Party A: _ _ _ _ _ (hereinafter referred to as Party A)
Party B: _ _ _ _ _ (hereinafter referred to as Party B)
In order to ensure the safety of life and property of the country and people, and prevent the fire-fighting equipment from working normally due to untimely maintenance, once a fire breaks out, it can't really play the role of automatic alarm and automatic fire extinguishing. Therefore, it is particularly necessary to maintain fire protection system engineering to ensure the normal operation of fire protection facilities. The following fire protection maintenance measures are specially formulated:
Article 1 the scope of fire protection system engineering maintenance
_________________________。
Article 2 Specific contents of maintenance
1, automatic fire alarm system and linkage control system
2, indoor and outdoor fire hydrant system
3. Automatic sprinkler system
4. Flue gas control system
Article 3 Maintenance Requirements
1. For each system of building fire protection project, Party B shall check it once a month and fill in a special form (attached), which shall be signed by both parties.
2. According to the test, maintain the problems occurred and found in the system to restore its normal operation; If the equipment needs to be replaced due to aging or damage, Party A shall be responsible for purchasing and bear the expenses, while Party B shall be responsible for installation, repair and maintenance and bear the expenses of consumables.
3. Party B shall conduct a trial run of the fire pump, blower and range hood once a month to ensure that they can be started normally.
4. If the line is damaged or broken due to indoor decoration, renovation or human factors, the expenses shall be settled separately.
5. Conduct a free training for Party A's full-time firefighters. Party A shall inform Party B of the training time 15 days in advance, and the location and training personnel shall be determined and organized by Party A. ..
Article 4 Responsibilities of both parties
(1) Party A's responsibilities:
1. Party A shall designate a special person to be responsible for the daily maintenance and on-duty work of the fire fighting system, and fill in the daily registration form and daily checklist for system operation.
2. Once Party A's staff finds any problems, they shall promptly notify Party B to handle them, and fill in the maintenance records according to the actual situation, which shall be signed by relevant personnel of Party A and Party B and submitted to both parties for filing.
3. Party A shall designate a special person to be responsible for the construction site, and cooperate with Party B to coordinate with relevant departments. At the same time, Party A shall assign a special person to supervise the maintenance quality of Party B, and put forward opinions in time to ensure the timely and smooth progress of Party B's next work.
4. Party A shall provide Party B with all fire-fighting drawings and materials related to the equipment of this project, so that Party B can maintain it smoothly.
(II) Party B's responsibilities:
1. Party B's telephone number must be answered 24 hours a day. Within 12 hours after receiving Party A's call, Party B must send someone to the site to handle it.
2. Party B shall regularly check the maintenance projects signed according to the contract and repair the equipment within the scope of the project. After each maintenance work is completed, it shall be signed and filed by the responsible persons of both parties respectively.
3. During the construction of this project, Party B shall abide by the relevant government regulations on safety, fire fighting and construction safety, as well as the relevant requirements of Party A.. If Party B violates the above provisions, all responsibilities shall be borne by Party B..
4. After the maintenance work is completed, Party B shall ensure that all fire-fighting facilities are in normal operation and ensure the fire safety of Party A. ..
Article 5 breach of contract
1. If Party B fails to arrive at the site on time for troubleshooting twice, it will be regarded as a breach of contract, and the losses caused thereby shall be borne by Party B. ..
2. In the course of maintenance, if Party A finds that Party B's maintenance quality can't meet the requirements of the contract and specifications, Party B shall compensate Party A at least _ _% of the total contract amount according to the situation.
3. If Party A fails to make payment on time, Party B has the right to ask Party A to compensate Party B for the economic losses of _% of the total contract amount, and Party A shall bear any responsibilities arising therefrom and compensate Party B for all losses. ..
Article 6 Contract cost
The final cost of this contract: RMB _ _ _ _ (including consumables), in words: _ _ _ _ _ _.
Article 7 Term of Contract and Method of Payment
1. This contract is valid for one year and takes effect from _ _ _ _ _ _ _ _ _ _ _ _ _ _.
2. The maintenance fee shall be paid once every 12 months and once every * * * *. The settlement date is _ _ _ _ _ _ _ _ _ _ (in words: _ _ _ _ _ _).
Article 8 Others
1. This contract is made in quadruplicate, with each party holding two copies, and shall come into effect as of the date of signature and seal by both parties.
2. For matters not covered in this contract or any supplement or change, both parties shall sign a supplementary agreement through friendly negotiation.
Party A: Party B:
Legal representative:
Entrusted agent: entrusted agent
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _