1. Appearance: The appearance of Greater Bay Area No.1 is based on dark blue and decorated with crimson rhododendrons, showing a simple style. The appearance of Greater Bay Area II is mainly blue and green with cool colors, and it is decorated with yellow, showing a bright, young and modern feeling.
2. Route: Greater Bay Area 1 Line connects Nansha District and Panyu District, with a total length of about 42.8km, with 2 stations1seat. Greater Bay Area Line 2 connects Longhua District and Baoan District, with a total length of about 39.6 kilometers and 20 stations.
3. Construction time: Greater Bay Area 1 Line 2065438+trial operation on February 28th, 2008. Greater Bay Area Line 2 is still under construction and is expected to open in 2022.
4. City: Greater Bay Area 1 Line is located in Guangzhou, and Greater Bay Area Line 2 is located in Shenzhen.
To sum up, Greater Bay Area No.1 and Greater Bay Area No.2 are different in appearance, route and construction time.