The main functions are:
1, which increases the stability of full-house scaffolding poles. Evenly transfer the vertical bar load. The function is to connect the scaffold into a whole and increase the overall stability of the scaffold.
2. When the doorway is 5m, a vertical pole (floor-paving wood at the bottom) and a main pole should be set indoors to bear the load from the small pole.