avoid mistakes and affect the final decoration. affect
4. The third step of the installation process: brand line.
Where is the integrated wall in Zhuhai? According to the design and building size, determine the starting position and joint position of the joint, then synthesize the sprayed horizontal and vertical lines according to the size of each part of the building and the length of the wall to determine the position of the keel, and then erect a wall on the wall of the building. Straight line, keel spacing and height > 30M, height is generally selected between 400 and 500mm.
5. The fourth step of the installation process: the overall structure of the framework.
Integrated wall Zhuhai, where there is our wall barrier, usually creates some styles, and the keel must be installed as the initial frame. Of course, it is not necessary for the keel to be installed on the wall. As long as the flatness of the wall is guaranteed, the embryonic wall can be placed on the wall. The keel of the kitchen and the top of the toilet mentioned here must also be installed, so the keel is essential.
6. Step 5 of the installation process: integrate the wall.
Where can I cut the integrated wall in Zhuhai according to the confirmed design drawings and actual dimensions, paying special attention to the alignment of pattern stitching. When installing, put it in a large area first, and save the treatment methods such as window angle to the end. The first part is the upper part, and the back wall and integrated wall are from bottom to top. The rear wiring board of the first wall panel.
The above is what Bian Xiao told you about how to install integrated wall in Zhuhai. In addition, the owner should pay attention to the fact that when splicing the integrated wall surface, you can gently tap it with a rubber hammer and gently insert it to leave a little loose space to fix the nails. When they meet columns, they can directly paint them on the wall at 90 degrees. Pay attention to the thickness of the reserved wall when slotting, and pay attention to the seams of all lines. It is best to fix the joint with glue. So as to avoid subsequent thermal expansion and cold contraction.