Party B:
In accordance with the provisions of the Contract Law of People's Republic of China (PRC) and the specific conditions of Party A and Party B, the two parties reached the following agreement through consultation on the principles of equality, fairness and voluntariness:
I. Contents of the Contract
Party A will contract the steel-framed color steel tile shed to Party B for construction. The surface of the steel-framed color steel tile is round, with a minimum height of m and a maximum height of m, and the running water will be discharged from both sides by sinks.
Second, the quality and specifications
1, column adopts
2, the adoption of purlin
3. Welded pipe is used for the beam.
4. The top is made of single-tile color steel with mm thickness and color.
Third, the unit price and settlement
1, and the unit price of color steel for steel roof is RMB/m.
2. The sink is RMB/meter. ..
3. After completion, both parties shall take the measured area of roof color steel tile as the standard.
Four. mode of payment
During the construction period of Party B, Party A will pay off all the project funds in three installments.
1. When Party B's welding materials meet the above specified material standards after acceptance by Party A, Party A shall pay Party B 30% of the total project cost. ..
2. After the steel frame installation, Party A's acceptance conforms to the agreed welding regulations, that is, Party A pays 30% of the total project cost to Party B. ..
3. After the whole project is completed, the remaining part will be accepted by both parties and calculated according to the measured area, and all the project funds will be paid.
Verb (abbreviation for verb) The responsibilities and obligations of both parties.
1. Party A shall provide Party B with electricity and water for construction.
2. Party A shall provide the plane layout of the processing shed and relevant requirements. Provide underground embedded works.
3. The construction and management personnel of Party B must abide by the rules and regulations of Party A's site. Build from scratch.
4. Party B's construction personnel must carry out construction in accordance with the construction operation procedures, and work in a civilized and safe manner. During the construction, Party A is not responsible for any personal injury accidents.
5. In the process of installation and manufacture, Party A leaks water during use due to Party B's negligence, and Party A informs Party B that it must be repaired within 24 hours, thus causing losses, and Party B shall bear corresponding responsibilities.
VI. Term of the Contract
The term of this contract is from MM DD YY to MM DD YY. If Party A has normal water and electricity, Party B shall reasonably arrange the construction period according to Party A's requirements from the date of signing the contract to ensure the smooth production and timely completion of the project.
Seven. others
This contract shall come into effect as of the date of signature and seal by both parties.
This contract is made in duplicate, one for each party. Both parties shall abide by the agreement and cooperate happily.
Party A (official seal): _ _ _ _ _ _
Party B (official seal): _ _ _ _ _ _
Xx,xx,XX,XX
Contract for Building Greenhouse 2 by Party A (the Employer):
Party B (contractor):
Through negotiation, Party A and Party B reached the following agreement on contracting the poverty alleviation project of vegetable greenhouse in xx village15 (3165m2):
1. The contract is valid from, to.
2. Amount of contract fee: 500 yuan per year for each greenhouse.
3. Payment method: From the date of signing the contract, Party B will pay the contract fee of the current year to the town people's government, totaling 7,500 yuan, and the rest will be paid year by year, and the contract fee will be rolled over to the local poverty alleviation and development funds every year.
4. Party A's project shed is located in xx Group, xx Village, xx Town.
5. The greenhouse is only used for planting or breeding production, and Party B shall not change its production purpose or dismantle or build other buildings without authorization. Otherwise, Party A has the right to rectify within a time limit. If Party A fails to rectify within the time limit, Party A has the right to forcibly dismantle and terminate the contract, and all losses shall be borne by Party B. ..
6. The greenhouse contracted by Party B shall be protected. Except for natural disasters, other man-made losses shall be borne by Party B. ..
7. Party B shall not subcontract the contracted greenhouse to others for operation. Once it is found that Party A will terminate Party B's contracting right, the contract will be terminated and the greenhouse will be recycled. The economic losses caused by this shall be borne by Party B itself, and the contract fee shall not be refunded.
8. Party B should know about the establishment of agricultural cooperatives, master the greenhouse planting or breeding technology, sum up experience, and get rich with the surrounding people by passing on, helping and bringing, so as to achieve the goal of * * * getting rich together.
9. Party B must use the poor laborers in xx village when employing workers, and the daily wage shall not be lower than 40 yuan/day.
10. This contract is made in quintuplicate, each party holds one copy, and the other three copies are sent to relevant departments for filing.
Party A:
Party B:
Xx,xx,XX,XX
Construction of Greenhouse Contract 3 Party A:
Party B:
In order to enhance the sense of responsibility of vegetable greenhouse managers, improve the technical ability and management level of growing vegetables, and increase the economic income of greenhouse managers. After research, it is open to all greenhouse managers of the company. The implementation scheme is as follows:
1. The validity period of this agreement is _ _ months (one vegetable growing season), that is, from _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
2. During the contract period (10), the solar greenhouse contractor can receive the basic salary of 600 yuan/mu every month; The contractor of multi-span arch shed can receive the basic salary of 300 yuan/mu every month. After harvesting, determine the output commission reward according to the following table.
3. The output index stipulated by the company is: the products are divided into qualified and unqualified grades (attached table). Qualified persons shall be cashed according to the proportion table of production commission; The unqualified 2 kg is calculated as 1 kg.
4. The greenhouse is located in _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
5. Party A is responsible for water, electricity, irrigation and various means of production in Party B's production and operation, providing production management and production technical services, and unifying varieties, management and services before, during and after delivery. Party B shall be responsible for the production and technical management of greenhouse vegetables in strict accordance with the production technical scheme provided by the company.
6. The greenhouse is only used for vegetable production, and Party B shall not change its production purpose and appearance without authorization. Other buildings shall not be demolished and rebuilt without authorization, otherwise Party A has the right to rectify within a time limit. If Party A fails to rectify within the time limit, Party A has the right to dismantle and terminate the contract, and all losses shall be borne by Party B. ..
7. Party B shall protect the contracted greenhouse. If losses are caused, Party B shall bear the losses and compensate Party A for three times the actual losses.
8. Party B shall report for duty at the time specified by Party A, and obey the management of Party A ... The daily work may not comply with the work schedule, and the working hours may not be counted as 8 hours per day. Others must abide by the company's various systems and articles of association.
9. In case of natural disasters and irresistible factors, this agreement will be automatically dissolved, and matters not covered in this agreement will be supplemented by both parties through consultation.
10. Before _ _ _ _ _ _ _ _
1 1. Liability for breach of contract
12. This agreement is made in duplicate, with each party holding one copy.
Party A: _ _ _ _ _ _ _ _ _
Party B: _ _ _ _ _ _ _ _ _
Xx,xx,XX,XX